← Back
BuildNYC
MANHATTAN
Bloom on Forty Fifth Condominium
615 10TH AVENUE · BIN 1090444
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active ViolationsFISP: No Report Filed
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofQueens Theatre Owner LLC15p · 2 filings · 20 docs
BulkheadCentral Harlem - Open Door1p · 1 filing · 14 docs
Floor 8Unit 801, Unit 802, Unit 803Under Construction11p · 3 filings · 13 docs
Floor 7Unit 822, Unit 8236p · 1 filing · 9 docs
Floor 6
Floor 5Bond Vet3p · 2 filings · 11 docs
Floor 4Bond Vet3p · 2 filings · 11 docs
Floor 3Bond Vet3p · 2 filings · 11 docs
Floor 2Bond Vet3p · 2 filings · 11 docs
Floor 1Bond Vet, Central Harlem - Open Door +173p · 15 filings · 20 docs
CellarCentral Harlem - Open Door, Target42p · 6 filings · 20 docs
Site & exteriorTarget17p · 11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hudson 888 Owner, LLC C/O Xin de7203/21/2026
Amerada Hess703/21/2026
Speedway603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/13/2016$57.5M—HESS RETAIL STORES LLC → HUDSON 888 OWNER LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
Outsource Consultants1203/21/2026
Jenny Flores Expediting203/21/2026
D R Brown1203/21/2026
Nexus Consulting NYC403/21/2026
Clarke Construction Consultants203/21/2026
TK Arcdesign403/21/2026
Judge Architecture403/21/2026
Building Brothers203/21/2026
Louis Striar603/21/2026
Synergy Building Consultants203/21/2026
Codegreen103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Precision Hoist & Scaffo*Scaffold1607/08/2026
B.R. Fries & AssociatesGeneral Contractor607/08/2026
Ultimate Signs & Designs CoSign hanger607/08/2026
Core Scaffold SystemsScaffold407/08/2026
GCP ConstructionGeneral Contractor407/23/2026
Rael Automatic Sprinkler CoFire Protection407/08/2026
Ultimate Signs & ElectricElectrical303/22/2026
Signstar NYCSign hanger207/08/2026
HNL Construction CompanyGeneral Contractor203/21/2026
Fulton Plumbing & HeatingPlumbing207/08/2026
Jalex Electrical ContractingElectrical103/22/2026
Kaback EnterprisesGeneral Contractor107/08/2026
DreampipePlumbing107/08/2026
Full Circle PlumbingPlumbing107/08/2026
BH Design GroupGeneral Contractor107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
Metro Fire ProtectionFire Protection107/08/2026
New York Standard Mechanical CoFire Protection107/08/2026
Par Plumbing CoPlumbing107/08/2026
Paul SignsSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Michael House Architect7910307/09/2026
Katz Engineering238105/26/2023
Outsource Special Inspection2827509/29/2021
MEP Inspections1102101/14/2021
Catalpa Special Inspectio2004101/14/2021
Eugene Khananov Architect2816112/23/2020
Judge Architecture748310/03/2020
Dka Consulting3150210/03/2020
Building Lifecycle
All (188)Filed (33)Permit Issued (42)Signed Off (28)Violation (38)Inspection (3)Objection (14)Special Inspection (30)
07/22/2026
Permit issued — General Construction
M01426467-I1-GC
07/09/2026
Filed — Alteration
MINOR INTERIOR ALTERATION TO EXISTING COMBINED UNIT # 801/802/803 AS PER PLANS. PERVIOUS COMBINATIONS UNDER M01072184-I1 & M00855254-I1. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01426467-I1
02/26/2026
Objection resolved — Addressed
02/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
11/24/2025
Objection raised — Scope
10/22/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Scope
10/20/2025
Objection raised — Cost
10/17/2025
Objection raised — Other
09/15/2025
Filed — Alteration
INTERIOR RENOVATION OF EX. COMMERCIAL SPACE WITH GENERALCONSTRUCTION WORK AS PER PLAN FILED HEREWITH. NO CHANGE OFUSE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01268315-I1
09/15/2025
Filed — Alteration
M01268510-I1
09/03/2025
Signed off — Alteration
COMBINATION OF APTS 822/823 FILED UNDER TPPN 3/97 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00855323-I1
09/02/2025
Signed off — Alteration
COMBINATION OF APTS 822/823 FILED UNDER TPPN 3/97 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00855323-S1
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2025
Signed off — Alteration
General construction proposed for interior renovation & combination of units 801 & 802/3 per TPPN 3/1997 as per submitted plans. No change in use, egress, or occupancy.
