← Back
BuildNYC
Parochial school, yeshiva
6101 16TH AVENUE
BROOKLYN · Bensonhurst · BIN 3132384
💬 Discuss this project
1948Year Built
3Stories
W2Building Class
M1-1Zoning
61,148 sfGross Floor Area
3Units
LL97 Covered3 Active Violations 2 unresolved · 1 paperwork only 12 old, status unconfirmed ▸FDNY Report ↗
Parochial school, yeshiva · Owner of record: Cong. Machne Chaim, Inc., A Religious Co Rporation · 30,000 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBais Sarah School, T-MobileUnder Construction66p · 5 filings · 18 docs
BulkheadBais Sarah SchoolUnder Construction2p · 2 filings · 17 docs
Floor 5Bais Sarah SchoolUnder Construction63p · 5 filings · 18 docs
Floor 4Bais Sarah School, Bais Sarah/cong. Machane ChaimUnder Construction60p · 5 filings · 18 docs
Floor 3Bais Sarah School, T-Mobile +1Under Construction61p · 6 filings · 18 docs
Floor 2Bais Sarah School, T-Mobile +1Under Construction66p · 8 filings · 18 docs
Floor 1Bais Sarah School, T-MobileUnder Construction68p · 8 filings · 18 docs
CellarBais Sarah School, T-MobileUnder Construction64p · 5 filings · 18 docs
Site & exteriorInstallation of pipe scaffolding10p · 2 filings · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cong Machnechaim203/21/2026
Cong. Machne Chaim, Inc., A Religious Co Rporation103/22/2026
LWL Associates103/22/2026
Bais Sara School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Architecture701/22/2026
Sharon Associates912/16/2025
FL&M Engineering Design & Inspection202/14/2024
Skyline Rigging102/14/2024
Elevated Engineering102/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Binyan Expediting1803/21/2026
Millennium Designs of New York103/21/2026
CCM Services Group103/21/2026
City Expediting203/21/2026
BSD Consulting603/21/2026
Green Studio203/21/2026
Millennium Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GWT EnterprisesScaffold603/21/2026
Safety Fire SprinklerFire Protection407/08/2026
HI-Tower ContractorsScaffold404/09/2026
Jodom MechanicalPlumbing407/08/2026
Manhattan D EnterprisesScaffold303/21/2026
HI-Tower ContractorsGeneral Contractor304/09/2026
Solas ElectricalElectrical103/22/2026
Shtral Elect'l Cont'gElectrical103/22/2026
Airmark HVACspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616712/16/2025
Skyline Rigging7880102/14/2024
Building Lifecycle
All (209)Filed (20)Permit Issued (26)Signed Off (7)Violation (60)Inspection (12)Objection (61)Special Inspection (23)
05/13/2026
Objection raised — Other
05/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/06/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/01/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
05/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/22/2026
Objection resolved — Resolved
04/22/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/22/2026
Special inspection requirement — Standpipe Systems
FAHAD FATEH
04/15/2026
Signed off — Alteration
Installation of Fuel Tank for an emergency generator in conjunction with ALT1 application # 320515313
B01103589-I1
04/13/2026
Objection resolved — Addressed
04/01/2026
Permit issued — Plumbing
B00806468-I1-PL
04/01/2026
Objection resolved — Addressed
03/31/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00919774-I1
03/31/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01002916-I1
03/17/2026
Violation issued (FDNY_ORDER, closed)
03/17/2026
Violation issued (FDNY_ORDER, closed)
02/18/2026
Signed off — Alteration
Installation of Fuel Tank for an emergency generator in conjunction with ALT1 application # 320515313
B01103589-S1
02/11/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/09/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
02/06/2026
Objection raised — Admin
01/22/2026
Filed — Alteration
Filing occupant protection plan in conjunction with Alt1 application #320515313, for expansion of the existing school building, to occupy the new right wing floors 001 through 005. Provide temporary partition walls at exit stair A at floors 4, 5,
B01342426-I1
01/22/2026
Objection resolved — Addressed
01/22/2026
Objection resolved — Addressed
01/22/2026
Objection resolved — Addressed
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/20/2026
Signed off — Alteration
Installation of Fuel Tank for an emergency generator in conjunction with ALT1 application # 320515313
B01103589-S2
01/12/2026
Permit issued — Boiler Equipment
B01103589-S1-BE
01/05/2026
Objection raised — Scope
01/05/2026
Objection raised — Cost
01/05/2026
Objection raised — Fire_Protection
01/05/2026
Objection raised — Plumbing
01/05/2026
Objection raised — Fire_Protection
01/05/2026
