Two family brick
62-45 60TH STREET
QUEENS · BIN 4618266
💬 Discuss this project
2023Year Built
3Stories
B1Building Class
R6BZoning
2,700 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: 6247 REALTY LLC · 1,500 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionOther
Roof44p · 2 filings · 20 docs
Floor 344p · 2 filings · 20 docs
Floor 245p · 2 filings · 20 docs
Floor 146p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELLI6007/08/2026
INC DLM CONTRACTORS103/22/2026
6247 REALTY203/21/2026
ELLI NY DESIGN803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS1806/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING1803/21/2026
NODE ARCHITECTURE,ENGINEERING,CON1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DLM CONTRACTORS INCGeneral Contractor1807/08/2026
MASTER PLBG AND HTG INCFire Protection107/08/2026
CARPEX INCGeneral Contractor104/09/2026
HEMANCHAL DEONARINEElectrical103/21/2026
HAWK. AA LLCGeneral Contractor104/09/2026
HAWK CONTRACTING OF NY INGeneral Contractor104/09/2026
MASTER 2 PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NODE ARCHITECTURE,ENGINEE67991506/17/2026
INTERNATIONAL GEOTEHCNICA17951101/07/2026
Building Lifecycle
All (108)Filed (17)Permit Issued (20)Signed Off (6)Violation (1)Inspection (8)Objection (26)Special Inspection (30)
06/27/2026
Special inspection requirement — Lighting in dwelling units
Radomir Delic
06/27/2026
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
06/27/2026
Special inspection requirement — Electric vehicle service equipment requirements
Radomir Delic
06/27/2026
Special inspection requirement — Maintenance information
Radomir Delic
06/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Radomir Delic
06/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Radomir Delic
06/27/2026
Special inspection requirement — Insulation placement and R values
Radomir Delic
06/27/2026
Special inspection requirement — Fenestration areas
Radomir Delic
06/27/2026
Special inspection requirement — Lighting controls
Radomir Delic
06/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
06/27/2026
Special inspection requirement — Exterior lighting power
Radomir Delic
06/27/2026
Special inspection requirement — Metering
Radomir Delic
06/27/2026
Special inspection requirement — Interior lighting power
Radomir Delic
06/27/2026
Special inspection requirement — Permanent certificate
Radomir Delic
06/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
06/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Radomir Delic
06/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
06/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
06/27/2026
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
06/27/2026
Special inspection requirement — Fenestration air leakage
Radomir Delic
06/27/2026
Special inspection requirement — Air barrier — testing
Radomir Delic
06/27/2026
Special inspection requirement — Duct leakage testing, insulation and design
Radomir Delic
06/17/2026
Filed — New Building
Construction of New 3 Story Residential Building.
Q00787859-A3
04/17/2026
Signed off — New Building
Construction of New 3 Story Residential Building.
Q00787859-S1
04/10/2026
Signed off — New Building
Construction of New 3 Story Residential Building.
Q00787859-S2
04/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/20/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/05/2026
Signed off — New Building
Construction of New 3 Story Residential Building.
Q00787859-S3
03/05/2026
Signed off — New Building
Construction of New 3 Story Residential Building.
Q00787859-S4
03/05/2026
Signed off — Alteration
Q00657500-I1
02/24/2026
Signed off — Alteration
Construction Fence filed in conjunction with NB Application # 421603358
Q00535878-I1
01/07/2026
Filed — New Building
Construction of New 3 Story Residential Building.
Q00787859-A2
01/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
01/07/2026
Special inspection requirement — Heating Systems
MICHAEL KARANTINIDIS, P.E.
01/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL KARANTINIDIS, P.E.
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
01/07/2026
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
01/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
01/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
01/07/2026
Special inspection requirement — Final
Radomir Delic
12/28/2025
Objection resolved — Addressed
12/23/2025
Objection raised — Zoning
12/16/2025
Filed — New Building
Construction of New 3 Story Residential Building.
Q00787859-P9
07/31/2025
Permit issued — General Construction
Q00787859-I1-GC
07/30/2025
Permit issued — Structural
Q00657500-I1-ST
07/30/2025
Permit issued — Construction Fence
Q00535878-I1-FN
07/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/23/2025
Filed — New Building
Construction of New 3 Story Residential Building.
Q00787859-P7
04/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/23/2025
Permit issued — Sprinklers
Q00787859-S2-EW-SP
04/18/2025
Filed — New Building
Construction of New 3 Story Residential Building.
Q00787859-P4
04/18/2025
Filed — New Building
Construction of New 3 Story Residential Building.