M01072184-I1
05/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2025
Permit issued — General Construction
M01072184-I1-GC
08/06/2024
Permit issued — General Construction
M01072184-I1-GC
07/17/2024
Objection raised — Other
07/17/2024
Objection resolved — Addressed
07/17/2024
Objection raised — Scope
07/17/2024
Objection resolved — Addressed
07/17/2024
Objection raised — Inspections
07/17/2024
Objection resolved — Addressed
07/10/2024
Filed — Alteration
General construction proposed for interior renovation & combination of units 801 & 802/3 per TPPN 3/1997 as per submitted plans. No change in use, egress, or occupancy.
M01072184-I1
07/10/2024
Special inspection requirement — Final
MICHAEL HOUSE
07/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL HOUSE
06/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL HOUSE
06/25/2024
Special inspection requirement — Lighting in dwelling units
MICHAEL HOUSE
06/25/2024
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL HOUSE
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2024
Signed off — Alteration
COMBINATION AND INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNITS 802 & 803 UNDER TPPN 03/97. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00855254-I1
12/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2023
Permit issued — Plumbing
M00855323-S1-PL
07/20/2023
Permit issued — General Construction
M00855323-I1-GC
05/26/2023
Filed — Alteration
COMBINATION OF APTS 822/823 FILED UNDER TPPN 3/97 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00855323-I1
05/26/2023
Filed — Alteration
COMBINATION OF APTS 822/823 FILED UNDER TPPN 3/97 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00855323-S1
05/04/2023
Permit issued — General Construction
M00855254-I1-GC
04/19/2023
Filed — Alteration
COMBINATION AND INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNITS 802 & 803 UNDER TPPN 03/97. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00855254-I1
04/05/2023
Special inspection requirement — Lighting in dwelling units
Andrew Fethes
04/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Andrew Fethes
04/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YURI KATZ
04/05/2023
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL HOUSE
04/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL HOUSE
04/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL HOUSE
04/05/2023
Special inspection requirement — Lighting in dwelling units
MICHAEL HOUSE
04/05/2023
Special inspection requirement — Interior lighting power
Andrew Fethes
04/05/2023
Special inspection requirement — Final
Andrew Fethes
04/05/2023
Special inspection requirement — Final
MICHAEL HOUSE
03/10/2022
Violation issued (HPD, closed)
A
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/2021
Signed off — Alteration
Mechanical modifications and associated ductwork. No change in use, egress or occupancy.
