← Back
BROOKLYN
617 GRAND AVENUE
BROOKLYN · BIN 3028603
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
5 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 13 docs
Floor 3Under Construction2 filings · 16 docs
Floor 2Under Construction2 filings · 16 docs
Floor 1Under Construction2 filings · 16 docs
CellarUnder Construction2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MTEK308/20/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION307/21/2026
THOMAS C. TUNG, P.E.105/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RONALD STEWARTElectrical103/21/2026
STEWART RONALDElectrical103/21/2026
JEM FIRE PREVENTION INCFire Protection108/20/2026
PRIMROSE SERVICE INCGeneral Contractor107/08/2026
M & M PIPING AND HEATINGPlumbing107/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIMON7555207/21/2026
Building Lifecycle
All (62)Filed (4)Permit Issued (3)Violation (5)Inspection (5)Objection (20)Special Inspection (25)
08/18/2026
Permit issued — Sprinklers
B01390703-S2-EW-SP
08/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/05/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/05/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/28/2026
Permit issued — Plumbing
B01390703-S1-PL
07/22/2026
Objection resolved — Addressed
07/21/2026
Filed — Alteration CO
CONVERT EXISTING MIXED USE (ONE STORE,2-FAMILY) INTO 1 FAMILY ON EXISTING 3- STORY BUILDING.OBTAIN NEW C OF O.
B01390703-S2
07/17/2026
Filed — Alteration CO
CONVERT EXISTING MIXED USE (ONE STORE,2-FAMILY) INTO 1 FAMILY ON EXISTING 3- STORY BUILDING.OBTAIN NEW C OF O.
B01390703-S1
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
07/17/2026
Special inspection requirement — Maintenance information
CALVIN TRAN
07/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
07/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
07/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
07/10/2026
Objection resolved — Resolved
07/09/2026
Objection resolved — Resolved
07/09/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Addressed
05/27/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/26/2026
Objection resolved — Addressed
05/22/2026
Objection raised — Energy
05/22/2026
Objection raised — Other
05/22/2026
Objection raised — Other
05/22/2026
Objection raised — Zoning
05/22/2026
Objection raised — Admin
05/22/2026
Objection raised — Scope
05/22/2026
Objection raised — Scope
05/22/2026
Objection raised — Structural
05/22/2026
Objection raised — Admin
05/22/2026
Objection raised — Admin
05/08/2026
Permit issued — General Construction
B01397317-I1-GC
05/05/2026
Filed — Alteration
INTERIOR DEMOLITION ON EXISTING THREE (3) STORY,TWO (2) FAMILY & (1) COMMERCIAL MIXED USE BUILDING RELATED TO JOB #B01390703-I1. NO EXTERIOR WORK, NO CHANGE OF BUILDING BULK, OCCUPANCY OR EGRESS.
B01397317-I1
05/01/2026
Filed — Alteration CO
CONVERT EXISTING MIXED USE (ONE STORE,2-FAMILY) INTO 1 FAMILY ON EXISTING 3- STORY BUILDING.OBTAIN NEW C OF O.
B01390703-I1
04/27/2026
Special inspection requirement — Fenestration air leakage
04/27/2026
Special inspection requirement — Structural Cold-Formed Steel
04/27/2026
Special inspection requirement — Exterior lighting power
04/27/2026
Special inspection requirement — Lighting in dwelling units
04/27/2026
Special inspection requirement — Fenestration areas
04/27/2026
Special inspection requirement — Insulation placement and R values
04/27/2026
Special inspection requirement — Permanent certificate
04/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/27/2026
Special inspection requirement — Interior lighting power
04/27/2026
Special inspection requirement — Air barrier - visual inspection
04/27/2026
Special inspection requirement — Maintenance information
04/27/2026
Special inspection requirement — Lighting controls
04/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/27/2026
Special inspection requirement — Metering
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/21/2026
Special inspection requirement — Structural Wood Frame
04/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/21/2026
Special inspection requirement — Final
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
05/12/2021
Violation issued (HPD, open)
A
05/12/2021
Violation issued (HPD, open)
A
05/12/2021
Violation issued (HPD, open)
B
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedJEM FIRE PREVENTION INC08/18/2026
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING07/28/2026
DOB NOWGeneral ConstructionPermit IssuedPRIMROSE SERVICE INC05/08/2026
BISMHISSUEDSTAR HOMES DESIGN & MGMT04/29/2002
1 project · most recent 07/21/2026
Sprinkler System
FiledStatusContractorScope
07/21/2026Permit IssuedJEM FIRE PREVENTION INCSprinkler System
1 project · most recent 07/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/21/2026Permit IssuedM & M PIPING AND HEATINGGas, Water/Sanitary
1 project · most recent 01/23/2020
FiledStatusContractorScope
01/23/2020CompleteALL BORO ELECTRIC CORP—
1 project · most recent 07/21/2026
Wood
FiledStatusContractorScope
07/21/2026Permit IssuedJEM FIRE PREVENTION INCWood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/05/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
07/17/2026Energy Code Compliance InspectionsCALVIN TRANprogress
07/17/2026Fire-Resistant Penetrations and JointsSIMON JIANGspecial
07/17/2026Maintenance informationCALVIN TRANenergy_progress
07/17/2026HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
07/17/2026HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
07/17/2026HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
04/27/2026Fenestration air leakage—energy_progress
04/27/2026Structural Cold-Formed Steel—special
04/27/2026Exterior lighting power—energy_progress
04/27/2026Lighting in dwelling units—energy_progress
04/27/2026Fenestration areas—energy_progress
04/27/2026Insulation placement and R values—energy_progress
04/27/2026Permanent certificate—energy_progress
04/27/2026Fire-Resistance Rated Construction—progress
04/27/2026Interior lighting power—energy_progress
04/27/2026Air barrier - visual inspection—energy_progress
04/27/2026Maintenance information—energy_progress
04/27/2026Lighting controls—energy_progress
04/27/2026Fenestration and door U-factor and product ratings—energy_progress
04/27/2026Metering—energy_progress
04/21/2026Fire-Resistant Penetrations and Joints—special
04/21/2026Structural Wood Frame—progress
04/21/2026Structural Stability – Alterations of existing buildings—special
04/21/2026Final—progress
04/21/2026Energy Code Compliance Inspections—progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026B01397317-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01390703-S1Open ↗
08/24/2026B01390703-S1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026B01397317-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B01390703-S1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01397317-I1Open ↗