← Back
Two family frame
62-10 HILLMEYER ROAD
QUEENS · BIN 4617826
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R4-1Zoning
2,281 sfGross Floor Area
2Units
Two family frame · 3,179 sf lot · 0.72 FAR built · Flood zone AE
Locations of Work
MechanicalFire ProtectionGeneral
Floor 21p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
1 job · most recent 06/22/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2022Permit IssuedCHAIT BUILDERS INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Emerson Quiet Kool 12,000 BTU ×8
Heating
Navien NCB-E 240e 94,000 BTU · Boiler ×1
Ventilation
Whisperline FV-0510VS1 50 CFM · Exhaust Fan ×2
FV-10NLF1 100 CFM · Kitchen Exhaust ×2
1 job · most recent 12/11/2023
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
12/11/2023Signed-offD & G PLUMBING CO. INCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 job · most recent 07/21/2023
General Wiring
FiledStatusContractorScope
07/21/2023CompletePURCELL ELEC'L CONTRS LTDGeneral Wiring
1 job · most recent 06/22/2022
Concrete Wood
FiledStatusContractorScope
06/22/2022Permit IssuedCHAIT BUILDERS INCConcrete, Wood
Building Lifecycle
All (62)Filed (6)Permit Issued (4)Inspection (8)Objection (14)Special Inspection (30)
12/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/27/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/21/2023
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
PAUL MARINO
12/21/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
PAUL MARINO
12/21/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
12/21/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
12/11/2023
Filed — Alteration
Installation of plumbing fixtures and sprinkler system take-off for new 2-family dwelling
Q00692496-P2
12/11/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
12/11/2023
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
PAUL MARINO
12/11/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
PAUL MARINO
12/11/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
11/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/24/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/20/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/16/2023
Permit issued — Plumbing
Q00692496-I1-PL
04/27/2023
Permit issued — Mechanical Systems
Q00691103-I1-GC-CX
03/11/2023
Permit issued — Construction Fence
Q00688532-I1-FN
03/10/2023
Permit issued — Curb Cut
Q00687615-I1-CC
02/16/2023
Filed — Alteration
Installation of plumbing fixtures and sprinkler system take-off for new 2-family dwelling
Q00692496-P1
02/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
02/10/2023
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
PAUL MARINO
02/10/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
02/10/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
02/10/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
PAUL MARINO
07/01/2022
Objection raised — Fire_Protection
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Scope
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Zoning
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Zoning
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Energy
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Scope
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Structural
07/01/2022
Objection resolved — Addressed
06/27/2022
Filed — Alteration
Installation of plumbing fixtures and sprinkler system take-off for new 2-family dwelling
Q00692496-I1
06/22/2022
Filed — New Building
PROPOSED NEW 2-FAMILY DWELLING
Q00691103-I1
04/14/2022
Filed — Alteration
Q00688532-I1
04/14/2022
Filed — Alteration
Q00687615-I1
04/14/2022
Special inspection requirement — Wood – Prefabricated I-Joists
PAUL MARINO
03/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
03/03/2022
Special inspection requirement — Air barrier — testing
PAUL MARINO
03/03/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
03/03/2022
Special inspection requirement — Insulation placement and R values
PAUL MARINO
03/03/2022
Special inspection requirement — Metering
PAUL MARINO
03/03/2022
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
03/03/2022
Special inspection requirement — Interior lighting power
PAUL MARINO
03/03/2022
Special inspection requirement — Fenestration areas
PAUL MARINO
03/03/2022
Special inspection requirement — Duct leakage testing, insulation and design
PAUL MARINO
03/03/2022
Special inspection requirement — Maintenance information
PAUL MARINO
03/03/2022
Special inspection requirement — Permanent certificate
PAUL MARINO
03/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
Latest 60 of 62 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHAIT BUILDERS1907/08/2026
DSC PROPERTIES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2024$820K—DSC PROPERTIES, INC. → Private party$359/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
T.F. CUSANELLI & FILLETTI ARCH612/11/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D & G PLUMBING CO. INCPlumbing607/08/2026
CHAIT BUILDERS INCGeneral Contractor507/08/2026
D G PLUMBINGGeneral Contractor203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050412/11/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offD & G PLUMBING CO. INC08/16/2023
DOB NOWMechanical SystemsPermit IssuedCHAIT BUILDERS INC04/27/2023
DOB NOWConstruction FencePermit IssuedCHAIT BUILDERS INC03/11/2023
DOB NOWCurb CutSigned-offCHAIT BUILDERS INC03/10/2023
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/27/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/24/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/20/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
12/21/2023On-Site Private Sewage Disposal Systems InstallationPAUL MARINOspecial
12/21/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPAUL MARINOspecial
12/21/2023Energy Code Compliance InspectionsPAUL MARINOprogress
12/21/2023Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
12/21/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
12/11/2023Energy Code Compliance InspectionsPAUL MARINOprogress
12/11/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
12/11/2023On-Site Private Sewage Disposal Systems InstallationPAUL MARINOspecial
12/11/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPAUL MARINOspecial
12/11/2023Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
02/10/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
02/10/2023On-Site Private Sewage Disposal Systems InstallationPAUL MARINOspecial
02/10/2023Energy Code Compliance InspectionsPAUL MARINOprogress
02/10/2023Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
02/10/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPAUL MARINOspecial
04/14/2022Wood – Prefabricated I-JoistsPAUL MARINOspecial
03/03/2022HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
03/03/2022Air barrier — testing PAUL MARINOenergy_progress
03/03/2022Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
03/03/2022Insulation placement and R valuesPAUL MARINOenergy_progress
03/03/2022MeteringPAUL MARINOenergy_progress
03/03/2022Air barrier - visual inspectionPAUL MARINOenergy_progress
03/03/2022Interior lighting powerPAUL MARINOenergy_progress
03/03/2022Fenestration areasPAUL MARINOenergy_progress
03/03/2022Duct leakage testing, insulation and designPAUL MARINOenergy_progress
Latest 25 of 47.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00687615-I1Request digital key ↗
08/26/2026Q00688532-I1Request digital key ↗
08/26/2026Q00692496-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026Q00691103-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00691103-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00691103-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026Q00692496-P2Open ↗
09/01/2026Q00692496-P1Open ↗
08/29/2026Q00691103-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026Q00692496-P2Open ↗
09/01/2026Q00692496-P2Open ↗
09/01/2026Q00692496-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00687615-I1Open ↗
08/26/2026Q00691103-I1Open ↗
08/26/2026Q00692496-P2Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00691103-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00691103-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00691103-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00691103-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00691103-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/13/2026Q00692496-I1Open ↗
08/13/2026Q00692496-P2Open ↗
08/13/2026Q00691103-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00692496-I1Open ↗
08/13/2026Q00691103-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026Q00691103-I1Open ↗
▸Other Documents5
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00691103-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q00691103-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00691103-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00691103-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00691103-I1Open ↗