← Back
Stand-alone food establishment
611 BUSHWICK AVENUE
BROOKLYN · Bushwick (West) · BIN 3072022
💬 Discuss this project
1931Year Built
1Stories
K5Building Class
M1-1Zoning
4,263 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Stand-alone food establishment · Owner of record: 613 BUSHWICK AVENUE REALTY LLC · 6,751 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof9p · 6 filings · 20 docs
Bulkhead3p · 3 filings · 20 docs
Floor 17p · 7 filings · 20 docs
Cellar8p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROPERTY DEVELOPMENT GROUP907/08/2026
613 BUSHWICK AVE103/22/2026
613 BUSHWICK AVENUE REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES2803/21/2026
GREEN STUDIO203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
AG RESTORATION403/21/2026
HIGH POINT ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROPERTY DEVELOPMENT GROUPGeneral Contractor1907/08/2026
ADVANCED PLBG LLCPlumbing707/08/2026
NEWMAN DESIGN ARCHITECTSGeneral Contractor403/22/2026
OULD SOD CONSTRUCTION CORPGeneral Contractor403/21/2026
ADVANCED PLUMBING LLCFire Protection207/08/2026
ISLAND PUMP AND TANK, LLCGeneral Contractor203/21/2026
CORPORATE ELEC. GROUP INCElectrical103/22/2026
MANHATTAN D ENTERPRISESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CERTIFIED TESTING LABORAT396909/18/2024
ANTHONY CUCICH ARCHITECT6081203/10/2024
SOIL MECHANICS DRILLING C23251510/27/2023
Building Lifecycle
All (193)Filed (33)Permit Issued (23)Signed Off (15)Violation (14)Inspection (16)Objection (62)Special Inspection (30)
09/30/2024
Signed off — Alteration
Separate application filed to install additional plumbing fixtures. Original application B00344971-I1 has already been signed off.
B01066739-I1
09/20/2024
Signed off — Alteration
B01011531-I1
09/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/18/2024
Filed — Alteration
Separate application filed to install additional plumbing fixtures. Original application B00344971-I1 has already been signed off.
B01066739-P1
09/18/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KIRT DOBBINS
08/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/02/2024
Permit issued — Plumbing
B01066739-I1-PL
06/21/2024
Filed — Alteration
Separate application filed to install additional plumbing fixtures. Original application B00344971-I1 has already been signed off.
B01066739-I1
06/14/2024
Filed — No Work
B01044579-P2
06/12/2024
Special inspection requirement — Public Assembly Emergency Lighting
KIRT DOBBINS
06/04/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Other
05/15/2024
Filed — No Work
B01044579-I1
04/17/2024
Permit issued — General Construction
B01011531-I1-GC
03/10/2024
Filed — Alteration
B01011531-I1
12/28/2023
Signed off — Alteration
B00935745-I1
12/22/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/03/2023
Signed off — Alteration
Mechanical work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements
B00344958-I1
11/02/2023
Special inspection requirement — Mechanical Systems
KIRT DOBBINS
11/02/2023
Special inspection requirement — HVAC and service water heating equipment
KIRT DOBBINS
11/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LAWNICZAK
11/02/2023
Special inspection requirement — Final
STEPHEN LAWNICZAK
11/02/2023
Special inspection requirement — HVAC insulation and sealing
KIRT DOBBINS
11/02/2023
Special inspection requirement — HVAC and service water heating system controls
KIRT DOBBINS
11/02/2023
Special inspection requirement — Heating Systems
KIRT DOBBINS
11/02/2023
Special inspection requirement — Maintenance information
KIRT DOBBINS
10/27/2023
