DOB09/01/2026IMMEDIATELY REPAIR APPROXIMATELY 30 LINEAR FT OF CHAIN LINK FENCE ALONG EXP #1 (5TH AVE) TO SECURE VACANT LOT
ECB07/02/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, FOR VIOLATION CONTAINED IN SUMMONS #39136730H ISSUED ON 01/28/2025. AS OF DATE, NO C OF C ON$3K due
ECB02/18/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. ECB VIOL#39136730H ISSUED ON 1/28/25 NOTED: CHAIN LINK FENCE COLLAPSED AND COMPLETELY BROKEN$6K due
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB08/18/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/04/2021FTM:DETER STL&TIMBER ADVERTISING SIGN STRCTR@EXP 2/3 CRNR OF EXP2 WITH SUNKEN PBLC EXPWY BELW.SIGN STL RUSTED.TIMBER SEVRE DETER PORTNS MISS@ TOP&PIECE DISLDG FRM WD&WEDG STL LATICE.BRK MASN@EXP2 WALL DETER.NYSPE STRL ENGR IMMD EVAL ENTR BLDG&DSGN RPRS.RMV SIGN STRCT&CMPLT WALL RPRS UNDR PRMT.FIL BY 4/30/21.OBTN PRMT&STRT BY 5/17/21.SIGN OFF BY 7/19/21
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB11/12/2010DOB VIOLATION ISSUED FOR MATTERS NOT PROVIDED
DOB09/22/2000V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB04/02/199036
DOB11/18/1988V-DOB VIOLATION - ACTIVE
DOB11/18/1988V-DOB VIOLATION - ACTIVE
ECB01/28/2025AT TIME INSPECTION OBSERVED CHAIN LINK FENCE WITH APPROX. 4'HX2'W OPENING THAT POTENTIALLY ALLOWS UNAUTHORIZED ACCESS TO VACANT LOT THAT IS IN CLOSE PROXIMITY AND ABOVE PROSPECT PARKWAY., REPAIR AND/OR REPLACENothing owed — awaiting certificate of correction
ECB05/26/2021WORK DOESNT CONFORM TO APPROVED CONST DOCS.ATO MY INSP OBSERVED PARTY WALL@EXP4 THATS DEMOD&COVERED BY BLUETARP FOR WEATHERPROOFING.ACCORDING TO APPROVED DOCS E ITS SUPPOSED TO BE METAL FRAME WALL (PG-S-002).WONothing owed — awaiting certificate of correction