Elevator apt, semi-fireproof without stores
Brownsville South
615 OSBORN STREET · BIN 3428579
💬 Discuss this project
2024Year Built
4Stories
D1Building Class
R6Zoning
10,401 sfGross Floor Area
12Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: HP SOUTH LIBERTY HOUSING DEVELOPMENT FUN D COMPANY, · 4,300 sf lot · 2.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof3p · 3 filings · 20 docs
Bulkhead3p · 2 filings · 20 docs
Floor 47p · 4 filings · 20 docs
Floor 36p · 4 filings · 20 docs
Floor 27p · 4 filings · 20 docs
Floor 19p · 4 filings · 20 docs
Cellar9p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DONNREILL407/08/2026
CRESCENT-NUVO GROUP503/22/2026
DEPT OF HOUSING PRESERVATION DE203/21/2026
NYC HOUSING PRESERVATION DEVEL203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMTG CONSULTANTS INC1305/05/2026
PAUL PERDEK, PROF. ENG. PLLC104/03/2025
ASR ENGINEERING PC112/11/2024
DE NARDIS ENGINEERING, LLC510/04/2024
AGE ENGINEERING, LLC110/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors1003/21/2026
WILLIAM VITACCO ASSOCIATES703/21/2026
P WOLFE CONSULTANTS203/21/2026
A1 EXPEDITING SERVICE203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARANDA PLBG & HTG CORPPlumbing1807/08/2026
WITH PRIDE AIR CONDITIONINGGeneral Contractor504/09/2026
CRESCENT-NUVO GROUP LLCGeneral Contractor507/08/2026
TOPLINE NYC INCGeneral Contractor303/21/2026
CRESCENT STREET CONSTRUCTIONGeneral Contractor307/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection207/08/2026
DYNAMIC PLBNG SPRKR CORPlumbing103/22/2026
RICHARD NEUElectrical103/22/2026
DONNREILL, INCGeneral Contractor107/08/2026
ANTHONY LUCIANOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT68641605/05/2026
AMERICAN CONSTRUCTION TES9731102/28/2020
Building Lifecycle
All (137)Filed (20)Permit Issued (21)Signed Off (9)Violation (6)Inspection (9)Objection (42)Special Inspection (30)
08/04/2026
Signed off — Alteration
Sprinkler work filed in-conjunction with NB application 321596395.
B00236870-I1
06/25/2026
Signed off — Alteration
Plumbing work as shown on plans filed herewith.
B00236869-I1
06/01/2026
Signed off — Alteration
Boiler work as shown on plans filed herewith
B00411183-I1
05/05/2026
Filed — Alteration
Plumbing work as shown on plans filed herewith.
B00236869-P4
05/04/2026
Special inspection requirement — HVAC and service water heating equipment
DOMINIC DANQUAH
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
DOMINIC DANQUAH
05/04/2026
Special inspection requirement — HVAC and service water heating system controls
DOMINIC DANQUAH
05/04/2026
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
05/04/2026
Special inspection requirement — HVAC insulation and sealing
DOMINIC DANQUAH
04/23/2026
Signed off — Alteration
Mechanical work as shown on plans filed herewith. in conjunction with NB application 321596395
B00236868-I1
04/03/2026
Permit issued — Mechanical Systems
B00236868-I1-MS
03/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
DOMINIC DANQUAH
03/11/2026
Special inspection requirement — Heating Systems
JUAN GOMEZ
03/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DOMINIC DANQUAH
03/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
DOMINIC DANQUAH
03/11/2026
Special inspection requirement — Maintenance information
DOMINIC DANQUAH
02/25/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
02/18/2026
Filed — Alteration
Boiler work as shown on plans filed herewith
B00411183-P2
02/05/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/03/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/29/2026
