← Back
BuildNYC
Co-op within a condominium
611 BANNER AVENUE
BROOKLYN · Brighton Beach · BIN 3196140
💬 Discuss this project
1969Year Built
7Stories
R9Building Class
R6Zoning
92,400 sfGross Floor Area
102Units
LL97 CoveredRent Stabilized3 Active Violations ▸FISP: SWARMPFDNY Report ↗
Co-op within a condominium · Owner of record: Banner Realty NY · 19,000 sf lot · 4.86 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMetroPCS6p · 4 filings · 20 docs
Floor 4Unit 4E, Unit 4R11p · 4 filings · 20 docs
Floor 3
Floor 2
Floor 1
Site & exteriorExterior building repairs and sidewalk shed10p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SDP Associates503/22/2026
611 Banner Owner303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GT Wireless Engineering210/22/2025
Navi Structural Engineering409/24/2024
Volume Space Consulting109/03/2024
KMB Design Group303/04/2024
Morali Architecture303/17/2023
Dewberry Engineers101/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Aca Associates403/21/2026
CCM Services Group603/21/2026
FDD603/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Site Structural ServicesGeneral Contractor303/21/2026
Upgrade 1 Construction CoGeneral Contractor303/21/2026
Ace Group NYScaffold303/21/2026
Fartuna ConstructionGeneral Contractor303/21/2026
V & A ImprovementsGeneral Contractor207/08/2026
Davrial EnterprisesGeneral Contractor203/21/2026
KT&G ConstructionGeneral Contractor104/09/2026
Jacobs TelecommunGeneral Contractor107/08/2026
J.A. Lee Electricspecialty_contractor107/08/2026
Five Stars Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
R Marsac Consulting329310/22/2025
Jay Kavi8500109/24/2024
KMB Design Group513303/04/2024
Anthony Morali Architect4810303/17/2023
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/16/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/01/2026
Co-op apartment 6C sold for $300,000
06/10/2026
Elevator Category 1 inspection report filed
05/07/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
298 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offKT&G Construction09/22/2025
DOB NOWGeneral ConstructionPermit IssuedFartuna Construction02/27/2025
DOB NOWAntennaSigned-offMic General Contracting12/16/2024
DOB NOWGeneral ConstructionSigned-offUpgrade 1 Construction Co09/27/2024
DOB NOWSidewalk ShedSigned-offAce Group NY09/04/2024
DOB NOWAntennaPermit IssuedSite Structural Services08/09/2022
DOB NOWGeneral ConstructionSigned-offV & A Improvements09/20/2021
DOB NOWGeneral ConstructionSigned-offV & A Improvements06/10/2021
DOB NOWAntennaSigned-offDavrial Enterprises03/20/2019
DOB NOWAntennaPermit IssuedArmentum Digital Infrastr12/13/2018
BISOTISSUEDJacobs Telecommun11/17/2016
BISOTISSUEDBest Construction & Restoration01/21/2016
BISEQISSUEDJ & G GNRL Contracting09/22/2015
BISOTISSUEDBechtel Infrastructure An07/29/2015
BISOTISSUEDBechtel Infrastructure An06/16/2015
BISOTISSUEDBest Construction & Restoration03/27/2015
BISOTISSUEDNexlink Global Services I02/14/2013
BISOTISSUEDVertical Solutions12/11/2012
BISOTISSUEDVertical Solutions10/01/2012
BISOTISSUEDSquan Construction Services05/03/2012
BISEQISSUEDJ & G GNRL Contracting05/02/2012
BISEQISSUEDJ & G GNRL Contracting11/09/2011
BISOTISSUEDTrinity Technologies10/19/2010
1 project · most recent 02/06/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/06/2023——Gas, Water/Sanitary
1 project · most recent 08/03/2021
General Wiring
FiledStatusContractorScope
08/03/2021CompleteEnterprise Electrical SystemsGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/07/2026Pass-Final General Construction Non-Directive 14PassView ↗
07/09/2024Pass-Final Antenna WithdrawalPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/23/2024FinalHumayun Ahmedprogress
09/23/2024Tenant Protection Plan ComplianceJay Kavispecial
04/12/2023Energy Code Compliance InspectionsANTHONY MORALIprogress
04/12/2023FinalANTHONY MORALIprogress
04/12/2023Fire-Resistant Penetrations and JointsANTHONY MORALIspecial
03/16/2023Energy Code Compliance InspectionsANTHONY MORALIprogress
03/16/2023Fire-Resistant Penetrations and JointsANTHONY MORALIspecial
03/16/2023FinalANTHONY MORALIprogress
02/06/2023Fire-Resistant Penetrations and JointsANTHONY MORALIspecial
06/07/2021FinalHumayun Ahmedprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MetroPCSTelecom siteRoof
Project B00008111 Alteration · LOC Issued · 03/09/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
206 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account