← Back
Two family converted from one family
611 QUINCY STREET
BROOKLYN · BIN 3044283
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,541 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: BARIAN MEDIA SERVICES · 1,883 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
Architecture
Basement1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRENT M. PORTER, ARCHITECT, AND ASS208/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OPTIMUM BUILDING RESTORATIONGeneral Contractor603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL CONSULTING SER1919208/18/2023
Building Lifecycle
All (50)Filed (2)Permit Issued (2)Signed Off (1)Violation (1)Objection (14)Special Inspection (30)
03/07/2024
Signed off — Alteration
NEW METAL DECK AT 1ST FLR TO REAR OPEN SPACE WITH ONLY A PORTION IN REQUIRED OPEN SPACE AS PER TPPN #4/03. CONVERSION OF 2 EXT'G WINDOW OPENINGS TO DOOR OPENINGS TO PROVIDE SAID ACCESS TO DECK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT.
B08019834-I1
10/02/2023
Permit issued — Foundation
B08019834-I1-GC-CX
09/07/2023
Permit issued — General Construction
B08019834-I1-GC-CX
09/01/2023
Special inspection requirement — Fenestration air leakage
Brent Porter
09/01/2023
Special inspection requirement — Air barrier - visual inspection
Brent Porter
09/01/2023
Special inspection requirement — Fenestration areas
Brent Porter
09/01/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Brent Porter
09/01/2023
Special inspection requirement — Concrete - Cast-In-Place
Andrew McConnell
09/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andrew McConnell
09/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andrew McConnell
09/01/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Andrew McConnell
09/01/2023
Special inspection requirement — Structural Steel - Details
Andrew McConnell
09/01/2023
Special inspection requirement — Subgrade Inspections
Andrew McConnell
09/01/2023
Special inspection requirement — Structural Steel - Welding
Andrew McConnell
09/01/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Andrew McConnell
09/01/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
09/01/2023
Special inspection requirement — Final
Andrew McConnell
09/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Brent Porter
09/01/2023
Special inspection requirement — Footing and Foundation
Andrew McConnell
09/01/2023
Special inspection requirement — Fire-Resistance Rated Construction
Andrew McConnell
08/25/2023
Objection resolved — Addressed
08/24/2023
Objection raised — Scope
08/18/2023
Filed — Alteration
NEW METAL DECK AT 1ST FLR TO REAR OPEN SPACE WITH ONLY A PORTION IN REQUIRED OPEN SPACE AS PER TPPN #4/03. CONVERSION OF 2 EXT'G WINDOW OPENINGS TO DOOR OPENINGS TO PROVIDE SAID ACCESS TO DECK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT.
B08019834-P1
04/18/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
04/18/2023
Special inspection requirement — Concrete - Cast-In-Place
Andrew McConnell
04/18/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Andrew McConnell
04/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andrew McConnell
04/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andrew McConnell
04/18/2023
Special inspection requirement — Structural Steel - Details
Andrew McConnell
04/18/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Andrew McConnell
04/18/2023
Special inspection requirement — Structural Steel - Welding
Andrew McConnell
04/18/2023
Special inspection requirement — Subgrade Inspections
Andrew McConnell
04/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Andrew McConnell
04/18/2023
Special inspection requirement — Final
Andrew McConnell
04/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
Andrew McConnell
04/18/2023
Special inspection requirement — Footing and Foundation
Andrew McConnell
11/04/2022
Objection raised — Scope
11/04/2022
Objection resolved — Addressed
11/04/2022
Objection raised — Inspections
11/04/2022
Objection resolved — Addressed
11/04/2022
Objection raised — Scope
11/04/2022
Objection resolved — Addressed
11/04/2022
Objection raised — Structural
11/04/2022
Objection resolved — Addressed
11/04/2022
Objection raised — Scope
11/04/2022
Objection resolved — Addressed
11/04/2022
Objection raised — Structural
11/04/2022
Objection resolved — Addressed
11/01/2022
Filed — Alteration
NEW METAL DECK AT 1ST FLR TO REAR OPEN SPACE WITH ONLY A PORTION IN REQUIRED OPEN SPACE AS PER TPPN #4/03. CONVERSION OF 2 EXT'G WINDOW OPENINGS TO DOOR OPENINGS TO PROVIDE SAID ACCESS TO DECK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT.
B08019834-I1
10/11/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offOPTIMUM BUILDING RESTORAT10/02/2023
DOB NOWGeneral ConstructionSigned-offOPTIMUM BUILDING RESTORAT09/07/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
09/01/2023Fenestration air leakageBrent Porterenergy_progress
09/01/2023Air barrier - visual inspectionBrent Porterenergy_progress
09/01/2023Fenestration areasBrent Porterenergy_progress
09/01/2023Fenestration and door U-factor and product ratingsBrent Porterenergy_progress
09/01/2023Concrete - Cast-In-PlaceAndrew McConnellspecial
09/01/2023Fire-Resistant Penetrations and JointsAndrew McConnellspecial
09/01/2023Structural Stability – Alterations of existing buildingsAndrew McConnellspecial
09/01/2023Excavations - Sheeting, Shoring, and BracingAndrew McConnellspecial
09/01/2023Structural Steel - DetailsAndrew McConnellspecial
09/01/2023Subgrade InspectionsAndrew McConnellspecial
09/01/2023Structural Steel - WeldingAndrew McConnellspecial
09/01/2023Structural Steel - High Strength BoltingAndrew McConnellspecial
09/01/2023Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
09/01/2023FinalAndrew McConnellprogress
09/01/2023Energy Code Compliance InspectionsBrent Porterprogress
09/01/2023Footing and FoundationAndrew McConnellprogress
09/01/2023Fire-Resistance Rated ConstructionAndrew McConnellprogress
04/18/2023Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
04/18/2023Concrete - Cast-In-PlaceAndrew McConnellspecial
04/18/2023Excavations - Sheeting, Shoring, and BracingAndrew McConnellspecial
04/18/2023Fire-Resistant Penetrations and JointsAndrew McConnellspecial
04/18/2023Structural Stability – Alterations of existing buildingsAndrew McConnellspecial
04/18/2023Structural Steel - DetailsAndrew McConnellspecial
04/18/2023Structural Steel - High Strength BoltingAndrew McConnellspecial
04/18/2023Structural Steel - WeldingAndrew McConnellspecial
Latest 25 of 34.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026B08019834-P1Request digital key ↗
08/15/2026B08019834-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
07/30/2009320039098Open ↗
06/25/2009320039098Open ↗
▸Seals & Professional Certifications17
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B08019834-I1Open ↗
09/23/2026B08019834-I1Open ↗
09/23/2026B08019834-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B08019834-I1Open ↗
09/23/2026B08019834-I1Open ↗
09/23/2026B08019834-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/25/2009320039098Open ↗
06/25/2009320039098Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026B08019834-I1Open ↗
08/13/2026B08019834-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B08019834-I1Open ↗
08/13/2026B08019834-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/25/2009320039098Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/15/2026B08019834-I1Open ↗
08/13/2026B08019834-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08019834-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
06/25/2009320039098Open ↗
06/25/2009320039098Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/25/2009320039098Open ↗
06/25/2009320039098Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/25/2009320039098Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08019834-I1Open ↗