← Back
Three families
619 41 STREET
BROOKLYN · BIN 3018058
💬 Discuss this project
1915Year Built
2Stories
C0Building Class
R6BZoning
2,422 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,504 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 22p · 2 filings · 18 docs
Floor 12p · 2 filings · 18 docs
Cellar2p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/28/2025$1.6M—Private party → Private party$652/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI609/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor104/08/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394309/16/2025
Building Lifecycle
All (30)Filed (6)Permit Issued (2)Signed Off (2)Violation (7)Inspection (4)Special Inspection (9)
11/05/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER AND COMBI.BOILERS IN CELLAR; REPLACE YARD DRAIN AT REAR YARD. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01224441-I1
09/24/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01224440-I1
09/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/16/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01224440-P2
09/16/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER AND COMBI.BOILERS IN CELLAR; REPLACE YARD DRAIN AT REAR YARD. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01224441-P2
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/10/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/03/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01224440-P1
07/03/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER AND COMBI.BOILERS IN CELLAR; REPLACE YARD DRAIN AT REAR YARD. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01224441-P1
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/03/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/23/2025
Permit issued — Plumbing
B01224441-I1-PL
05/16/2025
Permit issued — General Construction
B01224440-I1-GC
05/14/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER AND COMBI.BOILERS IN CELLAR; REPLACE YARD DRAIN AT REAR YARD. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01224441-I1
05/14/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01224440-I1
03/20/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
10/28/2019
Violation issued (HPD, closed)
I
11/16/2017
Violation issued (HPD, closed)
I
11/02/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
07/05/1983
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L PLUMBING INC05/23/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC05/16/2025
1 project · most recent 06/03/2025
General Wiring
FiledStatusContractorScope
06/03/2025CompleteERIC & NG ELEC'L, INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/10/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/16/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/16/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/16/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
09/16/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/16/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/16/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/03/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/03/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/03/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01224440-P2Request digital key ↗
08/21/2026B01224440-P1Request digital key ↗
08/21/2026B01224440-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01224440-P2Open ↗
08/21/2026B01224440-P1Open ↗
08/21/2026B01224440-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B01224440-P2Open ↗
08/26/2026B01224440-P1Open ↗
08/22/2026B01224440-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01224440-P2Open ↗
08/26/2026B01224440-P1Open ↗
08/22/2026B01224440-I1Open ↗