Filed — Alteration
Mechanical work as shown on plans filed herewith. in conjunction with NB application 321596395
B00236868-P3
01/28/2026
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
01/28/2026
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
01/28/2026
Special inspection requirement — HVAC and service water heating equipment
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — Energy Code Compliance Inspections
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — Metering
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — Heating Systems
JUAN GOMEZ
01/28/2026
Special inspection requirement — Electrical motors and elevators
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — Lighting controls
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — Maintenance information
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — HVAC and service water heating system controls
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — Interior lighting power
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — HVAC insulation and sealing
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — Shutoff dampers
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — Final
JUAN GOMEZ
01/28/2026
Special inspection requirement — Lighting in dwelling units
DOMINIC DANQUAH
01/28/2026
Special inspection requirement — Exterior lighting power
DOMINIC DANQUAH
01/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2025
Signed off — Alteration
HEREWITH FILING FOR THE INSTALLATION OF A TEMPORARY FENCE TO PROTECT, SECURE, AND PROVIDE A SAFE STAGING AREA. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00926764-I1
12/19/2025
Signed off — Alteration
Foundation work as shown on plans filed herewith. Filed in conjunction with New Building 321596395
B00738915-I1
12/15/2025
Permit issued — Boiler Equipment
B00411183-I1-BE
12/15/2025
Permit issued — Plumbing
B00236869-I1-PL
12/01/2025
Signed off — Alteration
Structural work as shown on plans filed herewith.
B00236875-I1
10/03/2025
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01176383-I1
08/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/30/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01139440-I1
06/06/2025
Violation issued (ECB, closed)
Construction
06/06/2025
Violation issued (ECB, closed)
Construction
06/06/2025
Violation issued (ECB, closed)
Construction
06/06/2025
Violation issued (ECB, closed)
Unknown
06/05/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/14/2025
Permit issued — Sprinklers
B00236870-I1-EW-SP
04/24/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/23/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/22/2025
Permit issued — Mechanical Systems
B00236868-I1-MS
04/03/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01176383-I1
04/03/2025
Permit issued — Supported Scaffold
B01176383-I1-SF
04/01/2025
Violation issued (ECB, closed)
Unknown
04/01/2025
Violation issued (ECB, closed)
Unknown
01/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWITH PRIDE AIR CONDITIONI04/03/2026
DOB NOWBoiler EquipmentSigned-offARANDA PLBG & HTG CORP12/15/2025
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP12/15/2025
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL05/14/2025
DOB NOWMechanical SystemsSigned-offWITH PRIDE AIR CONDITIONI04/22/2025
DOB NOWSupported ScaffoldSigned-offDONNREILL04/03/2025
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP12/12/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC12/11/2024
DOB NOWBoiler EquipmentSigned-offARANDA PLBG & HTG CORP12/10/2024