Filed — Alteration
Mechanical work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements
B00344958-P3
10/26/2023
Signed off — Alteration
Plumbing work as shown on plans. In conjunction with Alt-1 321590710 which is filed to meet New Building requirements
B00344971-I1
10/24/2023
Signed off — Alteration
Sprinkler system filed in conjunction with Alteration type 1 application 321590710
B00344980-I1
10/19/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/18/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2023
Permit issued — General Construction
B00935745-I1-GC
10/12/2023
Special inspection requirement — HVAC insulation and sealing
KIRT DOBBINS
10/12/2023
Special inspection requirement — Final
STEPHEN LAWNICZAK
10/12/2023
Special inspection requirement — Sprinkler Systems
KIRT DOBBINS
10/12/2023
Special inspection requirement — HVAC and service water heating system controls
KIRT DOBBINS
10/12/2023
Special inspection requirement — Maintenance information
KIRT DOBBINS
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LAWNICZAK
10/12/2023
Special inspection requirement — Heating Systems
KIRT DOBBINS
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KIRT DOBBINS
10/12/2023
Special inspection requirement — HVAC and service water heating equipment
KIRT DOBBINS
10/12/2023
Special inspection requirement — Mechanical Systems
KIRT DOBBINS
10/06/2023
Filed — Alteration
Sprinkler system filed in conjunction with Alteration type 1 application 321590710
B00344980-P3
09/23/2023
Filed — Alteration
B00935745-I1
09/21/2023
Permit issued — Mechanical Systems
B00344958-I1-MS
09/18/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2023
Signed off — Alteration
B00092052-I1
09/13/2023
Permit issued — Plumbing
B00344971-I1-PL
09/08/2023
Signed off — Alteration
B00375396-I1
09/08/2023
Signed off — Alteration
B00375392-I1
09/07/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/05/2023
Objection resolved — Addressed
09/05/2023
Objection resolved — Addressed
09/01/2023
Signed off — Alteration
Filing to correct structural application B00345051 which has been signed off. Structural work limited to above the bulkhead structure.
B00846337-I1
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/29/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/25/2023
Objection raised — Other
08/25/2023
Objection raised — Structural
Latest 60 of 193 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offADVANCED PLBG LLC08/02/2024
DOB NOWGeneral ConstructionSigned-offOULD SOD CONSTRUCTION COR04/17/2024
DOB NOWGeneral ConstructionSigned-offOULD SOD CONSTRUCTION COR10/16/2023
DOB NOWMechanical SystemsSigned-offPROPERTY DEVELOPMENT GROUP09/21/2023
DOB NOWPlumbingSigned-offADVANCED PLBG LLC09/13/2023
DOB NOWCurb CutSigned-offPROPERTY DEVELOPMENT GROUP07/13/2023
DOB NOWCurb CutSigned-offPROPERTY DEVELOPMENT GROUP07/13/2023
DOB NOWConstruction FenceSigned-offPROPERTY DEVELOPMENT GROUP04/20/2023
DOB NOWStructuralSigned-offPROPERTY DEVELOPMENT GROUP03/30/2023
DOB NOWSprinklersSigned-offADVANCED PLUMBING LLC12/23/2022
DOB NOWPlumbingSigned-offADVANCED PLBG LLC09/12/2022
DOB NOWConstruction FenceSigned-offPROPERTY DEVELOPMENT GROUP04/22/2022
DOB NOWSprinklersSigned-offADVANCED PLUMBING LLC12/13/2021
DOB NOWPlumbingSigned-offADVANCED PLBG LLC09/13/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES09/03/2021
DOB NOWMechanical SystemsSigned-offPROPERTY DEVELOPMENT GROUP08/31/2021
DOB NOWSupport of ExcavationSigned-offPROPERTY DEVELOPMENT GROUP08/31/2021
DOB NOWStructuralSigned-offPROPERTY DEVELOPMENT GROUP08/31/2021
