← Back
BuildNYC
Over six families without stores
615 EVERGREEN AVENUE
BROOKLYN · BIN 3078789
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6Zoning
11,970 sfGross Floor Area
12Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: Bushwick Gardens · 24,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Unit 1C, Unit 1D1p · 1 filing · 7 docs
CellarMechanical HVAC workUnder Construction40p · 3 filings · 20 docs
Site & exteriorMechanical HVAC workUnder Construction35p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pennrose3810/06/2026
Bushwick Gardens903/22/2026
New York City Housing Authority803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering610/07/2025
IMEG Consulting101/18/2024
Christopher Compton405/13/2022
Scalar Architecture109/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC803/21/2026
AE Design Solution203/21/2026
JM Zoning1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J-J PlumbingPlumbing710/06/2026
Procida ConstructionGeneral Contractor504/09/2026
Procida ConstructionScaffold203/21/2026
?John SR MariElectrical103/21/2026
Interstate Restorationspecialty_contractor107/08/2026
G.M.A. Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106710/07/2025
Environmental Code Consulting5516405/13/2022
Building Lifecycle
10/05/2026
Signed off — Alteration
RENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B00960828-I1
10/05/2026
Permit renewed — Plumbing
Renewed without changes
B00960994-S5-PL
09/29/2026
Permit renewed — Plumbing
Renewed without changes
B00960994-S2-PL
09/24/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/01/2026
Signed off — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00960994-S4
95 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJ-J Plumbing10/05/2026
DOB NOWPlumbingPermit IssuedJ-J Plumbing09/29/2026
DOB NOWPlumbingPermit IssuedJ-J Plumbing10/17/2025
DOB NOWFoundationSigned-offProcida Construction10/16/2025
DOB NOWEarth WorkSigned-offProcida Construction10/16/2025
DOB NOWPlumbingPermit IssuedJ-J Plumbing04/09/2025
DOB NOWMechanical SystemsSigned-offProcida Construction03/31/2025
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing03/25/2025
DOB NOWGeneral ConstructionSigned-offProcida Construction06/07/2024
DOB NOWPlumbingPermit IssuedJ-J Plumbing05/09/2024
DOB NOWMechanical SystemsSigned-offProcida Construction04/08/2024
DOB NOWPlumbingPermit IssuedJ-J Plumbing04/08/2024
DOB NOWGeneral ConstructionSigned-offInterstate Restoration05/02/2022
DOB NOWBoiler EquipmentSigned-offG.M.A. Plumbing & Heating01/12/2022
DOB NOWConstruction FenceSigned-offProcida Construction09/19/2019
BISOTISSUEDProcida Construction04/26/2021
BISMHISSUEDProcida Construction04/26/2021
BISBLISSUEDTT Mechanical12/15/2020
BISPLISSUEDTT Mechanical12/15/2020
BISOTISSUEDBright Power Installation06/24/2020
BISBLISSUEDTT Mechanical11/25/2019
BISBLISSUEDTT Mechanical10/02/2019
BISPLISSUEDTT Mechanical10/02/2019
BISMHISSUEDProcida Construction09/20/2019
BISOTISSUEDProcida Construction09/20/2019
1 project · most recent 10/07/2025
Heating Systems
FiledStatusContractorScope
10/07/2025Signed-offProcida ConstructionHeating Systems
1 project · most recent 10/07/2025
FiledStatusContractorScope
10/07/2025———
1 project · most recent 10/07/2025
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
10/07/2025Permit IssuedJ-J PlumbingGas, Plumbing-Sprinkler, Storm, Water/Sanitary
5 projects · most recent 06/29/2024
General Wiring
FiledStatusContractorScope
06/29/2024Permit IssuedSNB Electrical ContngGeneral Wiring
06/03/2020Permit IssuedE & M Electrical NYGeneral Wiring
05/12/2020Permit IssuedE & M Electrical NYGeneral Wiring
03/13/2020CompleteVenture Home Solar—
10/04/2019Permit IssuedE & M Electrical NYGeneral Wiring
2 projects · most recent 10/07/2025
Steel
FiledStatusContractorScope
10/07/2025Permit IssuedJ-J Plumbing—
01/18/2024Signed-offProcida ConstructionSteel
1 project · most recent 10/07/2025
Earthwork Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/07/2025Permit IssuedJ-J PlumbingEarthwork, Tenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/17/2024Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
07/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/13/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
10/02/2025Sprinkler SystemsGEORGE GHEBRYALspecial
10/02/2025Tenant Protection Plan Compliance—special
10/02/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/02/2025Post-installed AnchorsGEORGE GHEBRYALspecial
02/05/2025Heating SystemsGEORGE GHEBRYALspecial
02/05/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
02/05/2025Maintenance informationGEORGE GHEBRYALenergy_progress
02/05/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
02/05/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
02/05/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
12/08/2023Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
12/08/2023Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/08/2023Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
12/08/2023Subsurface Investigations (Borings/Test Pits)Gregory Pillorispecial
12/08/2023Structural Steel - DetailsGEORGE GHEBRYALspecial
12/08/2023Shutoff dampersGEORGE GHEBRYALenergy_progress
12/08/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
12/08/2023Heating SystemsGEORGE GHEBRYALspecial
12/08/2023MeteringGEORGE GHEBRYALenergy_progress
12/08/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
12/08/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
12/08/2023HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
12/08/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
12/08/2023HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
12/08/2023Maintenance informationGEORGE GHEBRYALenergy_progress
Latest 25 of 39.
181 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account