M00264031-I1
09/30/2021
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
09/30/2021
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
09/30/2021
Special inspection requirement — Final
JONAR MADRIAGA
09/30/2021
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
09/30/2021
Special inspection requirement — Maintenance information
JONAR MADRIAGA
Latest 60 of 188 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGCP Construction07/22/2026
DOB NOWGeneral ConstructionSigned-offGCP Construction05/09/2025
DOB NOWGeneral ConstructionSigned-offGCP Construction08/06/2024
DOB NOWPlumbingSigned-offGregg NY Plumbing08/07/2023
DOB NOWGeneral ConstructionSigned-offBH Design Group07/20/2023
DOB NOWGeneral ConstructionSigned-offGCP Construction05/04/2023
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co06/15/2021
DOB NOWSignSigned-offSignstar NYC03/30/2021
DOB NOWSignSigned-offSignstar NYC03/30/2021
DOB NOWPlumbingSigned-offFulton Plumbing & Heating02/08/2021
DOB NOWSprinklersSigned-offMetro Fire Protection02/05/2021
DOB NOWMechanical SystemsSigned-offKaback Enterprises01/29/2021
DOB NOWPlumbingSigned-offFulton Plumbing & Heating01/28/2021
DOB NOWPlumbingSigned-offDreampipe01/13/2021
DOB NOWSignSigned-offPaul Signs01/08/2021
DOB NOWStructuralSigned-offB.R. Fries & Associates10/26/2020
DOB NOWSprinklersSigned-offNew York Standard Mechanical Co10/07/2020
DOB NOWMechanical SystemsSigned-offHNL Construction Company10/07/2020
DOB NOWPlumbingSigned-offFull Circle Plumbing10/05/2020
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co09/10/2020
DOB NOWSignSigned-offUltimate Signs & Designs Co08/03/2020
DOB NOWSignSigned-offUltimate Signs & Designs Co08/03/2020
DOB NOWSignSigned-offUltimate Signs & Designs Co08/03/2020
DOB NOWSignSigned-offUltimate Signs & Designs Co08/03/2020
DOB NOWSignSigned-offUltimate Signs & Designs Co08/03/2020
DOB NOWSignSigned-offUltimate Signs & Designs Co08/03/2020
DOB NOWMechanical SystemsSigned-offB.R. Fries & Associates07/30/2020
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co06/11/2020
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*04/09/2020
DOB NOWConstruction FenceSigned-offPrecision Hoist & Scaffo*04/06/2020
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*03/30/2020
DOB NOWConstruction FenceSigned-offPrecision Hoist & Scaffo*03/30/2020
DOB NOWStructuralSigned-offB.R. Fries & Associates01/22/2020
DOB NOWMechanical SystemsSigned-offB.R. Fries & Associates01/09/2020
DOB NOWPlumbingSigned-offPar Plumbing Co01/06/2020
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co01/03/2020
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*04/10/2019
DOB NOWConstruction FenceSigned-offPrecision Hoist & Scaffo*04/10/2019
DOB NOWConstruction FenceSigned-offPrecision Hoist & Scaffo*11/08/2018
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*09/28/2018
+ 52 more permits on file
21 projects · most recent 10/29/2024
General Wiring Lighting
FiledStatusContractorScope
10/29/2024CompleteJalex Electrical Contracting—
12/08/2023Permit IssuedKings Electric CoGeneral Wiring
10/14/2022CompleteBigman BrothersGeneral Wiring, Lighting
05/27/2021CompleteRainbow Electric Co—
05/27/2021CompleteRainbow Electric Co—
04/24/2021CompleteRobert Chimenti100 meters, 1 new_meters
04/14/2021CompleteE G ElectricGeneral Wiring
04/13/2021CompleteTransel Elev. & ElectricGeneral Wiring
01/29/2021CompleteEnterprise Electrical SystemsGeneral Wiring
01/12/2021CompleteTMF Electrical Contracting—
10/20/2020CompleteUltimate Signs & Electric—
10/20/2020CompleteUltimate Signs & Electric—
10/20/2020CompleteUltimate Signs & Electric—
10/20/2020CompleteUltimate Signs & Electric—
10/07/2020CompleteR & T ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
02/26/2026Tenant Protection Plan Compliance—special
08/07/2025Fire-Resistant Penetrations and Joints—special
07/10/2024FinalMICHAEL HOUSEprogress
07/10/2024Fire-Resistant Penetrations and JointsMICHAEL HOUSEspecial
06/25/2024Fire-Resistance Rated ConstructionMICHAEL HOUSEprogress
06/25/2024Energy Code Compliance InspectionsMICHAEL HOUSEprogress
06/25/2024Lighting in dwelling unitsMICHAEL HOUSEenergy_progress
04/05/2023Lighting in dwelling unitsMICHAEL HOUSEenergy_progress
04/05/2023Fire-Resistance Rated ConstructionMICHAEL HOUSEprogress
04/05/2023FinalMICHAEL HOUSEprogress
04/05/2023Energy Code Compliance InspectionsMICHAEL HOUSEprogress
