← Back
Two family converted from one family
61A SOUTH ELLIOTT PLACE
BROOKLYN · Fort Greene · BIN 3058780
💬 Discuss this project
1885Year Built
3Stories
B3Building Class
R6BZoning
3,080 sfGross Floor Area
2Units
Two family converted from one family · 1,592 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 2 filings · 20 docs
Floor 32p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MORRIS ADJMI ARCHITECTS807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/08/2024$3.3M—Private party → Private party$1,071/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MORRIS ADJMI ARCHITECTS409/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MBE CODE & ZONING LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERBORO PROPERTY MGMTGeneral Contractor107/08/2026
QWEST CONTRACTING CORPGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID TURNER ARCHITECT PC3829209/22/2025
Building Lifecycle
All (20)Filed (4)Permit Issued (3)Signed Off (2)Inspection (3)Special Inspection (8)
09/24/2025
Signed off — Alteration
Interior renovation to revert units to their original state. No change in use, egress or occupancy.
B01067576-I1
09/24/2025
Signed off — Alteration
Modification to the existing Plumbing fixtures.
B01070273-I1
09/24/2025
Special inspection requirement — Mechanical Systems
DAVID TURNER
09/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Morris Adjmi
09/24/2025
Special inspection requirement — Final
Morris Adjmi
09/24/2025
Special inspection requirement — Interior lighting power
Morris Adjmi
09/22/2025
Filed — Alteration
Interior renovation to revert units to their original state. No change in use, egress or occupancy.
B01067576-P1
09/18/2025
Special inspection requirement — Mechanical Systems
DAVID TURNER
09/18/2025
Special inspection requirement — Final
Morris Adjmi
09/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Morris Adjmi
09/18/2025
Special inspection requirement — Interior lighting power
Morris Adjmi
05/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/07/2025
Filed — Alteration
Modification to the existing Plumbing fixtures.
B01070273-P1
12/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2024
Permit issued — Plumbing
B01070273-I1-PL
09/10/2024
Permit issued — Mechanical Systems
B01067576-I1-GC-CX
07/11/2024
Permit issued — Mechanical Systems
B01067576-I1-GC-CX
06/28/2024
Filed — Alteration
Interior renovation to revert units to their original state. No change in use, egress or occupancy.
B01067576-I1
06/28/2024
Filed — Alteration
Modification to the existing Plumbing fixtures.
B01070273-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC09/12/2024
DOB NOWMechanical SystemsSigned-offINTERBORO PROPERTY MGMT09/10/2024
DOB NOWMechanical SystemsSigned-offQWEST CONTRACTING CORP07/11/2024
1 project · most recent 07/23/2025
General Wiring
FiledStatusContractorScope
07/23/2025CompleteRIGID ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/24/2025Mechanical SystemsDAVID TURNERspecial
09/24/2025Fire-Resistance Rated ConstructionMorris Adjmiprogress
09/24/2025FinalMorris Adjmiprogress
09/24/2025Interior lighting powerMorris Adjmienergy_progress
09/18/2025Mechanical SystemsDAVID TURNERspecial
09/18/2025FinalMorris Adjmiprogress
09/18/2025Fire-Resistance Rated ConstructionMorris Adjmiprogress
09/18/2025Interior lighting powerMorris Adjmienergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01067576-P1Request digital key ↗
08/24/2026B01067576-I1Request digital key ↗
08/21/2026B01070273-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B01067576-I1Open ↗
08/13/2026B01070273-I1Open ↗
08/13/2026B01070273-P1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01067576-P1Open ↗
08/24/2026B01067576-I1Open ↗
08/21/2026B01070273-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026B01067576-P1Open ↗
08/28/2026B01067576-P1Open ↗
08/23/2026B01067576-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01067576-P1Open ↗
08/23/2026B01067576-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01067576-I1Open ↗
08/24/2026B01067576-P1Open ↗
08/21/2026B01070273-P1Open ↗
Showing 3 of 4 on file for this type