← Back
Office only, 2-6 stories
62-07 WOODSIDE AVENUE
QUEENS · Woodside · BIN 4307300
💬 Discuss this project
1987Year Built
4Stories
O2Building Class
R6Zoning
11,600 sfGross Floor Area
7Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: 211 PROPERTY LLC · 2,923 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 10 docs
Cellar5p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
211 PROPERTY1407/08/2026
KINGSVILLE REALTY LLC503/22/2026
KOENIG PROPERTIES303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2015$4.1M—KOENIG PROPERTIES, INC. → 211 PROPERTY LLC$353/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
APT ENGINEERING301/03/2025
RAYMOND IRRERA + ASSOCIATES ARCHITE111/08/2024
JAMES J. LEONARD, ARCHITECT103/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES303/21/2026
JAMES J. LEONARD, ARCHITECT, PLLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEL TECH ELECTRIC INCGeneral Contractor404/09/2026
VERTICAL SOLUTIONS INCGeneral Contractor203/21/2026
E.T. VANDERBECK INCGeneral Contractor107/08/2026
ZAQ CONSTRUCTION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842301/03/2025
Building Lifecycle
All (49)Filed (5)Permit Issued (5)Signed Off (1)Violation (15)Inspection (3)Objection (20)
03/24/2026
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
03/10/2026
Permit issued — Antenna
Q00609962-I1-AN
03/06/2026
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
03/06/2025
Permit issued — Antenna
Q00609962-I1-AN
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/06/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/07/2025
Objection raised — Zoning
01/07/2025
Objection raised — Scope
01/03/2025
Filed — Alteration
Modification to existing Verizon site. Replace 6 RRH units and replace the existing equipment platform including 2 new equipment cabinets and the relocation of 1 equipment cabinet on the roof. Replace 6 antennas, install 2 GPS units. Replace ships ladder
Q00609962-P1
11/21/2024
Objection resolved — Addressed
11/18/2024
Objection raised — Other
11/08/2024
Filed — Alteration CO
Application is to amend C of O with updated Board of Standards and Appeals new determination.
Q00992496-P1
10/01/2024
Violation issued (ECB, open)
Construction
08/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2024
Permit issued — General Construction
Q00992496-I1-GC
03/27/2024
Filed — Alteration CO
Application is to amend C of O with updated Board of Standards and Appeals new determination.
Q00992496-I1
03/14/2022
Permit issued — Antenna
Q00609962-I1-AN
12/14/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
12/14/2021
Objection resolved — Addressed
12/14/2021
Objection raised — 2014-AN BC 501.3-Building Code
12/14/2021
Objection resolved — Addressed
12/10/2021
Filed — Alteration
Modification to existing Verizon site. Replace 6 RRH units and replace the existing equipment platform including 2 new equipment cabinets and the relocation of 1 equipment cabinet on the roof. Replace 6 antennas, install 2 GPS units. Replace ships ladder
Q00609962-I1
09/17/2020
Signed off — Alteration
Installation of a new VERIZON telecommunications site. Installing 3 new antenna sectors (9 antennas and 12 related RRH units), installing 2 GPS units, and installing an equipment cabinet on a new equipment platform. All work is in conformance with TPPN#5/98. There is no change in use, egress, or occupancy.
Q00164975-I1
09/18/2019
Permit issued — Antenna
Q00164975-I1-AN
07/02/2019
Objection raised — 2014-AN AC 28-104.7.1-Administ
07/02/2019
Objection resolved — Addressed
07/02/2019
Objection raised — 2014-AN AC 28-104.7-Building C
07/02/2019
Objection resolved — Addressed
07/02/2019
Objection raised — 2014-AN AC 28-104.7.1-Administ
07/02/2019
Objection resolved — Addressed
07/02/2019
Objection raised — 2014-AN AC 28-104.11-Building
07/02/2019
Objection resolved — Addressed
07/02/2019
Objection raised — 2014-AN AC 28-104.11-Building
07/02/2019
Objection resolved — Addressed
07/01/2019
Filed — Alteration
Installation of a new VERIZON telecommunications site. Installing 3 new antenna sectors (9 antennas and 12 related RRH units), installing 2 GPS units, and installing an equipment cabinet on a new equipment platform. All work is in conformance with TPPN#5/98. There is no change in use, egress, or occupancy.
Q00164975-I1
05/23/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/04/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/23/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/17/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/02/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/29/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/11/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/09/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/04/1994
Violation issued (ECB, closed)
Construction
03/16/1989
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedCEL TECH ELECTRIC INC03/10/2026
DOB NOWAntennaPermit IssuedCEL TECH ELECTRIC INC03/06/2025
DOB NOWGeneral ConstructionPermit IssuedZAQ CONSTRUCTION INC06/03/2024
DOB NOWAntennaPermit IssuedE.T. VANDERBECK INC03/14/2022
DOB NOWAntennaSigned-offVERTICAL SOLUTIONS INC09/18/2019
BISPLISSUEDA.M.N. CORPORATION04/29/2003
BISOTISSUEDBURDA CONSTRUCTION CORP04/16/2003
1 project · most recent 06/20/2019
General Wiring
FiledStatusContractorScope
06/20/2019CompleteJ.A. LEE ELEC SVCS LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/24/2026Pass-Final Construction Permit WithdrawalPassView ↗
03/06/2026Fail-Final Construction Permit WithdrawalFailView ↗
08/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/21/2026Q00992496-I1Request digital key ↗
08/21/2026Q00609962-P1Request digital key ↗
08/21/2026Q00609962-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/14/2026Q00164975-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00992496-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026Q00164975-I1Open ↗
08/21/2026Q00609962-P1Open ↗
08/21/2026Q00609962-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00992496-I1Open ↗
08/13/2026Q00992496-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q00609962-I1Open ↗
08/21/2026Q00609962-P1Open ↗
08/14/2026Q00164975-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/13/2026Q00992496-I1Open ↗
08/13/2026Q00992496-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00992496-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026Q00992496-I1Open ↗