04/05/2023FinalAndrew Fethesprogress
04/05/2023Energy Code Compliance InspectionsAndrew Fethesprogress
04/05/2023Interior lighting powerAndrew Fethesenergy_progress
04/05/2023Lighting in dwelling unitsAndrew Fethesenergy_progress
04/05/2023Fire-Resistant Penetrations and JointsYURI KATZspecial
04/05/2023Fire-Resistant Penetrations and JointsMICHAEL HOUSEspecial
09/30/2021Mechanical SystemsJONAR MADRIAGAspecial
09/30/2021Energy Code Compliance InspectionsJONAR MADRIAGAprogress
09/30/2021FinalJONAR MADRIAGAprogress
09/30/2021Maintenance informationJONAR MADRIAGAenergy_progress
09/30/2021HVAC insulation and sealing JONAR MADRIAGAenergy_progress
09/30/2021HVAC and service water heating equipment JONAR MADRIAGAenergy_progress
09/30/2021HVAC and service water heating system controls JONAR MADRIAGAenergy_progress
09/30/2021Shutoff dampersJONAR MADRIAGAenergy_progress
Latest 25 of 63.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bond VetMedical / HealthcareFloors 1–5
Project M00487070 Alteration · LOC Issued · 03/23/2021
Project M00487071 Alteration · LOC Issued · 03/23/2021
Central Harlem - Open DoorCommunity FacilityFloor 1
Project M00392084 Alteration · LOC Issued · 10/03/2020
Project M00392076 Alteration · LOC Issued · 10/01/2020
Project M00380464 Alteration · LOC Issued · 09/30/2020
TargetRetailCellar, Floor 1
Project M00394029 Alteration · LOC Issued · 09/09/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 860 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch14
09/06/2026M00002291-I1Request digital key ↗
09/06/2026M00002290-I1Request digital key ↗
09/06/2026M00081986-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sign7
09/04/2026M00371428-I1Request digital key ↗
09/04/2026M00371480-I1Request digital key ↗
09/04/2026M00371476-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00265870-I1Request digital key ↗
09/04/2026M00394029-I1Request digital key ↗
09/04/2026M00392076-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00265911-I1Request digital key ↗
09/04/2026M00380464-I1Request digital key ↗
09/04/2026M00443933-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00264031-I1Request digital key ↗
09/04/2026M00392084-I1Request digital key ↗
09/04/2026M00449579-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00264122-I1Request digital key ↗
▸Applications & Permits154
▸BISPLAN / WORK APPROVAL APPLICATION91
03/28/2022121190889Open ↗
03/21/2022121190889Open ↗
10/13/2021121190889Open ↗
Showing 3 of 91 on file for this type
▸BISWORK PERMIT APPLICATION54
06/23/2021140534795Open ↗
04/21/2021121190889Open ↗
04/13/2021140978743Open ↗
Showing 3 of 54 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation5
07/16/2020140534919Open ↗
Showing 1 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/19/2020122808195Open ↗
Showing 1 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M00264122-I1Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
08/31/2021123905186Open ↗
Showing 1 of 2 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
08/31/2021123905186Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications182
▸DOB NOWProgress Inspector Seal & Signature43
09/02/2026M00371465-I1Open ↗
09/01/2026M00487071-I1Open ↗
09/01/2026M00371453-I1Open ↗
Showing 3 of 43 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/06/2026M00002291-I1Open ↗
09/06/2026M00002290-I1Open ↗
09/06/2026M00081986-I1Open ↗
Showing 3 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
12/23/2020140995421Open ↗
12/22/2020140993110Open ↗
Showing 2 of 20 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY11
12/23/2020140995421Open ↗
12/22/2020140993110Open ↗
10/02/2020140959675Open ↗
Showing 3 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION10
12/23/2020140995421Open ↗
12/22/2020140993110Open ↗
Showing 2 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/19/2026M00426817-I1Open ↗
08/30/2026M00855254-I1Open ↗
08/28/2026M01072184-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
01/26/2021140978743Open ↗
10/02/2020140959675Open ↗
Showing 2 of 4 on file for this type
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING10
03/28/2022121190889Open ↗
Showing 1 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS7
08/02/2021121190889Open ↗
08/02/2021121190889Open ↗
08/02/2021121190889Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
06/24/2021122944396Open ↗
