← Back
Five to six families
614 80 STREET
BROOKLYN · Bay Ridge · BIN 3151425
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R5BZoning
5,475 sfGross Floor Area
6Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 80TH HOLDINGS LLC · 2,400 sf lot · 2.28 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JOHN PSARAS REALTY MGMT507/08/2026
80TH HOLDINGS LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.204/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELL FUEL OIL, LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851204/22/2023
Building Lifecycle
All (74)Filed (2)Permit Issued (2)Signed Off (2)Violation (60)Inspection (2)Special Inspection (6)
11/18/2025
Violation issued (HPD, closed)
I
10/10/2023
Signed off — Alteration
REPLACE GAS FIRED BOILER.
B00856297-I1
10/10/2023
Signed off — Alteration
FROM EXISTING GAS METER, REPLACE GAS PIPING TO GAS BOILER. REPLACE METER BAR.
B00856319-I1
08/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/12/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/04/2023
Permit issued — Plumbing
B00856319-I1-PL
05/04/2023
Permit issued — Boiler Equipment
B00856297-I1-BE
04/22/2023
Filed — Alteration
REPLACE GAS FIRED BOILER.
B00856297-I1
04/22/2023
Filed — Alteration
FROM EXISTING GAS METER, REPLACE GAS PIPING TO GAS BOILER. REPLACE METER BAR.
B00856319-I1
04/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/06/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
04/06/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
04/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/05/2021
Violation issued (HPD, open)
C
02/05/2021
Violation issued (HPD, closed)
C
02/05/2021
Violation issued (HPD, closed)
C
02/14/2020
Violation issued (HPD, closed)
C
02/14/2020
Violation issued (HPD, open)
A
02/14/2020
Violation issued (HPD, open)
C
02/14/2020
Violation issued (HPD, open)
C
02/14/2020
Violation issued (HPD, open)
B
02/14/2020
Violation issued (HPD, open)
B
02/14/2020
Violation issued (HPD, closed)
C
03/27/2019
Violation issued (HPD, closed)
B
03/27/2019
Violation issued (HPD, closed)
B
02/02/2017
Violation issued (HPD, closed)
C
02/02/2017
Violation issued (HPD, closed)
A
11/03/2016
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
02/17/2015
Violation issued (HPD, closed)
I
04/14/2013
Violation issued (HPD, closed)
B
02/06/2013
Violation issued (HPD, closed)
C
12/05/2012
Violation issued (HPD, closed)
C
12/02/2012
Violation issued (HPD, closed)
B
12/02/2012
Violation issued (HPD, closed)
C
10/11/2012
Violation issued (HPD, closed)
C
01/25/2012
Violation issued (HPD, open)
C
01/25/2012
Violation issued (HPD, closed)
B
01/25/2012
Violation issued (HPD, closed)
B
01/25/2012
Violation issued (HPD, closed)
B
01/25/2012
Violation issued (HPD, closed)
B
01/25/2012
Violation issued (HPD, closed)
B
01/25/2012
Violation issued (HPD, closed)
A
01/25/2012
Violation issued (HPD, closed)
A
01/25/2012
Violation issued (HPD, closed)
A
01/25/2012
Violation issued (HPD, closed)
A
01/25/2012
Violation issued (HPD, open)
C
01/18/2012
Violation issued (HPD, closed)
B
01/18/2012
Violation issued (HPD, closed)
B
11/15/2011
Violation issued (HPD, closed)
C
02/23/2009
Violation issued (HPD, closed)
B
08/15/2005
Violation issued (HPD, closed)
B
08/15/2005
Violation issued (HPD, closed)
B
08/15/2005
Violation issued (HPD, closed)
B
08/15/2005
Violation issued (HPD, closed)
B
04/22/1996
Violation issued (HPD, closed)
C
04/22/1996
Violation issued (HPD, closed)
B
04/22/1996
Violation issued (HPD, closed)
B
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC05/04/2023
DOB NOWBoiler EquipmentSigned-offAPPROVED ENERGY LLC05/04/2023
1 project · most recent 05/22/2023
Boiler Controls
FiledStatusContractorScope
05/22/2023CompleteLAURA ELEC'L LIGHTING &Boiler Controls
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/14/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/06/2023Heating SystemsLOUIS ARENAspecial
04/06/2023Maintenance informationLOUIS ARENAenergy_progress
04/06/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
04/06/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/06/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00856297-I1Request digital key ↗
08/27/2026B00856319-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B00856297-I1Open ↗
09/23/2026B00856297-I1Open ↗
09/23/2026B00856297-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00856319-I1Open ↗
08/13/2026B00856297-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B00856297-I1Open ↗
09/23/2026B00856297-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00856319-I1Open ↗
08/13/2026B00856297-I1Open ↗