Q00787859-P6
04/08/2025
Permit issued — Mechanical Systems
Q00787859-S3-MS
04/08/2025
Permit issued — Plumbing
Q00787859-S1-PL
01/30/2025
Permit issued — Construction Fence
Q00535878-I1-FN
01/30/2025
Permit issued — Structural
Q00657500-I1-ST
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDLM CONTRACTORS07/31/2025
DOB NOWStructuralSigned-offDLM CONTRACTORS07/30/2025
DOB NOWConstruction FenceSigned-offDLM CONTRACTORS07/30/2025
DOB NOWSprinklersSigned-offMASTER PLBG AND HTG INC04/23/2025
DOB NOWMechanical SystemsSigned-offCARPEX INC04/08/2025
DOB NOWPlumbingSigned-offMASTER 2 PLBG & HTG INC04/08/2025
DOB NOWConstruction FenceSigned-offDLM CONTRACTORS01/30/2025
DOB NOWStructuralSigned-offDLM CONTRACTORS01/30/2025
DOB NOWGeneral ConstructionPermit IssuedDLM CONTRACTORS01/29/2025
DOB NOWConstruction FenceSigned-offDLM CONTRACTORS07/30/2024
DOB NOWGeneral ConstructionPermit IssuedDLM CONTRACTORS07/29/2024
DOB NOWConstruction FenceSigned-offDLM CONTRACTORS02/16/2024
DOB NOWStructuralSigned-offDLM CONTRACTORS02/16/2024
DOB NOWGeneral ConstructionPermit IssuedDLM CONTRACTORS02/16/2024
DOB NOWGeneral ConstructionPermit IssuedDLM CONTRACTORS09/27/2023
DOB NOWStructuralSigned-offDLM CONTRACTORS09/14/2023
DOB NOWConstruction FenceSigned-offDLM CONTRACTORS07/11/2023
DOB NOWFoundationSigned-offDLM CONTRACTORS07/07/2023
DOB NOWConstruction FenceSigned-offHAWK. AA LLC11/11/2022
DOB NOWConstruction FenceSigned-offHAWK CONTRACTING OF NY IN07/09/2021
BIS—ISSUEDHAWK CONTRACTING OF NY IN08/18/2021
1 project · most recent 06/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2026Permit IssuedDLM CONTRACTORS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-FS06NA-U1 6,000 BTU · Fan Coil Indoor ×22
MSZ-FS09NA 9,000 BTU · Fan Coil Indoor ×7
MXZ-4C36NA3 35,400 BTU · Condensing Unit ×5
MXZ-3C24NA3 22,000 BTU · Condensing Unit ×3
MSZ-FS12NA 12,000 BTU · Fan Coil Indoor ×1
MXZ-SM42NAMHZ 42,000 BTU · Heat Pump Outdoor ×2
Daikin 3MXL24WVJU9 24,000 BTU · Heat Pump Outdoor ×2
Ventilation
Panasonic FV-0511VKS2 1 kW · Exhaust Fan ×13
1 project · most recent 06/17/2026
Sprinkler System
FiledStatusContractorScope
06/17/2026Signed-offMASTER PLBG AND HTG INCSprinkler System
1 project · most recent 06/17/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/17/2026Signed-offMASTER PLBG AND HTG INCStorm, Water/Sanitary
1 project · most recent 04/13/2026
General Wiring
FiledStatusContractorScope
04/13/2026CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/20/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/25/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 139
DateRequirementInspectorRole
06/27/2026Interior lighting powerRadomir Delicenergy_progress
06/27/2026Lighting controlsRadomir Delicenergy_progress
06/27/2026Maintenance informationRadomir Delicenergy_progress
06/27/2026Protection of exposed foundation insulationRadomir Delicenergy_progress
06/27/2026HVAC-R and service water piping design and insulationRadomir Delicenergy_progress
06/27/2026Fire-Resistance Rated ConstructionRadomir Delicprogress
06/27/2026Energy Code Compliance InspectionsRadomir Delicprogress
06/27/2026Fire-Resistant Penetrations and JointsRadomir Delicspecial
06/27/2026Electric vehicle service equipment requirementsRadomir Delicenergy_progress
06/27/2026Fenestration areasRadomir Delicenergy_progress
06/27/2026MeteringRadomir Delicenergy_progress
06/27/2026Permanent certificateRadomir Delicenergy_progress
06/27/2026Fenestration and door U-factor and product ratingsRadomir Delicenergy_progress
06/27/2026Exterior lighting powerRadomir Delicenergy_progress
06/27/2026HVAC-R and service water heating system controlsRadomir Delicenergy_progress
06/27/2026Lighting in dwelling unitsRadomir Delicenergy_progress
06/27/2026Air barrier - visual inspectionRadomir Delicenergy_progress
06/27/2026HVAC-R and service water heating equipmentRadomir Delicenergy_progress
06/27/2026Insulation placement and R valuesRadomir Delicenergy_progress
06/27/2026Fenestration air leakageRadomir Delicenergy_progress
06/27/2026Air barrier — testing Radomir Delicenergy_progress
06/27/2026Duct leakage testing, insulation and designRadomir Delicenergy_progress
01/07/2026Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
01/07/2026HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
01/07/2026Duct leakage testing, insulation and designMICHAEL KARANTINIDIS, P.E.energy_progress
Latest 25 of 139.