07/17/2020121190889Open ↗
07/17/2020122944396Open ↗
Showing 3 of 5 on file for this type
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
10/28/2021121190889Open ↗
Showing 1 of 2 on file for this type
▸BISSEWER CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection63
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist27
09/06/2026M00002291-I1Open ↗
09/06/2026M00002290-I1Open ↗
09/04/2026M00444909-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWTenant Protection Plan8
09/04/2026M00444909-I1Open ↗
08/13/2026M00264031-P1Open ↗
08/13/2026M00265870-I1Open ↗
Showing 3 of 8 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON5
12/22/2020140993110Open ↗
Showing 1 of 5 on file for this type
▸BISTenant Protection Plan and Notes5
10/02/2020140959675Open ↗
Showing 1 of 5 on file for this type
▸BISSTREET TREE CHECKLIST4
10/28/2021121190889Open ↗
Showing 1 of 4 on file for this type
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST4
12/23/2020140995421Open ↗
10/02/2020140959675Open ↗
08/19/2020122808195Open ↗
Showing 3 of 4 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN3
04/27/2021140993110Open ↗
04/07/2021140978743Open ↗
12/23/2020140995421Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M00264122-I1Open ↗
08/13/2026M01268315-I1Open ↗
▸BISSTREET TREE SIGNOFF1
05/12/2022121190889Open ↗
▸BISSTREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
12/14/2022121190889Open ↗
09/03/2021140993110Open ↗
06/01/2021140995421Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
05/12/2022121190889Open ↗
09/03/2021140993110Open ↗
01/11/2021140959675Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/23/2020140995421Open ↗
12/22/2020140993110Open ↗
10/02/2020140959675Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/01/2021140995421Open ↗
12/30/2020123793298Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00449579-I1Open ↗
08/13/2026M00392084-I1Open ↗
▸BISNYCECC ANALYSIS1
10/02/2020140959675Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
08/31/2022121190889Open ↗
▸Inspections & Test Reports68
▸BISTECHNICAL REPORT: RESPONSIBILITY43
11/29/2022121190889Open ↗
10/15/2021123336880Open ↗
09/03/2021140993110Open ↗
Showing 3 of 43 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
11/29/2022121190889Open ↗
01/11/2021140959675Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs100
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST39
10/15/2021123336880Open ↗
09/03/2021140993110Open ↗
07/21/2021140873437Open ↗
Showing 3 of 39 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION33
07/02/2021140534795Open ↗
07/17/2020121190889Open ↗
07/17/2020122944396Open ↗
Showing 3 of 33 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE16
07/23/2021121190889Open ↗
07/21/2021121190889Open ↗
03/12/2021121190889Open ↗
Showing 3 of 16 on file for this type
▸BISSUPERSEDING LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
10/28/2021121190889Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
11/06/2020121190889Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT27
06/21/2021140867015Open ↗
06/01/2021140995421Open ↗
01/26/2021140978743Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
09/03/2021140993110Open ↗
07/21/2021140873437Open ↗
06/24/2021122944396Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
04/21/2021121190889Open ↗
Showing 1 of 6 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms114
▸BISADDITIONAL INFORMATION53
04/15/2022121190889Open ↗
11/04/2021121190889Open ↗
08/31/2021123905186Open ↗
Showing 3 of 53 on file for this type
▸BISEFILING COVER SHEET26
08/31/2021123905186Open ↗
08/26/2021123905186Open ↗
08/12/2020122808195Open ↗
Showing 3 of 26 on file for this type
▸BISBOROUGH INTAKE FORM21
07/17/2020121190889Open ↗
Showing 1 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET14
01/26/2021140978743Open ↗
12/23/2020140995421Open ↗
12/22/2020140993110Open ↗
Showing 3 of 14 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
08/19/2020122808195Open ↗
Showing 1 of 5 on file for this type
▸BISPLOT DIAGRAM2
08/12/2020122808195Open ↗
Showing 1 of 2 on file for this type
▸BISBEST SQUAD - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
09/06/2026M00002291-I1Open ↗
09/06/2026M00002290-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
09/06/2026M00002291-I1Open ↗
09/06/2026M00002290-I1Open ↗
▸BISPARKS DEPT PAYMENT OF 18 OFF SITE TREES1