Objection raised — Scope
01/05/2026
Objection raised — Fire_Protection
12/29/2025
Permit issued — Boiler Equipment
B01103589-I1-BE
12/24/2025
Permit issued — Boiler Equipment
B01103589-I1-BE
12/23/2025
Permit issued — Boiler Equipment
B01103589-I1-BE
12/18/2025
Permit issued — Mechanical Systems
B01103589-S2-MS
12/18/2025
Violation issued (ECB, closed)
Unknown
12/18/2025
Violation issued (ECB, closed)
Unknown
12/16/2025
Filed — Alteration
standpipe and sprinklers work in conjunction with building alteration DOB JOB# 320515313
B00848120-P1
12/16/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
12/16/2025
Special inspection requirement — Standpipe Systems
FAHAD FATEH
12/15/2025
Signed off — Alteration
proposed exterior fence construction
B00763804-I1
12/15/2025
Permit issued — Curb Cut
B01260872-I1-CC
11/03/2025
Objection resolved — Addressed
10/23/2025
Permit issued — Sprinklers
B00848120-I1-EW-SP
10/23/2025
Permit issued — Standpipe
B00848120-I1-EW-SD
09/28/2025
Objection resolved — Addressed
09/28/2025
Objection resolved — Addressed
09/28/2025
Objection resolved — Addressed
09/28/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/08/2025
Objection raised — Structural
Latest 60 of 209 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJodom Mechanical04/01/2026
DOB NOWBoiler EquipmentSigned-offMichael S. Kaplan01/12/2026
DOB NOWBoiler EquipmentSigned-offMichael S. Kaplan12/29/2025
DOB NOWBoiler EquipmentSigned-offMichael S. Kaplan12/24/2025
DOB NOWBoiler EquipmentSigned-offMichael S. Kaplan12/23/2025
DOB NOWMechanical SystemsSigned-offHI-Tower Contractors12/18/2025
DOB NOWCurb CutPermit IssuedHI-Tower Contractors12/15/2025
DOB NOWSprinklersPermit IssuedSafety Fire Sprinkler10/23/2025
DOB NOWStandpipePermit IssuedSafety Fire Sprinkler10/23/2025
DOB NOWPlumbingSigned-offJodom Mechanical07/01/2025
DOB NOWPlumbingPermit IssuedJodom Mechanical03/21/2025
DOB NOWConstruction FenceSigned-offHI-Tower Contractors02/19/2025
DOB NOWBoiler EquipmentSigned-offMichael S. Kaplan12/02/2024
DOB NOWStandpipePermit IssuedSafety Fire Sprinkler07/29/2024
DOB NOWSprinklersPermit IssuedSafety Fire Sprinkler07/29/2024
DOB NOWSuspended ScaffoldPermit IssuedDoria05/01/2024
DOB NOWConstruction FenceSigned-offHI-Tower Contractors03/04/2024
DOB NOWSupported ScaffoldSigned-offGWT Enterprises02/14/2024
DOB NOWSuspended ScaffoldPermit IssuedDoria02/14/2024
DOB NOWMechanical SystemsPermit IssuedAirmark HVAC01/16/2024
DOB NOWSidewalk ShedSigned-offGWT Enterprises01/06/2024
DOB NOWPlumbingPermit IssuedJodom Mechanical12/12/2023
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises08/28/2023
DOB NOWConstruction FenceSigned-offHI-Tower Contractors04/20/2023
DOB NOWAntennaSigned-offPriore Construction Services03/14/2023
DOB NOWConstruction FenceSigned-offHI-Tower Contractors10/21/2022
BIS—ISSUEDHI-Tower Contractors06/13/2025
BISOTISSUEDHI-Tower Contractors05/27/2024
BIS—ISSUEDHI-Tower Contractors05/06/2024
BIS—ISSUEDHI-Tower Contractors04/20/2023
BISOTISSUEDHI-Tower Contractors04/20/2023
BISOTISSUEDHI-Tower Contractors05/05/2022
BISOTISSUEDHI-Tower Contractors05/05/2022
BIS—ISSUEDHI-Tower Contractors05/05/2022
BISOTISSUEDHI-Tower Contractors11/01/2021
BIS—ISSUEDHI-Tower Contractors04/29/2020
BISOTISSUEDTrinity Technologies06/16/2017
BISOTISSUEDSquan Construction Services10/17/2016
BISOTISSUEDSquan Construction Services10/21/2015
BISOTISSUEDSquan Construction Services06/26/2015
+ 20 more permits on file
1 project · most recent 06/30/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2025Permit IssuedAirmark HVACHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM072BTE5 72,700 BTU · Vrf Outdoor ×5
ARUM138BTE5 168,000 BTU · Vrf Outdoor ×5
ARUM144BTE5 144,000 BTU · Vrf Outdoor ×5
Trane YSJ108A3SOH 6,000 CFM · Rooftop Unit ×10
YSJ300A3SOH 10,000 CFM · Chiller ×5
Aaon RN-010-8-0-EB09-3LB 119,600 BTU · Rooftop Unit ×5
RN-025-8-0-EB09-34B 284,660 BTU · Rooftop Unit ×5
Ventilation
Greenheck CUBE-480 20,000 CFM · Exhaust Fan ×5
CUE-099-A 600 CFM · Exhaust Fan ×5
CUE-120-A 950 CFM · Exhaust Fan ×5
CUE-130-A 1,600 CFM · Exhaust Fan ×5
CUE-140-VG 1,300 CFM · Exhaust Fan ×5
CUE-300HP-B 9,800 CFM · Exhaust Fan ×5
DGX-125-H35 20,000 CFM · Makeup Air ×5
SQ-100-VG 850 CFM · Exhaust Fan ×5
SQ-95-VG 350 CFM · Exhaust Fan ×5
1 project · most recent 12/16/2025
FiledStatusContractorScope
12/16/2025Permit IssuedSafety Fire Sprinkler928 heads, 2 outlets
2 projects · most recent 12/16/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
12/16/2025Signed-offJodom MechanicalWater/Sanitary
07/31/2025Permit IssuedJodom MechanicalGas, Storm, Water/Sanitary
