Dormitory
611 WEST 112TH STREET
MANHATTAN · Morningside Heights · BIN 1057334
💬 Discuss this project
1904Year Built
6Stories
H8Building Class
R8Zoning
36,580 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized142 Active Violations ▸
Dormitory · 8,831 sf lot · 4.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing work187p · 7 filings · 20 docs
BulkheadPlumbing work1p · 1 filing · 20 docs
Floor 6Plumbing work170p · 7 filings · 20 docs
Floor 5Plumbing work173p · 7 filings · 20 docs
Floor 4Plumbing work170p · 7 filings · 20 docs
Floor 3Plumbing work171p · 7 filings · 20 docs
Floor 2Plumbing work173p · 7 filings · 20 docs
Floor 1Plumbing work189p · 9 filings · 20 docs
CellarPlumbing work174p · 7 filings · 20 docs
Sub-BasementRemoval of 3,000 gallon fuel oil tank1 filing · 6 docs
Site & exteriorPlumbing work74p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Columbia University - Manhattanvill6407/08/2026
611 West 112th Street Realty403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2022$25.7M—— → —$703/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates6403/21/2026
Howard I Shapiro Associates2803/21/2026
United Safety Consultants303/21/2026
Walter T Gorman PE203/21/2026
Green Studio203/21/2026
Archi Pro Group103/21/2026
Rigid Structural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold4307/08/2026
Consigli Construction CoGeneral Contractor3007/08/2026
Intersystem InstallationScaffold407/08/2026
Parkview P&HPlumbing307/08/2026
Stat Fire Sprinkler NYCFire Protection207/08/2026
Celtic Services NYCScaffold107/08/2026
Patriot ElectricElectrical103/21/2026
Brookside EnvironmetalGeneral Contractor107/08/2026
E-J Electric Installation CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlas ATC Engineering80113306/18/2025
Tohfaz Uddin P.E2001706/25/2024
Langan Engineering, Env, Surveyin1265312/08/2023
Building Lifecycle
All (300)Filed (53)Permit Issued (51)Signed Off (26)Violation (52)Inspection (9)Objection (79)Special Inspection (30)
05/14/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/29/2026
Violation issued (HPD, open)
A
03/18/2026
Signed off — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-I1
12/19/2025
Permit issued — General Construction
M00935307-I1-GC
12/01/2025
Signed off — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-S2
11/26/2025
Signed off — Alteration
M01233043-I1
11/17/2025
Violation issued (HPD, open)
I
10/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/16/2025
Permit issued — Plumbing
M01233043-I1-PL
07/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/02/2025
Objection resolved — Addressed
06/27/2025
Objection raised — Admin
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
06/18/2025
Filed — Alteration
M01233043-I1
06/18/2025
Filed — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-A3
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
06/04/2025
Violation issued (HPD, open)
A
06/03/2025
Signed off — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-S1
05/31/2025
Signed off — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-Z1
05/31/2025
Signed off — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-S9
05/29/2025
Signed off — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-S4
05/29/2025
Signed off — Alteration
Installation of temporary construction fence equipment as per plans filed herewith.
M00910737-I1
05/16/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
RONALD GRAPIN
05/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RONALD GRAPIN
05/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
05/16/2025
Special inspection requirement — Sprayed fire-resistant materials
RONALD GRAPIN
05/13/2025
Filed — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-A2
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
05/09/2025
Special inspection requirement — Sprayed fire-resistant materials
RONALD GRAPIN
05/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
05/09/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
RONALD GRAPIN
05/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RONALD GRAPIN
04/16/2025
Signed off — Alteration
Installation of temporary scaffold construction equipment as per plans filed herewith.
M00910746-I1
04/11/2025
Permit issued — Mechanical Systems
M00935307-S1-MS
04/10/2025
Filed — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-A1
04/10/2025
Signed off — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-S5
04/10/2025
Permit issued — Mechanical Systems
M00935307-S1-MS
04/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/26/2025
Signed off — Alteration
MPP# 135 - Remove roof in its entirety including framing, decking and parapets. Install new roof and parapets. Temporary shoring as needed. No change in use, egress or occupancy.
M00875121-I1
03/21/2025
Signed off — Alteration
MPP# 135 - Remove roof in its entirety including framing, decking and parapets. Install new roof and parapets. Temporary shoring as needed. No change in use, egress or occupancy.
M00875121-S2
03/20/2025
Objection resolved — Addressed
03/19/2025
Objection raised — Other
03/14/2025
Filed — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-P3
03/07/2025
Filed — Alteration CO
Plumbing work in conjunction with ALT CO as per plans.
