← Back
Large suburban residence
62-41 CROMWELL CRESCENT
QUEENS · BIN 4073579
💬 Discuss this project
1940Year Built
2.5Stories
A3Building Class
R3-1Zoning
3,226 sfGross Floor Area
1Units
0 Open Violations
Large suburban residence · 5,559 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Roof1p · 1 filing · 6 docs
Floor 227p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Cellar25p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EMPIRE BUILDERS GROUP NY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2023$1.3M—Private party → Private party$406/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EAST + WEST ARCHITECTURE PC1208/03/2026
M-CON ENGINEERING, PC112/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XUX CONSULTING2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE BUILDERS GROUP NYGeneral Contractor704/09/2026
SUSTAINABLE STRATEGIESGeneral Contractor203/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373408/03/2026
SJS INSPECTIONS AND CONSU8286508/03/2026
EAST+WEST ARCHITECTURE, P3269612/18/2025
M-CON ENGINEERING7341112/20/2024
Building Lifecycle
All (80)Filed (13)Permit Issued (9)Signed Off (4)Violation (4)Inspection (8)Objection (12)Special Inspection (30)
08/03/2026
Filed — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-A1
07/29/2026
Special inspection requirement — Air barrier - visual inspection
BARBARA HESS
07/29/2026
Special inspection requirement — Maintenance information
BARBARA HESS
07/29/2026
Special inspection requirement — Footing and Foundation
BARBARA HESS
07/29/2026
Special inspection requirement — Fenestration areas
BARBARA HESS
07/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
BARBARA HESS
07/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
BARBARA HESS
07/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
07/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
BARBARA HESS
07/29/2026
Special inspection requirement — Permanent certificate
BARBARA HESS
07/29/2026
Special inspection requirement — Fenestration air leakage
BARBARA HESS
07/29/2026
Special inspection requirement — Air barrier — testing
BARBARA HESS
07/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
BARBARA HESS
07/29/2026
Special inspection requirement — Insulation placement and R values
BARBARA HESS
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BARBARA HESS
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
07/29/2026
Special inspection requirement — Mechanical Systems
KY FU
07/29/2026
Special inspection requirement — Energy Code Compliance Inspections
BARBARA HESS
07/29/2026
Special inspection requirement — Final
BARBARA HESS
07/29/2026
Special inspection requirement — Structural Wood Frame
BARBARA HESS
07/29/2026
Special inspection requirement — Ventilation and air distribution system
BARBARA HESS
07/29/2026
Special inspection requirement — Interior lighting power
BARBARA HESS
07/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
BARBARA HESS
06/16/2026
Filed — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-P9
05/23/2026
Special inspection requirement — Final
BARBARA HESS
05/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
05/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
BARBARA HESS
05/23/2026
Special inspection requirement — Footing and Foundation
BARBARA HESS
05/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
05/23/2026
Special inspection requirement — Mechanical Systems
KY FU
05/23/2026
Special inspection requirement — Energy Code Compliance Inspections
BARBARA HESS
05/23/2026
Special inspection requirement — Structural Wood Frame
BARBARA HESS
04/01/2026
Violation issued (ECB, closed)
Construction
03/17/2026
Signed off — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-S1
03/17/2026
Signed off — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-S3
03/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/06/2026
Signed off — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-S2
01/06/2026
Permit issued — Earth Work
Q00915930-I1-GC-CX
12/18/2025
Filed — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-P8
12/17/2025
Objection resolved — Addressed
12/09/2025
Objection raised — Zoning
11/12/2025
Objection resolved — Addressed
10/29/2025
Violation issued (ECB, closed)
Plumbing
10/29/2025
Violation issued (ECB, closed)
Construction
08/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/04/2025
Objection raised — Cost
07/28/2025
Objection resolved — Addressed
07/23/2025
Objection raised — Other
07/14/2025
Filed — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-P5
07/09/2025
Filed — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-P6
05/08/2025
Filed — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-P2
04/25/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01158413-I1
04/23/2025
Filed — Alteration CO
PROPOSED CURB CUT AS PER MARK; APPLICATION FILED IN CONJUNCTION WITH DOB NOW BUILD #Q00915930-I1
Q00915930-P4
03/14/2025
Permit issued — Plumbing
Q00915930-S1-PL
12/27/2024
Permit issued — Structural
Q00915930-I1-GC-CX
12/27/2024
Permit issued — Construction Fence
Q00915930-S2-FN
12/26/2024
Permit issued — Solar
Q01158413-I1-SL
12/20/2024
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01158413-I1
10/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedEMPIRE BUILDERS GROUP NY01/06/2026