DOB NOWFoundationSigned-offPROPERTY DEVELOPMENT GROUP08/31/2021
DOB NOWConstruction FenceSigned-offPROPERTY DEVELOPMENT GROUP03/17/2021
DOB NOWConstruction FenceSigned-offISLAND PUMP AND TANK, LLC11/09/2018
DOB NOWConstruction FenceSigned-offPROPERTY DEVELOPMENT GROUP10/19/2018
DOB NOWConstruction FenceSigned-offPROPERTY DEVELOPMENT GROUP04/10/2018
BIS—ISSUEDPROPERTY DEVELOPMENT GROUP06/12/2023
BIS—ISSUEDPROPERTY DEVELOPMENT GROUP06/15/2022
BIS—ISSUEDPROPERTY DEVELOPMENT GROUP06/08/2022
BIS—ISSUEDPROPERTY DEVELOPMENT GROUP09/07/2021
BISOTISSUEDISLAND PUMP AND TANK, LLC11/05/2018
BISEQISSUEDPROPERTY DEVELOPMENT GROUP10/07/2016
BISFPISSUEDEMDI LTD05/18/2005
BIS—ISSUEDNATIONAL MAINTENANCE INC10/08/2004
BIS—ISSUEDNTNL MAINT INC10/08/2004
BIS—ISSUEDNATIONAL MAINTENACE INC.08/25/2004
5 projects · most recent 07/20/2023
General Wiring
FiledStatusContractorScope
07/20/2023CompleteREDLINE ELECTRIC INCGeneral Wiring
12/25/2022CompleteHANISON ELECTRIC INC1 meters, 1 new_meters
03/11/2022CompleteCORPORATE ELEC. GROUP INC—
09/27/2021CompleteHANISON ELECTRIC INCGeneral Wiring
08/13/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
09/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2024Pass-Final General Construction Non-Directive 14PassView ↗
08/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/19/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/18/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/18/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/07/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/29/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
08/14/2023Fail-Final SP - Up to 3 Requested FloorsFailView ↗
08/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/07/2023Pass-Final PL - UndergroundPassView ↗
10/21/2022Pass-Final PL - UndergroundPassView ↗
09/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2022Pass-Final PL - UndergroundPassView ↗
12/17/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
09/06/2024Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
06/12/2024Public Assembly Emergency LightingKIRT DOBBINSprogress
11/02/2023HVAC and service water heating system controls KIRT DOBBINSenergy_progress
11/02/2023FinalSTEPHEN LAWNICZAKprogress
11/02/2023HVAC insulation and sealing KIRT DOBBINSenergy_progress
11/02/2023HVAC and service water heating equipment KIRT DOBBINSenergy_progress
11/02/2023Mechanical SystemsKIRT DOBBINSspecial
11/02/2023Heating SystemsKIRT DOBBINSspecial
11/02/2023Fire-Resistant Penetrations and JointsSTEPHEN LAWNICZAKspecial
11/02/2023Maintenance informationKIRT DOBBINSenergy_progress
10/12/2023Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
10/12/2023Sprinkler SystemsKIRT DOBBINSspecial
10/12/2023HVAC and service water heating equipment KIRT DOBBINSenergy_progress
10/12/2023Maintenance informationKIRT DOBBINSenergy_progress
10/12/2023HVAC insulation and sealing KIRT DOBBINSenergy_progress
10/12/2023HVAC and service water heating system controls KIRT DOBBINSenergy_progress
10/12/2023FinalSTEPHEN LAWNICZAKprogress
10/12/2023Mechanical SystemsKIRT DOBBINSspecial
10/12/2023Heating SystemsKIRT DOBBINSspecial
10/12/2023Fire-Resistant Penetrations and JointsSTEPHEN LAWNICZAKspecial
05/11/2023Fire-Resistant Penetrations and JointsSTEPHEN LAWNICZAKspecial
05/11/2023HVAC and service water heating system controls KIRT DOBBINSenergy_progress
05/11/2023HVAC and service water heating equipment KIRT DOBBINSenergy_progress
05/11/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSTEPHEN LAWNICZAKspecial
05/11/2023Maintenance informationKIRT DOBBINSenergy_progress
Latest 25 of 83.
