← Back
City residence, one family
613 HUDSON STREET
MANHATTAN · BIN 1011423
💬 Discuss this project
1842Year Built
3Stories
A4Building Class
C1-6Zoning
2,080 sfGross Floor Area
1Units
City residence, one family · 600 sf lot · 3.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 1 filing · 20 docs
Mezzanine2p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UGB CONSTRUCTION507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2019$5.1M—Private party → Private party$2,452/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN ELLIS ARCHITECT910/02/2023
JOHN D NAKROSIS JR BLDG DESIGN205/10/2023
LIGHT HOUSE106/23/2022
ASHRAF CORP101/11/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC CONSTRUCTION OFGeneral Contractor903/21/2026
UGB CONSTRUCTION INCGeneral Contractor407/08/2026
ZONE PLUMBING & HEATING CPlumbing207/08/2026
BENJAMIN DREBINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARCH CHADWICK, ARCHITECT2253810/02/2023
KCE CONSULTING ENGINEERIN3712205/10/2023
Building Lifecycle
All (88)Filed (13)Permit Issued (7)Signed Off (5)Inspection (5)Objection (30)Special Inspection (28)
10/02/2024
Signed off — Alteration
Kindly filing as built plans for minor changes.
M00622457-I1
09/26/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/19/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/09/2024
Objection resolved — Addressed
04/09/2024
Objection resolved — Addressed
04/09/2024
Objection resolved — Addressed
04/09/2024
Objection resolved — Addressed
03/25/2024
Objection resolved — Addressed
03/25/2024
Objection resolved — Addressed
02/07/2024
Objection resolved — Addressed
02/07/2024
Objection resolved — Addressed
01/23/2024
Objection resolved — Addressed
01/23/2024
Objection resolved — Addressed
01/23/2024
Objection resolved — Addressed
01/23/2024
Objection resolved — Addressed
01/23/2024
Objection resolved — Addressed
01/23/2024
Objection resolved — Addressed
01/22/2024
Objection resolved — Addressed
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
12/14/2023
Objection raised — Other
10/13/2023
Objection raised — Other
10/12/2023
Objection raised — Other
10/02/2023
Filed — Alteration
Kindly filing as built plans for minor changes.
M00622457-P4
09/12/2023
Signed off — Alteration
Amendment filed to revise drawings and schedule. Please see revised amended plans. Thank you.
M00650516-I1
08/28/2023
Signed off — Alteration
Masonry repairs at parapet, south and west walls; installation of new cornice; new masonry opening at basement level with new steel lintel. No change to egress, occupancy or use due to this filing.
M00611592-I1
08/26/2023
Signed off — Alteration
M00659980-I1
08/26/2023
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED AT FRONT AS PER PLAN.
M00762007-I1
08/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/19/2023
Special inspection requirement — Mechanical Systems
MARCH CHADWICK
06/19/2023
Special inspection requirement — Final
JOHN ELLIS
06/19/2023
Special inspection requirement — Ventilation and air distribution system
JOHN ELLIS
05/11/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
MARCH CHADWICK
05/11/2023
Special inspection requirement — Concrete - Cast-In-Place
MARCH CHADWICK
05/11/2023
Special inspection requirement — Aluminum Construction
MARCH CHADWICK
05/11/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MARCH CHADWICK
05/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARCH CHADWICK
05/11/2023
Special inspection requirement — Post-installed Anchors
MARCH CHADWICK
05/11/2023
Special inspection requirement — Subgrade Inspections
Kemba Walcott
05/11/2023
Special inspection requirement — Structural Steel - Welding
MARCH CHADWICK
05/11/2023
Special inspection requirement — Final
John Nakrosis
05/11/2023
Special inspection requirement — Masonry
MARCH CHADWICK
05/11/2023
Special inspection requirement — Structural Steel - Details
MARCH CHADWICK
05/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
05/10/2023
Filed — Alteration
Masonry repairs at parapet, south and west walls; installation of new cornice; new masonry opening at basement level with new steel lintel. No change to egress, occupancy or use due to this filing.
