DOB10/21/1993VH-VIOLATION HAZARDOUS - ACTIVE
DOB12/16/1992V-DOB VIOLATION - ACTIVE
ECB01/15/1993FAILURE TO PROVIDE ADEQUATE FENCE AT THE PERIMETER OF AN EXCAVATION TOPROTECT THE PUBLIC FROM THE HAZARDS OF THE SITE. INCOMPLETE FENCE DOESNOT EXTEND THE FULL LENGHT OF SITE ON HARMAN ST. SIDE LEAVING APPROX.Nothing owed — awaiting certificate of correction
ECB03/10/1992FAILURE TO PROVIDE ADEQUATE VERTICAL SUPPORT OF THE ADJOINING STRUCTURES POSTED AS 62-38 AND 62-42 FOREST AVE, IN THAT THE UNDERPINNING OF THESE EXISTING FOUNDATINS HAS BEEN COMPLETED BEFORE THE COMMENCEMENT OFNothing owed — awaiting certificate of correction
ECB03/10/1992DEPARTMENT OF TRANSPORTATION PERMIT FOR STREET & SIDE WALK NOT POST:ATTIME OF INSPECTION SIDEWALK REAR OF LOT ON HARMAN ST. HAS STOCK OF CLINDERS BLOCK STORE ON IT. NO PERMIT POST FOR STORAGE OF MATERIAL. REMEDNothing owed — awaiting certificate of correction
ECB03/10/1992FAILURE TO PROVIDE APPROVED PLANS AT PREMISES:AT TIME OF INSPECTION CONSTRUCTION WORK OCCURING;LAY OF CYLINDER BLOCK ON NEW FOOTING, UNDER PINNING OF AJOINING PREMISES POST AS 62-38 AND 62-42 FOREST AVE HAS NONothing owed — awaiting certificate of correction
ECB03/10/1992FAILURE TO PROVIDE CONTRACTOR SIGN:AT TIME OF INSPECTION NO CONTRACTORSIGN ON SITE OR POSTED. REMEDY:PROVIDE CONTRACTOR SIGN TO CODE AS PER BLDG CODE& AS INDICATED.Nothing owed — awaiting certificate of correction
ECB03/10/1992FAILRUE TO PROVIDE AN ADEQUATE FENCE AT THE PERIMETER OF AN EXCAVATIONTO PROTECT THE PUBLIC FROM THE HAZARDS OF THE SITE. FENCE NOT COMPLETED IN THAT IT DOES NOT EXTEND THE FULL LENGTH OF THE SITE ON THE HARMANNothing owed — awaiting certificate of correction
ECB03/10/1992WORK WITHOUT PERMIT:AT TIME OF INSPECTION CONSTRUCTION WAS OCCURING INTHAT THEY WERE LAYING CYLINDER BLOCK ON FOOTING OF FOUNDATION SEARCH OF DEPARTMENT RECORDS SHOW NO PERMIT WAS ISSUED FOR WORK. "ALSO FENCE ENothing owed — awaiting certificate of correction