DOB NOWFoundationSigned-offCRESCENT-NUVO GROUP LLC10/17/2024
DOB NOWConstruction FenceSigned-offCRESCENT-NUVO GROUP LLC10/01/2024
DOB NOWStructuralSigned-offCRESCENT-NUVO GROUP LLC08/20/2024
DOB NOWFoundationSigned-offCRESCENT-NUVO GROUP LLC05/30/2024
DOB NOWMechanical SystemsSigned-offWITH PRIDE AIR CONDITIONI05/23/2024
DOB NOWBoiler EquipmentSigned-offARANDA PLBG & HTG CORP12/18/2023
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL12/13/2023
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP12/05/2023
DOB NOWStructuralSigned-offCRESCENT STREET CONSTRUCT11/22/2023
DOB NOWMechanical SystemsSigned-offCRESCENT STREET CONSTRUCT11/22/2023
DOB NOWFoundationSigned-offCRESCENT STREET CONSTRUCT11/22/2023
DOB NOWConstruction FenceSigned-offCRESCENT-NUVO GROUP LLC10/31/2023
BIS—ISSUEDCRESCENT-NUVO GROUP LLC07/23/2025
BIS—ISSUEDCRESCENT-NUVO GROUP LLC07/30/2024
BIS—ISSUEDCRESCENT-NUVO GROUP LLC07/30/2024
BIS—ISSUEDCRESCENT STREET CONSTRUCTION11/16/2023
BIS—ISSUEDCRESCENT STREET CONSTRUCTION11/16/2023
BISEQISSUEDG.N. CONSTRUCTION INC05/25/2012
1 project · most recent 05/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/05/2026Signed-offARANDA PLBG & HTG CORPGas, Storm, Water/Sanitary
5 projects · most recent 04/06/2026
General Wiring
FiledStatusContractorScope
04/06/2026CompleteBASS ELECTRICAL CORP.—
04/06/2026CompleteBASS ELECTRICAL CORP.General Wiring
05/13/2025CompleteJAM ELECTRICAL CORP—
12/24/2024CompleteRICHARD NEU—
05/28/2024CompleteBASS ELECTRICAL CORP.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/25/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
02/05/2026Pass-Final Boiler Equipment InspectionPassView ↗
02/03/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
01/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/05/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/24/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
05/04/2026Post-installed AnchorsJUAN GOMEZspecial
05/04/2026HVAC and service water heating equipment DOMINIC DANQUAHenergy_progress
05/04/2026HVAC insulation and sealing DOMINIC DANQUAHenergy_progress
05/04/2026HVAC and service water heating system controls DOMINIC DANQUAHenergy_progress
05/04/2026Energy Code Compliance InspectionsDOMINIC DANQUAHprogress
03/11/2026Heating SystemsJUAN GOMEZspecial
03/11/2026HVAC-R and service water heating equipmentDOMINIC DANQUAHenergy_progress
03/11/2026Maintenance informationDOMINIC DANQUAHenergy_progress
03/11/2026HVAC-R and service water heating system controlsDOMINIC DANQUAHenergy_progress
03/11/2026HVAC-R and service water piping design and insulationDOMINIC DANQUAHenergy_progress
01/28/2026FinalJUAN GOMEZprogress
01/28/2026Shutoff dampersDOMINIC DANQUAHenergy_progress
01/28/2026Interior lighting powerDOMINIC DANQUAHenergy_progress
01/28/2026HVAC and service water heating system controls DOMINIC DANQUAHenergy_progress
01/28/2026Maintenance informationDOMINIC DANQUAHenergy_progress
01/28/2026Lighting controlsDOMINIC DANQUAHenergy_progress
01/28/2026Electrical motors and elevatorsDOMINIC DANQUAHenergy_progress
01/28/2026HVAC insulation and sealing DOMINIC DANQUAHenergy_progress
01/28/2026MeteringDOMINIC DANQUAHenergy_progress
01/28/2026HVAC and service water heating equipment DOMINIC DANQUAHenergy_progress
01/28/2026Exterior lighting powerDOMINIC DANQUAHenergy_progress
01/28/2026Lighting in dwelling unitsDOMINIC DANQUAHenergy_progress
01/28/2026Heating SystemsJUAN GOMEZspecial
01/28/2026Mechanical SystemsJUAN GOMEZspecial
01/28/2026Post-installed AnchorsJUAN GOMEZspecial
Latest 25 of 116.
