← Back
BuildNYC
One story - permanent living quarter
616 EAST 52ND STREET
BROOKLYN · BIN 3105352
💬 Discuss this project
1945Year Built
1Stories
A2Building Class
R4Zoning
2,382 sfGross Floor Area
1Units
One story - permanent living quarter · 6,400 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBuilding mounted solar electric generation array installatio1 filing · 13 docs
Floor 11 filing · 16 docs
Basement1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2024$1.2M—— → —$497/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RR&R Associates310/07/2026
Momentum Solar208/06/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MJB Consultants403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV Sia9281208/06/2026
Building Lifecycle
All (50)Filed (5)Permit Issued (1)Signed Off (1)Objection (13)Special Inspection (30)
10/07/2026
Filed — Alteration CO
INSTALL HVAC SYSTEMS IN BASEMENT AND FIRST FLOOR AND VENTILATION SYSTEMS IN THE BATHROOMS.
B01241541-S2
08/13/2026
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, railed, 55 modules, 23.925 KW
B01387100-I1
08/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
08/07/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
08/07/2026
Special inspection requirement — Final
Mina Makar
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
08/06/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 55 modules, 23.925 KW
B01387100-P1
08/06/2026
Special inspection requirement — Final
Mina Makar
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
08/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
08/06/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
04/21/2026
Permit issued — Solar
B01387100-I1-SL
04/16/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 55 modules, 23.925 KW
B01387100-I1
02/27/2026
Special inspection requirement — Air barrier — testing
02/27/2026
Special inspection requirement — Permanent certificate
02/27/2026
Special inspection requirement — Metering
02/27/2026
Special inspection requirement — Fenestration areas
02/27/2026
Special inspection requirement — Protection of exposed foundation insulation
12/07/2025
Objection resolved — Resolved
10/17/2025
Objection resolved — Addressed
09/18/2025
Objection raised — Admin
09/16/2025
Objection raised — Energy
09/07/2025
Filed — Alteration CO
INSTALL HVAC SYSTEMS IN BASEMENT AND FIRST FLOOR AND VENTILATION SYSTEMS IN THE BATHROOMS.
B01241541-S1
09/07/2025
Objection resolved — Addressed
09/07/2025
Objection resolved — Addressed
09/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/24/2025
Objection resolved — Addressed
08/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
08/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
08/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
08/13/2025
Special inspection requirement — Mechanical Systems
08/13/2025
Special inspection requirement — Final
08/07/2025
Objection resolved — Addressed
07/31/2025
Objection raised — Admin
07/30/2025
Objection raised — Other
07/30/2025
Objection raised — Admin
07/30/2025
Objection raised — Zoning
07/30/2025
Objection raised — Admin
07/23/2025
Filed — Alteration CO
INSTALL HVAC SYSTEMS IN BASEMENT AND FIRST FLOOR AND VENTILATION SYSTEMS IN THE BATHROOMS.
B01241541-I1
06/19/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/16/2025
Special inspection requirement — Structural Cold-Formed Steel
06/16/2025
Special inspection requirement — Insulation placement and R values
06/16/2025
Special inspection requirement — Masonry
06/16/2025
Special inspection requirement — Fenestration air leakage
06/16/2025
Special inspection requirement — Subgrade Inspections
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMomentum Solar04/21/2026
1 project · most recent 10/07/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/07/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ventilation
1 project · most recent 10/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/07/2026——Gas, Water/Sanitary
2 projects · most recent 06/03/2026
FiledStatusContractorScope
06/03/2026Permit IssuedAdam Electrical Contrng3 meters, 3 new_meters
04/14/2026CompleteIsland Electric—
1 project · most recent 10/07/2026
Concrete Masonry
FiledStatusContractorScope
10/07/2026——Concrete, Masonry
1 project · most recent 08/06/2026
FiledStatusContractorScope
08/06/2026Signed-offMomentum Solar110 panels, 47.84 kw, 967 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/07/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
08/07/2026Air barrier - visual inspectionMina Makarenergy_progress
08/07/2026Energy Code Compliance InspectionsMina Makarprogress
08/07/2026FinalMina Makarprogress
08/07/2026Fire-Resistant Penetrations and JointsMina Makarspecial
08/06/2026FinalMina Makarprogress
08/06/2026Fire-Resistant Penetrations and JointsMina Makarspecial
08/06/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
08/06/2026Energy Code Compliance InspectionsMina Makarprogress
08/06/2026Air barrier - visual inspectionMina Makarenergy_progress
02/27/2026Air barrier — testing —energy_progress
02/27/2026Permanent certificate—energy_progress
02/27/2026Metering—energy_progress
02/27/2026Fenestration areas—energy_progress
02/27/2026Protection of exposed foundation insulation—energy_progress
09/07/2025Structural Stability – Alterations of existing buildings—special
08/24/2025HVAC-R and service water heating system controls—energy_progress
08/24/2025HVAC-R and service water piping design and insulation—energy_progress
08/24/2025HVAC-R and service water heating equipment—energy_progress
08/13/2025Mechanical Systems—special
08/13/2025Final—progress
06/19/2025Subsurface Investigations (Borings/Test Pits)—special
06/16/2025Fire-Resistant Penetrations and Joints—special
06/16/2025Fenestration and door U-factor and product ratings—energy_progress
06/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
Latest 25 of 37.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01241541-S1Request digital key ↗
08/21/2026B01241541-I1Request digital key ↗
08/21/2026B01241541-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01241541-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01241541-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026B01241541-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01387100-I1Open ↗
08/17/2026B01387100-P1Open ↗
08/13/2026B01241541-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026B01387100-I1Open ↗
08/26/2026B01387100-I1Open ↗
08/23/2026B01387100-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01387100-I1Open ↗
08/23/2026B01387100-P1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01241541-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026B01387100-I1Open ↗
08/17/2026B01387100-P1Open ↗
08/13/2026B01241541-S2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B01241541-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01241541-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026B01387100-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification1
08/13/2026B01241541-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01241541-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01241541-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01241541-I1Open ↗