← Back
BuildNYC
Primarily 5-6 family with 1 store or office
619 9TH AVENUE
MANHATTAN · BIN 1026368
💬 Discuss this project
1910Year Built
4Stories
S5Building Class
R8Zoning
—Gross Floor Area
7Units
1 Active Violation ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 619 9th Avenue · 2.56 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 5Walgreens1p · 1 filing · 8 docs
Floor 4Walgreens1p · 1 filing · 8 docs
Floor 3Walgreens1p · 1 filing · 8 docs
Floor 2Walgreens1p · 1 filing · 8 docs
Floor 1WalgreensUnder Construction1p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
619 9th Avenue1210/13/2026
Stal-Mark Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Clip Architects208/28/2026
Jose L. Pena, P.E107/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mercury Building AssociatesGeneral Contractor110/04/2026
Signstar NYCSign hanger107/08/2026
RRP PlumbingPlumbing109/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM Engineering Services8449108/28/2026
NKM Engineering6244108/28/2026
Building Lifecycle
All (31)Filed (3)Permit Issued (3)Signed Off (1)Violation (16)Special Inspection (8)
09/14/2026
Permit issued — Plumbing
M01449886-S1-PL
09/03/2026
Permit issued — General Construction
M01449886-I1-GC
08/28/2026
Filed — Alteration
TENANT FIX OUT FOR EXISTING COMMERCIAL SPACE WITH PLUMBING WORK ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01449886-I1
08/28/2026
Filed — Alteration
TENANT FIX OUT FOR EXISTING COMMERCIAL SPACE WITH PLUMBING WORK ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01449886-S1
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
MOHAMED MAHMOUD
08/25/2026
Special inspection requirement — Lighting controls
Jaeyoung Jang
08/25/2026
Special inspection requirement — Interior lighting power
Jaeyoung Jang
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
08/25/2026
Special inspection requirement — Final
Jaeyoung Jang
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/29/2026
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
I
06/04/2025
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
09/13/2019
Signed off — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - DUANE READE BY WALGREENS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00185010-I1
07/19/2019
Permit issued — Sign
M00185010-I1-SG
07/09/2019
Filed — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - DUANE READE BY WALGREENS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00185010-I1
06/25/2019
Special inspection requirement — Final
Jose Pena
06/20/2019
Violation issued (HPD, open)
B
12/21/2018
Violation issued (ECB, closed)
Construction
12/01/2018
Violation issued (ECB, closed)
Construction
01/18/2018
Violation issued (ECB, closed)
Construction
11/06/2017
Violation issued (HPD, closed)
I
10/24/2016
Violation issued (HPD, closed)
I
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/08/1994
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRRP Plumbing09/14/2026
DOB NOWGeneral ConstructionPermit IssuedMercury Building Associates09/03/2026
DOB NOWSignSigned-offSignstar NYC07/19/2019
BISBLISSUEDBissetta & List03/20/1996
BISPLISSUEDBissetta & List03/20/1996
1 project · most recent 08/28/2026
Water/Sanitary
FiledStatusContractorScope
08/28/2026Permit IssuedRRP PlumbingWater/Sanitary
1 project · most recent 06/19/2018
General Wiring Lighting
FiledStatusContractorScope
06/19/2018Permit IssuedY.S. ElectricGeneral Wiring, Lighting
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/26/2026Tenant Protection Plan ComplianceNARESH MAHANGUspecial
08/26/2026Tenant Protection Plan ComplianceMOHAMED MAHMOUDspecial
08/25/2026Lighting controlsJaeyoung Jangenergy_progress
08/25/2026Interior lighting powerJaeyoung Jangenergy_progress
08/25/2026Energy Code Compliance InspectionsJaeyoung Jangprogress
08/25/2026FinalJaeyoung Jangprogress
08/25/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/25/2019FinalJose Penaprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
WalgreensRetailFloors 1–5
Project M00185010 Alteration · LOC Issued · 07/09/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
10/13/2026M01449886-I1Request digital key ↗
10/13/2026M01449886-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00185010-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWHPD Certification Letter or CPC Special Permit1
09/16/2026M01449886-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/16/2026M01449886-I1Open ↗
09/16/2026M01449886-S1Open ↗
08/13/2026M00185010-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026M00185010-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist3
09/16/2026M01449886-I1Open ↗
09/16/2026M01449886-S1Open ↗
08/13/2026M00185010-I1Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00185010-I1Open ↗
▸DOB NOWCertificate of No Harassment1
09/16/2026M01449886-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/16/2026M01449886-I1Open ↗
09/16/2026M01449886-S1Open ↗
08/13/2026M00185010-I1Open ↗
▸Other Documents2
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026M00185010-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026M00185010-I1Open ↗