Factory, industrial, semi-fireproof
616 ATKINS AVENUE
BROOKLYN · BIN 3098794
💬 Discuss this project
1960Year Built
1Stories
F4Building Class
M1-1Zoning
7,400 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Factory, industrial, semi-fireproof · Owner of record: 616 Atkins Ave BRK · 7,400 sf lot · 1 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof616 Atkins Ave Brk LLC85p · 5 filings · 20 docs
Floor 1616 Atkins Ave Brk LLC144p · 7 filings · 20 docs
Site & exteriorEast Brooklyn Eats7p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
616 Atkins Ave BRK5107/08/2026
Fasteners Dimensions103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2021$2.2M—— → —$303/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
2LS Consulting Engineering805/23/2023
Jarmel Kizel Architects & Engineers1205/04/2023
HC Engineering103/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants4003/21/2026
JP Expedite203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alchemy DevelopmentGeneral Contractor1007/08/2026
WCD ServicesGeneral Contractor303/21/2026
J. Caiazzo Plumbing & HeatingPlumbing207/08/2026
Willdan Electrical of NYElectrical103/22/2026
Vallesigns & AwningsSign hanger107/08/2026
J. Caiazzo Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlantic Engineeringlabor13811805/23/2023
Building Lifecycle
All (89)Filed (21)Permit Issued (9)Signed Off (7)Violation (4)Inspection (10)Objection (8)Special Inspection (30)
08/18/2023
Signed off — Alteration
MODIFICATIONS TO PLUMBING AND INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00705132-I1
06/12/2023
Signed off — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN, NO CHANGE TO USE, EGRESS OR OCCUPATION
B00813305-I1
06/08/2023
Signed off — Alteration
INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00699213-I1
06/06/2023
Signed off — Alteration
MODIFICATIONS TO HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00704967-I1
05/23/2023
Filed — Alteration
MODIFICATIONS TO PLUMBING AND INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00705132-P3
05/22/2023
Special inspection requirement — Sprinkler Systems
Christopher O'Malley
05/22/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Christopher O'Malley
05/17/2023
Special inspection requirement — Mechanical Systems
Christopher O'Malley
05/17/2023
Special inspection requirement — Ventilation and air distribution system
Christopher O'Malley
05/17/2023
Special inspection requirement — Lighting controls
Christopher O'Malley
05/17/2023
Special inspection requirement — Interior lighting power
Christopher O'Malley
05/17/2023
Special inspection requirement — Maintenance information
Christopher O'Malley
05/17/2023
Special inspection requirement — Final
Christopher O'Malley
05/17/2023
Special inspection requirement — Duct leakage testing, insulation and design
Christopher O'Malley
05/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher O'Malley
05/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Christopher O'Malley
05/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
05/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Christopher O'Malley
05/17/2023
Special inspection requirement — Exterior lighting power
Christopher O'Malley
05/15/2023
Filed — Alteration
MODIFICATIONS TO HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00704967-P3
05/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
05/12/2023
Special inspection requirement — Fenestration areas
Christopher O'Malley
05/12/2023
Special inspection requirement — Fenestration air leakage
Christopher O'Malley
05/12/2023
Special inspection requirement — Final
Christopher O'Malley
05/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
05/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
Christopher O'Malley
05/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher O'Malley
05/12/2023
Special inspection requirement — Insulation placement and R values
Christopher O'Malley
05/09/2023
Special inspection requirement — Exterior lighting power
Christopher O'Malley
05/09/2023
Special inspection requirement — Duct leakage testing, insulation and design
Christopher O'Malley
05/09/2023
Special inspection requirement — Lighting controls
Christopher O'Malley
05/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
05/09/2023
Special inspection requirement — Mechanical Systems
Christopher O'Malley
05/09/2023
Special inspection requirement — Final
Christopher O'Malley
05/09/2023
Special inspection requirement — Interior lighting power
Christopher O'Malley
05/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Christopher O'Malley
05/04/2023
Filed — Alteration
INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00699213-P2
05/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/26/2023
Signed off — Alteration
STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00705945-I1
04/20/2023
Filed — Alteration
STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00705945-P3
04/05/2023
Filed — Alteration CO
FILING HEREWITH ALTERATION-CO FOR COMMERCIAL KITCHENS AS PER PLANS FILED HEREWITH.
B00794376-P2
03/21/2023
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN, NO CHANGE TO USE, EGRESS OR OCCUPATION
B00813305-I1
03/21/2023
Permit issued — Sign
B00813305-I1-SG
03/17/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/14/2023
Filed — Alteration
MODIFICATIONS TO PLUMBING AND INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00705132-P2
03/07/2023
Filed — Alteration
MODIFICATIONS TO HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00704967-P2
03/06/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/17/2023
Filed — Alteration CO
FILING HEREWITH ALTERATION-CO FOR COMMERCIAL KITCHENS AS PER PLANS FILED HEREWITH.