M00935307-P9
03/06/2025
Violation issued (ECB, closed)
Construction
03/06/2025
Violation issued (ECB, closed)
Construction
03/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/06/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/04/2025
Signed off — Alteration
MPP# 135 - Remove roof in its entirety including framing, decking and parapets. Install new roof and parapets. Temporary shoring as needed. No change in use, egress or occupancy.
M00875121-S1
02/26/2025
Permit issued — Construction Fence
M00910737-I1-FN
02/26/2025
Permit issued — Supported Scaffold
M00910746-I1-SF
02/14/2025
Filed — Alteration
Installation of temporary construction fence equipment as per plans filed herewith.
M00910737-P3
02/11/2025
Special inspection requirement — Final
RONALD GRAPIN
02/11/2025
Special inspection requirement — Mechanical Systems
RONALD GRAPIN
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
02/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RONALD GRAPIN
01/30/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/29/2025
Signed off — Alteration
M00927880-I1
01/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00912799-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co12/19/2025
DOB NOWPlumbingSigned-offParkview P&H10/16/2025
DOB NOWMechanical SystemsSigned-offConsigli Construction Co04/11/2025
DOB NOWMechanical SystemsSigned-offConsigli Construction Co04/10/2025
DOB NOWConstruction FenceSigned-offSpring Scaffolding02/26/2025
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/26/2025
DOB NOWPlumbingSigned-offParkview P&H01/24/2025
DOB NOWFoundationSigned-offConsigli Construction Co01/09/2025
DOB NOWStructuralSigned-offConsigli Construction Co01/09/2025
DOB NOWFoundationSigned-offConsigli Construction Co01/09/2025
DOB NOWStructuralSigned-offConsigli Construction Co12/30/2024
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co12/26/2024
DOB NOWBoiler EquipmentSigned-offChampion Combustion12/16/2024
DOB NOWBoiler EquipmentSigned-offChampion Combustion12/11/2024
DOB NOWBoiler EquipmentSigned-offChampion Combustion10/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding08/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding08/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding08/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding08/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding08/21/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/07/2024
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding08/07/2024
DOB NOWConstruction FenceSigned-offSpring Scaffolding08/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding04/30/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co03/14/2024
DOB NOWStandpipeSigned-offStat Fire Sprinkler NYC03/04/2024
DOB NOWSprinklersSigned-offStat Fire Sprinkler NYC03/04/2024
DOB NOWMechanical SystemsSigned-offConsigli Construction Co02/28/2024
DOB NOWPlumbingSigned-offParkview P&H02/27/2024
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co02/23/2024
DOB NOWStructuralSigned-offConsigli Construction Co02/09/2024
DOB NOWStructuralSigned-offConsigli Construction Co01/10/2024
DOB NOWStructuralSigned-offConsigli Construction Co01/04/2024
DOB NOWStructuralSigned-offConsigli Construction Co12/28/2023
DOB NOWFoundationSigned-offConsigli Construction Co12/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offCeltic Services NYC11/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding09/26/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding09/15/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding09/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding09/11/2023
+ 12 more permits on file
1 project · most recent 06/18/2025
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/18/2025Permit IssuedConsigli Construction CoAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric TURYE0723AN41AN 6 tons · Heat Pump Outdoor ×14
NTXSST24B112AA 2 tons · Condensing Unit ×2
TURYE1443AN41AN 12 tons · Vrf Outdoor ×2
Swegon GOLD RX07 7 tons · Fan Coil Indoor ×1
GOLD RX11 11 tons · Fan Coil Indoor ×1
GOLD RX20 20 tons · Fan Coil Indoor ×1
Ventilation
N/A N/A 1 BTU ×1
Ducts & Piping
N/A N/A 1 BTU · Ductwork ×1
1 project · most recent 06/18/2025
Sprinkler System
FiledStatusContractorScope
06/18/2025Signed-offStat Fire Sprinkler NYCSprinkler System
1 project · most recent 06/18/2025
Storm Water/Sanitary
FiledStatusContractorScope
06/18/2025Signed-offParkview P&HStorm, Water/Sanitary
12 projects · most recent 11/10/2025
General Wiring
FiledStatusContractorScope
11/10/2025CompletePatriot ElectricGeneral Wiring
11/15/2024CompletePatriot ElectricGeneral Wiring
11/04/2024CompletePatriot Electric1 meters, 1 new_meters
10/02/2024CompleteColumbia Univ-Manh CampGeneral Wiring
02/28/2024CompleteTuxedo Electrical Contracting—
01/12/2024CompletePatriot Electric—
08/10/2023CompleteTechno-Volt Electric—
06/14/2023CompleteE-J Electric Installation Co1 meters, 1 new_meters
10/06/2022CompleteTom Fitzpatrick Electrical—
02/08/2022CompleteTop Shelf Electric—
12/11/2020CompleteSteven Farkas—
03/26/2020CompleteE-J Electric Installation CoGeneral Wiring
1 project · most recent 06/18/2025
FiledStatusContractorScope