4 projects · most recent 07/29/2025
General Wiring
FiledStatusContractorScope
07/29/2025Permit IssuedShtral Elect'l Cont'gGeneral Wiring
05/22/2024Permit IssuedCaputek Electrical Services—
08/22/2023Permit IssuedSolas Electrical—
03/27/2019Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/06/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/01/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/11/2026Pass-Final Boiler Equipment InspectionPassView ↗
06/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/10/2025No Access-Final Boiler Equipment InspectionNo AccessView ↗
03/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/27/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
04/22/2026Sprinkler SystemsFAHAD FATEHspecial
04/22/2026Fire-Resistant Penetrations and Joints—special
04/22/2026Standpipe SystemsFAHAD FATEHspecial
01/21/2026Fire-Resistant Penetrations and Joints—special
12/16/2025Sprinkler SystemsFAHAD FATEHspecial
12/16/2025Standpipe SystemsFAHAD FATEHspecial
09/18/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/18/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/17/2025Public Assembly Emergency LightingFAHAD FATEHprogress
08/17/2025Public Assembly Emergency LightingFAHAD FATEHprogress
08/13/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/30/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/28/2025Mechanical SystemsFAHAD FATEHspecial
07/28/2025FinalFAHAD FATEHprogress
07/28/2025Emergency and Standby Power Systems (Generator)FAHAD FATEHspecial
07/14/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/14/2025Mechanical SystemsFAHAD FATEHspecial
07/14/2025FinalFAHAD FATEHprogress
07/01/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsFAHAD FATEHspecial
06/26/2025FinalFAHAD FATEHprogress
06/26/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
06/26/2025Mechanical SystemsFAHAD FATEHspecial
08/28/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsFAHAD FATEHspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bais Sarah/cong. Machane ChaimReligiousFloors 2–4
Project B01342426 Alteration · Objections · 01/22/2026
Bais Sarah SchoolEducationCellar, Floors 1–5, Roof
Project B01103589 Alteration · LOC Issued · 11/04/2024
Project B00806468 Alteration · Permit Entire · 03/28/2023
T-MobileTelecom siteCellar, Floors 1–3, Roof
Project B00811179 Alteration · LOC Issued · 02/06/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 276 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch14
08/29/2026B00763804-I1Request digital key ↗
08/26/2026B00919774-I1Request digital key ↗
08/26/2026B01002916-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/21/2026B01254307-I1Request digital key ↗
08/20/2026B01273026-I1Request digital key ↗
08/20/2026B01273027-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION25
02/13/2026320515313Open ↗
10/27/2025340919965Open ↗
09/05/2025340919965Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION10
11/01/2021321972335Open ↗
05/14/2019320515313Open ↗
06/20/2017321551076Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
10/04/2019321551076Open ↗
01/23/2019320515313Open ↗
08/18/2017321116797Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/05/2025340919965Open ↗
08/29/2018321826208Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/06/2025320515313Open ↗
▸BISPLACE OF ASSEMBLY1
10/02/2013320740178Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/26/2025320515313Open ↗
▸BISZONING DIAGRAM1
09/20/2018320515313Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/13/2018320515313Open ↗
▸BISZONING APPEAL1
09/13/2018320515313Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026B01002916-I1Open ↗
08/26/2026B01005265-I1Open ↗
08/21/2026B00806474-P1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
01/06/2020321551076Open ↗
12/27/2019321551076Open ↗
12/16/2019321551076Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B01103589-S2Open ↗
08/29/2026B00806468-P1Open ↗
08/29/2026B00806468-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01103589-S2Open ↗
09/20/2026B01103589-I1Open ↗
09/01/2026B00848120-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/05/2025340919965Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
08/06/2007310002163Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/06/2007310002163Open ↗
▸BISPC FULL REPORT1
08/06/2007310002163Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/06/2007310002163Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE5
02/17/2011310002163Open ↗
01/24/2011310002163Open ↗
01/24/2011310310856Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