▾Documents — 281 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch11
09/03/2026B00003682-I1Request digital key ↗
09/02/2026B00092052-I1Request digital key ↗
09/01/2026B00547261-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/02/2026B00344971-P2Request digital key ↗
09/02/2026B00344971-I1Request digital key ↗
09/02/2026B00344971-P6Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00344958-P3Request digital key ↗
09/02/2026B00344958-I1Request digital key ↗
09/02/2026B00344958-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/02/2026B00344980-P3Request digital key ↗
09/02/2026B00344980-I1Request digital key ↗
08/15/2026B00344980-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/02/2026B00345051-I1Request digital key ↗
08/15/2026B00345051-P1Request digital key ↗
08/15/2026B00345051-P7Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/24/2026B01044579-I1Request digital key ↗
08/24/2026B01044579-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
09/02/2026B00375392-I1Request digital key ↗
09/02/2026B00375396-I1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION29
10/09/2024321590710Open ↗
05/10/2024321590710Open ↗
04/15/2024321590710Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION5
06/14/2023321590710Open ↗
06/15/2022321590710Open ↗
09/07/2021321590710Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/20/2021321590710Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
07/02/2021321590710Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/10/2020340753429Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
05/24/2023321590710Open ↗
07/02/2021321590710Open ↗
▸BISVERIFY TAX LOT1
11/02/2023321590710Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/02/2021321590710Open ↗
▸Seals & Professional Certifications102
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/03/2026B00003682-I1Open ↗
09/02/2026B00092052-I1Open ↗
09/01/2026B00547261-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/26/2026B00846337-I1Open ↗
09/15/2026B00344958-P3Open ↗
09/15/2026B00344958-P3Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/26/2026B00846337-I1Open ↗
09/26/2026B00846337-I1Open ↗
09/26/2026B00846337-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/02/2018321069605Open ↗
10/05/2017321461967Open ↗
10/07/2016321461967Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/02/2018321069605Open ↗
10/07/2016321461967Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/02/2018321069605Open ↗
10/07/2016321461967Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/10/2020340753429Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/10/2020340753429Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/06/2023321590710Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/06/2023321590710Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
07/02/2021321590710Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST5
08/17/2023321590710Open ↗
06/05/2023340753429Open ↗
05/16/2023321590710Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
07/19/2021340753429Open ↗
07/02/2021321590710Open ↗
▸BISSTREET TREE SIGNOFF1
10/18/2024321590710Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/05/2023340753429Open ↗
▸BISTenant Protection Plan and Notes1
11/02/2018321069605Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00529488-I1Open ↗
09/01/2026B00529488-P1Open ↗
08/13/2026B00344980-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/24/2026B01066739-I1Open ↗
08/13/2026B00846337-I1Open ↗
08/13/2026B00344958-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/02/2021321590710Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/28/2023321590710Open ↗
08/20/2021321590710Open ↗
05/14/2021321590710Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/05/2017321461967Open ↗
10/07/2016321461967Open ↗
▸BISINTERIOR LIGHTING POWER1
09/06/2023321590710Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/05/2017321461967Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/06/2023321590710Open ↗
▸BISFENESTRATION AREAS1
09/06/2023321590710Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/06/2023321590710Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/21/2023321590710Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/06/2023321590710Open ↗
▸BISELECTRIC MOTORS1
09/06/2023321590710Open ↗
▸BISLIGHTING CONTROLS1
09/06/2023321590710Open ↗
▸BISTR8 INSPECTOR TO CONFIRM ECC COMPLIANT WALL AND WINDOW U-FACTORS.1
09/26/2023321590710Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
09/06/2023321590710Open ↗
▸BISEXTERIOR LIGHTING POWER1
09/06/2023321590710Open ↗
▸BISFENESTRATION AIR LEAKAGE1
09/06/2023321590710Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/20/2021321590710Open ↗
07/02/2021321590710Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00529488-P1Open ↗
08/13/2026B00529488-I1Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/20/2021321590710Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/20/2023321590710Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/20/2023321590710Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/30/2024321590710Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00529488-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00529488-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE4
05/10/2024321590710Open ↗
04/15/2024321590710Open ↗
08/14/2023321590710Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
10/27/2023340753429Open ↗
10/27/2023340753429Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/11/2023321069605Open ↗
10/05/2017321461967Open ↗
▸BISFINAL1
08/01/2023321069605Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT4
05/09/2023321590710Open ↗
05/03/2023321590710Open ↗
04/17/2023321590710Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
06/14/2023321590710Open ↗
06/21/2022321590710Open ↗
08/20/2021321590710Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
09/27/2024321590710Open ↗
09/07/2023321069605Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
07/02/2021321590710Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION13
09/25/2024321590710Open ↗
09/25/2024321590710Open ↗
08/29/2023321590710Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM2
06/15/2022321590710Open ↗
10/05/2017321461967Open ↗
▸BISEFILING COVER SHEET1
11/02/2018321069605Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/10/2020340753429Open ↗
▸Other Documents9
▸BISSHUTOFF DAMPERS1
09/06/2023321590710Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
07/02/2021321590710Open ↗
▸BISMAINTENANCE INFORMATION1
09/06/2023321590710Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
09/06/2023321590710Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
09/06/2023321590710Open ↗
▸BISPLOT DIAGRAM1
07/02/2021321590710Open ↗
▸DOB NOWApproved Plans with no change in layout1
09/01/2026B00529488-I1Open ↗
▸DOB NOWPlot Diagram1
09/01/2026B00547261-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
09/01/2026B00547261-I1Open ↗