06/18/2025Permit IssuedConsigli Construction Co4 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/14/2026Pass-Final General Construction Non-Directive 14PassView ↗
10/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/06/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/30/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/04/2024Pass-Final PL - UndergroundPassView ↗
06/21/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
06/20/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
06/13/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
05/16/2025Structural Stability – Alterations of existing buildingsRONALD GRAPINspecial
05/16/2025Fire-Resistance Rated ConstructionRONALD GRAPINprogress
05/16/2025Mastic and Intumescent Fire-resistant CoatingsRONALD GRAPINspecial
05/16/2025Sprayed fire-resistant materialsRONALD GRAPINspecial
05/16/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
05/09/2025Mastic and Intumescent Fire-resistant CoatingsRONALD GRAPINspecial
05/09/2025Structural Stability – Alterations of existing buildingsRONALD GRAPINspecial
05/09/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
05/09/2025Fire-Resistance Rated ConstructionRONALD GRAPINprogress
05/09/2025Sprayed fire-resistant materialsRONALD GRAPINspecial
02/11/2025Mechanical SystemsRONALD GRAPINspecial
02/11/2025FinalRONALD GRAPINprogress
02/11/2025Structural Stability – Alterations of existing buildingsRONALD GRAPINspecial
02/11/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
11/21/2024FinalSAGAR BEHARRYprogress
11/21/2024Structural Stability – Alterations of existing buildingsRONALD GRAPINspecial
11/21/2024Construction Operations Influencing Adjacent StructuresRONALD GRAPINspecial
11/21/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsRONALD GRAPINspecial
11/21/2024Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
11/21/2024Post-installed AnchorsRONALD GRAPINspecial
11/21/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsRONALD GRAPINspecial
11/21/2024Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
11/21/2024Post-installed AnchorsRONALD GRAPINspecial
Latest 25 of 106.
▾Documents — 359 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch52
09/02/2026M00676993-I1Request digital key ↗
09/01/2026M00809481-I1Request digital key ↗
08/30/2026M00875121-S3Request digital key ↗
Showing 3 of 52 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00438515-I1Request digital key ↗
▸Applications & Permits48
▸DOB NOWLPC Approval/Permit32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
10/04/2024103674258Open ↗
10/04/2024123864130Open ↗
09/14/2020123864130Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION2
01/13/2020121936593Open ↗
03/28/2014121936593Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications122
▸DOB NOWSpecial Inspector Seal & Signature56
10/03/2026M00910746-I1Open ↗
09/23/2026M00935307-S9Open ↗
09/23/2026M00935307-Z1Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
09/04/2026M00438515-I1Open ↗
09/02/2026M00676993-I1Open ↗
08/30/2026M00875121-S2Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026M00935307-P4Open ↗
08/30/2026M00438515-I1Open ↗
08/30/2026M00875121-P7Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/09/2019123864130Open ↗
03/05/2014121936593Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/09/2019123864130Open ↗
03/05/2014121936593Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/09/2019123864130Open ↗
03/05/2014121936593Open ↗
▸Safety & Tenant Protection58
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist53
09/04/2026M00438515-I1Open ↗
09/02/2026M00676993-I1Open ↗
08/13/2026M00910746-P1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
11/25/2020123864130Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form12
08/30/2026M00875121-S2Open ↗
08/30/2026M00875121-S1Open ↗
08/30/2026M00875121-S3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/30/2026M00875121-S2Open ↗
08/30/2026M00875121-I1Open ↗
08/30/2026M00875121-P1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/05/2014121936593Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/09/2019123864130Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/19/2020121936593Open ↗
▸Approvals, Objections & Sign-offs32
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISLANDMARKS APPROVAL1
11/25/2020123864130Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/24/2020121936593Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
12/09/2019123864130Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/19/2020121936593Open ↗
12/09/2019123864130Open ↗
03/05/2014121936593Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
12/09/2019123864130Open ↗
03/05/2014121936593Open ↗
▸BISBOROUGH INTAKE FORM2
04/27/2020121936593Open ↗
02/24/2020121936593Open ↗
▸Other Documents12
▸DOB NOWProof of Historic Building5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026M00935307-S6Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM1
12/09/2019123864130Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
04/20/2020121936593Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/05/2014121936593Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type