11/30/2010310002163Open ↗
09/21/2010310002163Open ↗
03/03/2009310310856Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/11/2018320515313Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/10/2015321116797Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
09/05/2025340919965Open ↗
09/13/2018320515313Open ↗
08/29/2018321826208Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/14/2019320515313Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/05/2025340919965Open ↗
▸Environmental & Asbestos26
▸DOB NOWOER: Notice to Proceed7
08/13/2026B00806468-P1Open ↗
08/13/2026B01103589-I1Open ↗
08/13/2026B00848120-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B00806474-I1Open ↗
08/21/2026B00806474-P1Open ↗
08/21/2026B00806468-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
03/03/2009310310856Open ↗
03/03/2009310310856Open ↗
07/15/2008310162800Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/28/2019321972335Open ↗
09/13/2018320515313Open ↗
04/12/2017321551076Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
02/18/2026321972335Open ↗
01/11/2026320515313Open ↗
07/27/2015321116797Open ↗
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026B01103589-I1Open ↗
08/13/2026B01103589-S1Open ↗
08/13/2026B00811179-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
01/06/2020321551076Open ↗
12/27/2019321551076Open ↗
12/16/2019321551076Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
01/06/2020321551076Open ↗
06/11/2018321116797Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/16/2026320515313Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/14/2025320515313Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
08/27/2025320515313Open ↗
08/27/2025321972335Open ↗
06/28/2019321972335Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
02/25/2026321972335Open ↗
02/13/2026320515313Open ↗
06/28/2019321972335Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/16/2026320515313Open ↗
09/20/2022321972335Open ↗
09/20/2022321972335Open ↗
Showing 3 of 4 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT3
07/14/2025320515313Open ↗
06/26/2025321972335Open ↗
05/14/2019320515313Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
07/14/2025321972335Open ↗
09/20/2022321972335Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/25/2026321972335Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
02/25/2026321972335Open ↗
▸Approvals, Objections & Sign-offs43
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/21/2026B00806474-P1Open ↗
08/21/2026B00806474-I1Open ↗
08/21/2026B01254307-I1Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
01/06/2020321551076Open ↗
09/13/2018320515313Open ↗
09/13/2018320515313Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
02/13/2026320515313Open ↗
06/27/2025320515313Open ↗
06/25/2025320515313Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
10/21/2013320740178Open ↗
03/06/2013320515313Open ↗
03/03/2009310310856Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
01/06/2020321551076Open ↗
12/27/2019321551076Open ↗
06/11/2018321116797Open ↗
Showing 3 of 5 on file for this type
▸BISBSA/CPC APPROVAL1
09/19/2018320515313Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT8
06/28/2019321972335Open ↗
09/13/2018320515313Open ↗
06/11/2018321116797Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/11/2026320515313Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/14/2019320515313Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
05/14/2019320515313Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
03/06/2013320515313Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
08/27/2025320515313Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION11
09/20/2022321972335Open ↗
12/14/2021321972335Open ↗
12/14/2021321972335Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET5
06/28/2019321972335Open ↗
08/29/2018321826208Open ↗
04/12/2017321551076Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
01/06/2020321551076Open ↗
12/27/2019321551076Open ↗
06/11/2018321116797Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/05/2025340919965Open ↗
03/06/2013320515313Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/29/2018321826208Open ↗
▸Other Documents7
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS3
02/09/2011310310856Open ↗
01/28/2011310310856Open ↗
01/24/2011310002163Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/13/2018320515313Open ↗
▸BISUNDERPINNING (2014)1
02/18/2026321972335Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01005265-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01005265-I1Open ↗