← Back
Parochial school, yeshiva
St Athanasius Catholic Academy
6102 BAY PARKWAY · Mapleton-Midwood (West) · BIN 3132669
💬 Discuss this project
1938Year Built
2Stories
W2Building Class
R5Zoning
28,106 sfGross Floor Area
1Units
LL97 Covered9 Open Violations 6 unresolved · 3 paperwork only ▸FDNY Report ↗
Parochial school, yeshiva · 40,000 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ST ATHANASIUS SCHOOL303/22/2026
ST ATHANASIUS RC CHURCH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.309/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MICHAEL MOTLEYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947309/05/2025
Building Lifecycle
All (27)Filed (3)Violation (12)Special Inspection (12)
08/06/2026
Violation issued (ECB, open)
Construction
09/05/2025
Filed — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO REPLACEMENT BOILER. REPLACEMENT BOILER FILED UNDER SEPARATE BE APPLICATION. INSTALL TWO (2) ELECTRIC HOT WATER HEATERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01279956-I1
09/05/2025
Filed — Alteration
REPLACE BOILER AND BURNER AND CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. SEPARATE PL APPLICATION FILED FOR GAS PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01279952-I1
09/05/2025
Filed — Alteration
INSTALL STAINLESS STEEL X-FLEX LINER IN EXISTING CHIMNEY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01279957-I1
08/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
08/30/2025
Special inspection requirement — Maintenance information
Gregory Perotto
08/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
08/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
08/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
08/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
08/30/2025
Special inspection requirement — Heating Systems
Gregory Perotto
08/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
08/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
08/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
08/30/2025
Special inspection requirement — Chimneys and vents
Gregory Perotto
08/30/2025
Special inspection requirement — Final
Gregory Perotto
04/27/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/03/2022
Violation issued (ECB, open)
Construction
09/09/2021
Violation issued (ECB, closed)
Boilers
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/08/1993
Violation issued (ECB, open)
Local Law
06/01/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/31/1991
Violation issued (ECB, open)
Local Law
06/15/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDRICHMOND PLUMBING & HEATING, INC08/01/2006
BISOTISSUEDLONG & DELOSA CONST GROUP LTD07/28/2006
BISMHISSUEDG&E MECH08/25/2005
1 project · most recent 09/05/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/05/2025——Gas, Water/Sanitary
2 projects · most recent 11/17/2022
General Wiring
FiledStatusContractorScope
11/17/2022CompleteI.P. ELECTRIC INCGeneral Wiring
07/25/2022Permit IssuedMID CITY ELECTRICAL CORP.General Wiring
1 project · most recent 09/05/2025
FiledStatusContractorScope
09/05/2025——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/30/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
08/30/2025Maintenance informationGregory Perottoenergy_progress
08/30/2025HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
08/30/2025HVAC-R and service water heating system controlsGregory Perottoenergy_progress
08/30/2025HVAC-R and service water heating equipmentGregory Perottoenergy_progress
08/30/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
08/30/2025Heating SystemsGregory Perottospecial
08/30/2025HVAC-R and service water heating equipmentGregory Perottoenergy_progress
08/30/2025HVAC-R and service water heating system controlsGregory Perottoenergy_progress
08/30/2025HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
08/30/2025Chimneys and ventsGregory Perottospecial
08/30/2025FinalGregory Perottoprogress
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026B01279957-I1Request digital key ↗
08/20/2026B01279952-I1Request digital key ↗
08/20/2026B01279956-I1Request digital key ↗
▸Applications & Permits4
▸BISPLACE OF ASSEMBLY APPLICATION1
09/30/2014321017751Open ↗
▸BISPLACE OF ASSEMBLY1
08/28/2014321017751Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/25/2019321968956Open ↗
▸BISWORK PERMIT APPLICATION1
06/25/2019321968956Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B01279952-I1Open ↗
09/02/2026B01279952-I1Open ↗
09/02/2026B01279952-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/14/2019321968956Open ↗
06/25/2019321968956Open ↗
09/30/2014321017751Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01279952-I1Open ↗
09/02/2026B01279952-I1Open ↗
08/23/2026B01279956-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01279952-I1Open ↗
08/20/2026B01279956-I1Open ↗
08/13/2026B01279957-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/25/2019321968956Open ↗
06/25/2019321968956Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/25/2019321968956Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B01279952-I1Open ↗
08/20/2026B01279956-I1Open ↗
08/13/2026B01279957-I1Open ↗
▸Energy Compliance2
▸BISEMERGENCY LIGHTING (IF NOT IN COMPLIANCE WITH MEMEO 2-18-81)1
09/30/2014321017751Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/14/2019321968956Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026B01279956-I1Open ↗
08/13/2026B01279952-I1Open ↗
08/13/2026B01279957-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/10/2014321017751Open ↗
09/30/2014321017751Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/14/2019321968956Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/13/2019321968956Open ↗
06/25/2019321968956Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
07/02/2019321968956Open ↗
▸BISBOROUGH INTAKE FORM1
08/14/2019321968956Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/02/2019321968956Open ↗