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP03/14/2025
DOB NOWStructuralPermit IssuedEMPIRE BUILDERS GROUP NY12/27/2024
DOB NOWConstruction FenceSigned-offEMPIRE BUILDERS GROUP NY12/27/2024
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES12/26/2024
DOB NOWPlumbingSigned-offN AND S PLUMBING INC03/06/2024
DOB NOWMechanical SystemsPermit IssuedEMPIRE BUILDERS GROUP NY01/03/2024
DOB NOWConstruction FenceSigned-offEMPIRE BUILDERS GROUP NY12/29/2023
DOB NOWCurb CutSigned-offEMPIRE BUILDERS GROUP NY12/29/2023
1 project · most recent 08/03/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026Permit IssuedEMPIRE BUILDERS GROUP NYHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-4C36NA4 42,000 BTU · Vrf Outdoor ×40
MXZ-SM36NAM 42,000 BTU · Vrf Outdoor ×8
MXZ-SM48NAM 54,000 BTU · Vrf Outdoor ×8
Ventilation
Trade-Wind VSL4366RC 600 CFM · Exhaust Fan ×6
Broan BHFLED110 110 CFM · Exhaust Fan ×12
1 project · most recent 08/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/03/2026Signed-offDPH PLUMBING & HTG CORPGas, Water/Sanitary
3 projects · most recent 04/16/2026
General Wiring
FiledStatusContractorScope
04/16/2026CompleteJOE ELECTRICAL INCGeneral Wiring
08/01/2025CompleteJOE ELECTRICAL INCGeneral Wiring
03/24/2025CompleteSOURCE ELECTRIC INC1 meters
1 project · most recent 08/03/2026
Concrete Wood
FiledStatusContractorScope
08/03/2026Permit IssuedEMPIRE BUILDERS GROUP NYConcrete, Wood
1 project · most recent 08/03/2026
Fence
FiledStatusContractorScope
08/03/2026Permit IssuedEMPIRE BUILDERS GROUP NYFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
08/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/11/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 136
DateRequirementInspectorRole
07/29/2026Structural Wood FrameBARBARA HESSprogress
07/29/2026Fire-Resistant Penetrations and JointsKY FUspecial
07/29/2026Mechanical SystemsKY FUspecial
07/29/2026Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
07/29/2026Energy Code Compliance InspectionsBARBARA HESSprogress
07/29/2026FinalBARBARA HESSprogress
07/29/2026Fire-Resistance Rated ConstructionBARBARA HESSprogress
07/29/2026Footing and FoundationBARBARA HESSprogress
07/29/2026Ventilation and air distribution systemBARBARA HESSenergy_progress
07/29/2026Permanent certificateBARBARA HESSenergy_progress
07/29/2026Interior lighting powerBARBARA HESSenergy_progress
07/29/2026Duct leakage testing, insulation and designBARBARA HESSenergy_progress
07/29/2026Fenestration air leakageBARBARA HESSenergy_progress
07/29/2026Fenestration areasBARBARA HESSenergy_progress
07/29/2026Air barrier - visual inspectionBARBARA HESSenergy_progress
07/29/2026Maintenance informationBARBARA HESSenergy_progress
07/29/2026HVAC-R and service water heating equipmentBARBARA HESSenergy_progress
07/29/2026Air barrier — testing BARBARA HESSenergy_progress
07/29/2026HVAC-R and service water piping design and insulationBARBARA HESSenergy_progress
07/29/2026Insulation placement and R valuesBARBARA HESSenergy_progress
07/29/2026Fenestration and door U-factor and product ratingsBARBARA HESSenergy_progress
07/29/2026HVAC-R and service water heating system controlsBARBARA HESSenergy_progress
05/23/2026Interior lighting powerBARBARA HESSenergy_progress
05/23/2026HVAC-R and service water heating equipmentBARBARA HESSenergy_progress
05/23/2026Fenestration and door U-factor and product ratingsBARBARA HESSenergy_progress
Latest 25 of 136.
▾Documents — 216 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/21/2026Q01158413-I1Request digital key ↗
08/20/2026Q00915930-A1Request digital key ↗
08/20/2026Q00915930-P9Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram6
08/20/2026Q00915930-A1Open ↗
08/20/2026Q00915930-P9Open ↗
08/13/2026Q00915930-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications144
▸DOB NOWProgress Inspector Seal & Signature115
09/20/2026Q00915930-P5Open ↗
09/20/2026Q00915930-P5Open ↗
09/20/2026Q00915930-P5Open ↗
Showing 3 of 115 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/20/2026Q00915930-P5Open ↗
09/20/2026Q00915930-P5Open ↗
09/20/2026Q00915930-P5Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/21/2026Q01158413-I1Open ↗
08/20/2026Q00915930-P6Open ↗
08/20/2026Q00915930-A1Open ↗
Showing 3 of 13 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/20/2026Q00915930-A1Open ↗
08/20/2026Q00915930-P9Open ↗
Showing 2 of 6 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist6
08/20/2026Q00915930-A1Open ↗
08/20/2026Q00915930-P9Open ↗
08/20/2026Q00915930-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/20/2026Q00915930-A1Open ↗
08/20/2026Q00915930-P9Open ↗
08/20/2026Q00915930-P8Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00915930-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents26
▸DOB NOWSite Survey: Initial6
08/20/2026Q00915930-A1Open ↗
08/20/2026Q00915930-P9Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/20/2026Q00915930-A1Open ↗
08/20/2026Q00915930-P9Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWPlot Diagram6
08/20/2026Q00915930-A1Open ↗
08/20/2026Q00915930-P9Open ↗
08/13/2026Q00915930-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/20/2026Q00915930-A1Open ↗
08/20/2026Q00915930-P9Open ↗
08/20/2026Q00915930-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00915930-I1Open ↗
▸DOB NOWFinal Survey1
08/20/2026Q00915930-I1Open ↗