▾Documents — 315 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch6
08/28/2026B00738915-P1Request digital key ↗
08/28/2026B00738915-P2Request digital key ↗
08/28/2026B00738915-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/28/2026B00236868-I1Request digital key ↗
08/15/2026B00236868-P2Request digital key ↗
08/15/2026B00236868-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/17/2026B00236869-I1Request digital key ↗
08/17/2026B00236869-P4Request digital key ↗
08/17/2026B00236869-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/02/2026B00411183-I1Request digital key ↗
09/02/2026B00411183-P2Request digital key ↗
08/14/2026B00411183-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/25/2026B00236870-I1Request digital key ↗
08/15/2026B00236870-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/26/2026B00236875-I1Request digital key ↗
08/26/2026B00236875-P1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION19
02/09/2026340760251Open ↗
02/09/2026321596395Open ↗
02/03/2026340760251Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION8
07/25/2025321596395Open ↗
07/31/2024321596395Open ↗
07/31/2024321596395Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
09/09/2021340760251Open ↗
09/09/2021340760251Open ↗
08/30/2020340760251Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/02/2026321596395Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM2
07/31/2024321596395Open ↗
02/23/2022321596395Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/21/2026321596395Open ↗
▸Seals & Professional Certifications127
▸DOB NOWSpecial Inspector Seal & Signature54
09/23/2026B00411183-I1Open ↗
09/01/2026B00236869-P4Open ↗
09/01/2026B00236868-P2Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWProgress Inspector Seal & Signature48
09/23/2026B00411183-I1Open ↗
09/23/2026B00411183-I1Open ↗
09/23/2026B00411183-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/02/2026B00411183-P2Open ↗
09/02/2026B00411183-I1Open ↗
09/02/2026B00411183-P1Open ↗
Showing 3 of 21 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/30/2020340760251Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/25/2012320483035Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/25/2012320483035Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/25/2012320483035Open ↗
▸Trade Schedules & Equipment3
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
01/09/2026321596395Open ↗
01/09/2026321596395Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
05/19/2021321596395Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
09/09/2021340760251Open ↗
09/09/2021340760251Open ↗
05/19/2021321596395Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
09/09/2021340760251Open ↗
▸BISSTREET TREES SITE PLAN1
05/19/2021321596395Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
10/22/2025321596395Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
11/03/2023321596395Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
05/14/2024321596395Open ↗
05/14/2024321596395Open ↗
11/03/2023321596395Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/02/2026B00411183-I1Open ↗
08/17/2026B00236869-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/02/2026B00411183-I1Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY12
07/23/2024321596395Open ↗
07/23/2024321596395Open ↗
07/23/2024321596395Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSOIL REPORT3
08/13/2026B00738915-P2Open ↗
08/13/2026B00738915-P1Open ↗
08/13/2026B00738915-I1Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/22/2025321596395Open ↗
▸BISPOST-INSTALLED ANCHORS1
10/22/2025321596395Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
10/22/2025321596395Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
10/22/2025321596395Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
10/22/2025321596395Open ↗
▸BISSOIL REPORT1
05/19/2021321596395Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/16/2023321596395Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/19/2021321596395Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
11/16/2023321596395Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
10/22/2025321596395Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/22/2025321596395Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/22/2025321596395Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00738915-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00738915-I1Open ↗
▸Approvals, Objections & Sign-offs48
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/02/2026B00411183-I1Open ↗
09/02/2026B00411183-P2Open ↗
08/17/2026B00236869-P4Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)18
09/02/2026B00411183-I1Open ↗
09/02/2026B00411183-P2Open ↗
08/17/2026B00236869-P4Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/31/2024321596395Open ↗
06/06/2024321596395Open ↗
01/22/2024321596395Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
02/09/2026321596395Open ↗
04/29/2021321596395Open ↗
04/14/2020321596395Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
05/19/2021321596395Open ↗
08/30/2020340760251Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/25/2012320483035Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE5
07/25/2025321596395Open ↗
07/31/2024321596395Open ↗
06/06/2024321596395Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION13
11/12/2024321596395Open ↗
07/31/2024321596395Open ↗
03/05/2024321596395Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET2
02/05/2020321596395Open ↗
05/25/2012320483035Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2020340760251Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/30/2020340760251Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
07/31/2024321596395Open ↗
05/09/2023340760251Open ↗
05/09/2023340760251Open ↗
Showing 3 of 8 on file for this type
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
10/22/2025321596395Open ↗
▸BISUNDERPINNING (2014)1
10/22/2025321596395Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
10/22/2025321596395Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/09/2021340760251Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/19/2021321596395Open ↗