B00794376-P1
02/06/2023
Permit issued — General Construction
B00794376-I1-GC
01/31/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/04/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/27/2022
Inspection — Pass-Final House Connection
Pass
View inspection ↗
12/08/2022
Violation issued (ECB, closed)
Construction
10/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2022
Objection raised — Inspections
09/22/2022
Objection resolved — Addressed
09/22/2022
Objection raised — Energy
09/22/2022
Objection resolved — Addressed
09/22/2022
Objection raised — Inspections
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offVallesigns & Awnings03/21/2023
DOB NOWGeneral ConstructionPermit IssuedAlchemy Development02/06/2023
DOB NOWGeneral ConstructionSigned-offAlchemy Development06/22/2022
DOB NOWStructuralSigned-offAlchemy Development06/06/2022
DOB NOWPlumbingSigned-offJ. Caiazzo Plumbing & Heating05/19/2022
DOB NOWPlumbingSigned-offJ. Caiazzo Plumbing & Heating05/19/2022
DOB NOWSprinklersSigned-offAnthony Caiazzo05/19/2022
DOB NOWGeneral ConstructionSigned-offWCD Services05/17/2022
DOB NOWMechanical SystemsSigned-offAlchemy Development05/13/2022
3 projects · most recent 03/23/2023
General Wiring
FiledStatusContractorScope
03/23/2023CompleteSigns Cad—
06/21/2022CompleteAnco Electl ContctngGeneral Wiring
11/01/2018CompleteWilldan Electrical of NY—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/17/2023Fail-Final CND-Occupancy InspectionFailView ↗
03/06/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/04/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/27/2022Pass-Final House ConnectionPassView ↗
10/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
05/22/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationChristopher O'Malleyspecial
05/22/2023Sprinkler SystemsChristopher O'Malleyspecial
05/17/2023Mechanical SystemsChristopher O'Malleyspecial
05/17/2023Exterior lighting powerChristopher O'Malleyenergy_progress
05/17/2023HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
05/17/2023Ventilation and air distribution systemChristopher O'Malleyenergy_progress
05/17/2023Interior lighting powerChristopher O'Malleyenergy_progress
05/17/2023Maintenance informationChristopher O'Malleyenergy_progress
05/17/2023Lighting controlsChristopher O'Malleyenergy_progress
05/17/2023HVAC-R and service water piping design and insulationChristopher O'Malleyenergy_progress
05/17/2023Duct leakage testing, insulation and designChristopher O'Malleyenergy_progress
05/17/2023FinalChristopher O'Malleyprogress
05/17/2023HVAC-R and service water heating system controlsChristopher O'Malleyenergy_progress
05/17/2023Energy Code Compliance InspectionsChristopher O'Malleyprogress
05/12/2023Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
05/12/2023Fire-Resistance Rated ConstructionChristopher O'Malleyprogress
05/12/2023FinalChristopher O'Malleyprogress
05/12/2023Insulation placement and R valuesChristopher O'Malleyenergy_progress
05/12/2023Fenestration and door U-factor and product ratingsChristopher O'Malleyenergy_progress
05/12/2023Fenestration air leakageChristopher O'Malleyenergy_progress
05/12/2023Fenestration areasChristopher O'Malleyenergy_progress
05/12/2023Energy Code Compliance InspectionsChristopher O'Malleyprogress
05/09/2023HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
05/09/2023Lighting controlsChristopher O'Malleyenergy_progress
05/09/2023Exterior lighting powerChristopher O'Malleyenergy_progress
Latest 25 of 123.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
East Brooklyn EatsRestaurant / Food ServiceFloor 1
Project B00813305 Alteration · LOC Issued · 03/21/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 172 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/30/2026B00681260-I1Request digital key ↗
08/30/2026B00681375-I1Request digital key ↗
08/29/2026B00705132-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00794376-I1Open ↗
▸Seals & Professional Certifications132
▸DOB NOWProgress Inspector Seal & Signature64
10/05/2026B00704967-P3Open ↗
10/05/2026B00704967-P3Open ↗
10/05/2026B00704967-P3Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature47
10/05/2026B00704967-P3Open ↗
09/28/2026B00794376-P2Open ↗
09/02/2026B00705132-P1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/30/2026B00681260-I1Open ↗
08/29/2026B00705132-I1Open ↗
08/29/2026B00705132-P1Open ↗
Showing 3 of 21 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B00794376-P1Open ↗
08/13/2026B00794376-I1Open ↗
08/13/2026B00794376-P2Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/30/2026B00681260-I1Open ↗
08/29/2026B00705132-I1Open ↗
08/29/2026B00699213-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis3
08/29/2026B00699213-I1Open ↗
08/13/2026B00794376-I1Open ↗
08/13/2026B00704967-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00704967-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/27/2026B00794376-P2Open ↗
08/27/2026B00794376-P1Open ↗
08/15/2026B00794376-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00794376-I1Open ↗