← Back
BuildNYC
Walk-up cooperative
616 EAST 9TH STREET
MANHATTAN · East Village · BIN 1077482
💬 Discuss this project
1910Year Built
5Stories
C6Building Class
R8BZoning
33,000 sfGross Floor Area
38Units
Rent Stabilized7 Active Violations 5 unresolved · 2 paperwork only ▸
Walk-up cooperative · Owner of record: 614-20 E 9th St HDFC · 9,750 sf lot · 3.38 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof replacement for residential building4p · 1 filing · 20 docs
Floor 5Roof replacement for residential building1p · 1 filing · 20 docs
Floor 4Roof replacement for residential building1p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1
CellarRoof replacement for residential building2p · 1 filing · 20 docs
Site & exteriorSidewalk shed installation9p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
614-20 E 9th St HDFC203/22/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Alnour Consulting207/31/2024
Buck Moorhead Architect306/28/2024
Ashraf107/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code1003/21/2026
Rigid Structural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cattro Consulting GroupGeneral Contractor903/21/2026
Intersystem InstallationScaffold607/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alnour Consulting Engineering607207/31/2024
Building Lifecycle
All (38)Filed (6)Permit Issued (7)Signed Off (2)Violation (7)Objection (2)Special Inspection (14)
04/17/2025
Signed off — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-S1
08/15/2024
Signed off — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-I1
08/08/2024
Objection raised — Scope
08/08/2024
Objection resolved — Addressed
07/31/2024
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-P3
06/28/2024
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-P2
06/06/2024
Special inspection requirement — Final
WILLIAM MOORHEAD
06/06/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Nouredine Benabdelhak
06/06/2024
Special inspection requirement — Structural Steel - Details
Nouredine Benabdelhak
06/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nouredine Benabdelhak
05/29/2024
Special inspection requirement — Insulation placement and R values
WILLIAM MOORHEAD
05/29/2024
Special inspection requirement — Final
WILLIAM MOORHEAD
05/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MOORHEAD
05/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MOORHEAD
05/29/2024
Special inspection requirement — Air barrier - visual inspection
WILLIAM MOORHEAD
04/11/2023
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-P1
04/05/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MOORHEAD
04/05/2023
Special inspection requirement — Air barrier — testing
WILLIAM MOORHEAD
04/05/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MOORHEAD
04/05/2023
Special inspection requirement — Final
WILLIAM MOORHEAD
04/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MOORHEAD
09/28/2022
Permit issued — Sidewalk Shed
M00557630-I1-SH
08/02/2022
Permit issued — General Construction
M00496334-I1-GC
07/13/2022
Permit issued — Sidewalk Shed
M00557630-I1-SH
07/01/2022
Permit issued — Structural
M00496334-S1-ST
01/14/2022
Permit issued — Structural
M00496334-S1-ST
08/09/2021
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-S1
08/04/2021
Permit issued — Sidewalk Shed
M00557630-I1-SH
07/16/2021
Permit issued — Sidewalk Shed
M00557630-I1-SH
07/14/2021
Filed — Alteration
M00557630-I1
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2021
Filed — Alteration
STRUCTURAL RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M00496334-I1
04/16/2021
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
I
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedIntersystem Installation09/28/2022
DOB NOWGeneral ConstructionSigned-offCattro Consulting Group08/02/2022
DOB NOWSidewalk ShedPermit IssuedIntersystem Installation07/13/2022
DOB NOWStructuralSigned-offCattro Consulting Group07/01/2022
DOB NOWStructuralSigned-offCattro Consulting Group01/14/2022
DOB NOWSidewalk ShedPermit IssuedIntersystem Installation08/04/2021
DOB NOWSidewalk ShedPermit IssuedIntersystem Installation07/16/2021
BIS—ISSUEDHand in Hand Construction04/23/1992
3 projects · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025Permit IssuedVere ElectricGeneral Wiring
08/01/2022Permit IssuedTimothy Coleman LicensedGeneral Wiring
05/12/2022CompleteSteven Farkas—
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
06/06/2024FinalWILLIAM MOORHEADprogress
06/06/2024Structural Steel - High Strength BoltingNouredine Benabdelhakspecial
06/06/2024Structural Steel - DetailsNouredine Benabdelhakspecial
06/06/2024Structural Stability – Alterations of existing buildingsNouredine Benabdelhakspecial
05/29/2024Insulation placement and R valuesWILLIAM MOORHEADenergy_progress
05/29/2024FinalWILLIAM MOORHEADprogress
05/29/2024Fire-Resistance Rated ConstructionWILLIAM MOORHEADprogress
05/29/2024Fenestration and door U-factor and product ratingsWILLIAM MOORHEADenergy_progress
05/29/2024Air barrier - visual inspectionWILLIAM MOORHEADenergy_progress
04/05/2023Insulation placement and R valuesWILLIAM MOORHEADenergy_progress
04/05/2023Air barrier — testing WILLIAM MOORHEADenergy_progress
04/05/2023Fenestration and door U-factor and product ratingsWILLIAM MOORHEADenergy_progress
04/05/2023FinalWILLIAM MOORHEADprogress
04/05/2023Fire-Resistance Rated ConstructionWILLIAM MOORHEADprogress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00496334-I1Request digital key ↗
09/03/2026M00496334-P3Request digital key ↗
09/03/2026M00496334-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026M00496334-P2Open ↗
08/29/2026M00496334-P2Open ↗
08/29/2026M00496334-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00496334-P3Open ↗
09/03/2026M00496334-P2Open ↗
09/03/2026M00496334-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026M00496334-P3Open ↗
08/23/2026M00496334-P3Open ↗
08/23/2026M00496334-P3Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026M00496334-P3Open ↗
09/03/2026M00496334-S1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00496334-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00496334-I1Open ↗