M00611592-P1
05/04/2023
Special inspection requirement — Concrete - Cast-In-Place
MARCH CHADWICK
03/08/2023
Permit issued — Plumbing
M00650516-I1-PL
02/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/08/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/01/2023
Filed — Alteration
Amendment filed to revise drawings and schedule. Please see revised amended plans. Thank you.
M00650516-P3
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C03/08/2023
DOB NOWMechanical SystemsSigned-offDYNAMIC CONSTRUCTION OF11/10/2022
DOB NOWSidewalk ShedSigned-offUGB CONSTRUCTION INC06/30/2022
DOB NOWStructuralSigned-offDYNAMIC CONSTRUCTION OF06/27/2022
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C02/21/2022
DOB NOWStructuralSigned-offDYNAMIC CONSTRUCTION OF01/31/2022
DOB NOWSupported ScaffoldSigned-offUGB CONSTRUCTION INC01/14/2022
BISOTISSUEDRIVERSIDE BUILDERS INC10/26/2007
1 project · most recent 07/17/2023
General Wiring
FiledStatusContractorScope
07/17/2023CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/26/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/19/2024Fail-Final General Construction Non-Directive 14FailView ↗
08/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/19/2023Mechanical SystemsMARCH CHADWICKspecial
06/19/2023FinalJOHN ELLISprogress
06/19/2023Ventilation and air distribution systemJOHN ELLISenergy_progress
05/11/2023Mastic and Intumescent Fire-resistant CoatingsMARCH CHADWICKspecial
05/11/2023Concrete - Cast-In-PlaceMARCH CHADWICKspecial
05/11/2023Aluminum ConstructionMARCH CHADWICKspecial
05/11/2023Structural Steel - High Strength BoltingMARCH CHADWICKspecial
05/11/2023Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
05/11/2023Post-installed AnchorsMARCH CHADWICKspecial
05/11/2023Subgrade InspectionsKemba Walcottspecial
05/11/2023Structural Steel - WeldingMARCH CHADWICKspecial
05/11/2023FinalJohn Nakrosisprogress
05/11/2023MasonryMARCH CHADWICKspecial
05/11/2023Structural Steel - DetailsMARCH CHADWICKspecial
05/11/2023Structural Stability – Alterations of existing buildingsKemba Walcottspecial
05/04/2023Concrete - Cast-In-PlaceMARCH CHADWICKspecial
01/22/2023Mechanical SystemsMARCH CHADWICKspecial
01/22/2023FinalJOHN ELLISprogress
01/22/2023Ventilation and air distribution systemJOHN ELLISenergy_progress
07/27/2022FinalJohn Nakrosisprogress
05/30/2022Aluminum ConstructionMARCH CHADWICKspecial
05/30/2022Structural Steel - High Strength BoltingMARCH CHADWICKspecial
05/30/2022Structural Steel - WeldingMARCH CHADWICKspecial
05/30/2022Structural Stability – Alterations of existing buildingsKemba Walcottspecial
05/30/2022Subgrade Inspections—special
Latest 25 of 28.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026M00650516-P2Request digital key ↗
09/03/2026M00650516-P3Request digital key ↗
09/03/2026M00650516-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/13/2026M00650516-P1Open ↗
08/13/2026M00622457-P1Open ↗
08/13/2026M00622457-P4Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature19
09/28/2026M00611592-P1Open ↗
09/28/2026M00611592-P1Open ↗
09/28/2026M00611592-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/03/2026M00650516-P2Open ↗
09/03/2026M00650516-P3Open ↗
09/03/2026M00650516-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/28/2026M00611592-P1Open ↗
09/01/2026M00622457-P4Open ↗
09/01/2026M00622457-P4Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00650516-P1Open ↗
09/03/2026M00650516-P2Open ↗
09/03/2026M00650516-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00622457-I1Open ↗
08/13/2026M00611592-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00622457-I1Open ↗