▾Documents — 262 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/27/2026Q00535878-P1Request digital key ↗
08/27/2026Q00535878-I1Request digital key ↗
08/25/2026Q00787859-S4Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION20
01/05/2026421635314Open ↗
11/23/2022440688800Open ↗
11/10/2022440688800Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION2
10/01/2021421603358Open ↗
10/01/2021421603358Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/12/2022440688800Open ↗
▸Zoning, Tax Lot & Property Records19
▸DOB NOWZD1: DOB Zoning Diagram5
08/20/2026Q00787859-A3Open ↗
08/13/2026Q00787859-I1Open ↗
08/13/2026Q00787859-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/20/2026Q00787859-A3Open ↗
08/13/2026Q00787859-P9Open ↗
08/13/2026Q00787859-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION3
07/23/2018421603358Open ↗
07/23/2018421603358Open ↗
07/23/2018421603358Open ↗
▸BISZONING DIAGRAM2
10/20/2021421603358Open ↗
07/20/2018421603358Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/20/2026Q00787859-A3Open ↗
08/20/2026Q00787859-I1Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/20/2021421603358Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026Q00787859-I1Open ↗
▸Seals & Professional Certifications120
▸DOB NOWProgress Inspector Seal & Signature72
09/01/2026Q00787859-P6Open ↗
08/29/2026Q00787859-P3Open ↗
08/29/2026Q00787859-P3Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026Q00787859-P6Open ↗
09/01/2026Q00787859-P6Open ↗
08/29/2026Q00787859-P3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/24/2026Q00657500-I1Open ↗
08/20/2026Q00787859-A3Open ↗
08/13/2026Q00535878-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/01/2021421603358Open ↗
10/01/2021421603358Open ↗
06/05/2018421635314Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
11/14/2022440688800Open ↗
11/10/2021440688800Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/05/2018421635314Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/05/2018421635314Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/10/2021440688800Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00787859-P1Open ↗
08/13/2026Q00787859-P9Open ↗
08/13/2026Q00787859-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/05/2018421635314Open ↗
02/20/2018421603358Open ↗
▸Safety & Tenant Protection15
▸BISSTREET TREE CHECKLIST5
11/14/2022440688800Open ↗
11/10/2021440688800Open ↗
07/23/2018421603358Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist5
08/20/2026Q00787859-A3Open ↗
08/13/2026Q00787859-P1Open ↗
08/13/2026Q00787859-P9Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
10/20/2021421603358Open ↗
10/01/2021421603358Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00787859-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/20/2026Q00787859-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/20/2026Q00787859-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/16/2021421603358Open ↗
07/16/2021421603358Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/05/2018421635314Open ↗
02/20/2018421603358Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/19/2021421603358Open ↗
07/16/2021421603358Open ↗
07/16/2021421603358Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/20/2021421603358Open ↗
10/01/2021421603358Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/19/2021421603358Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/23/2018421603358Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
10/20/2021421603358Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00787859-S4Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE5
03/02/2022421603358Open ↗
09/07/2021421603358Open ↗
08/11/2021421603358Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
03/22/2022421603358Open ↗
▸Cost, Insurance & Ownership3
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
10/01/2021421603358Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/01/2021421603358Open ↗
▸BISCOST AFFIDAVIT1
06/05/2018421635314Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION12
11/14/2022440688800Open ↗
10/20/2021421603358Open ↗
10/20/2021421603358Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET2
06/05/2018421635314Open ↗
02/20/2018421603358Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/10/2021440688800Open ↗
▸BISBOROUGH INTAKE FORM1
10/01/2019421603358Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial5
08/20/2026Q00787859-A3Open ↗
08/13/2026Q00787859-P1Open ↗
08/13/2026Q00787859-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/20/2026Q00787859-A3Open ↗
08/13/2026Q00787859-P1Open ↗
08/13/2026Q00787859-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/20/2026Q00787859-A3Open ↗
08/13/2026Q00787859-P8Open ↗
08/13/2026Q00787859-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
11/14/2022440688800Open ↗
11/14/2022440688800Open ↗
11/10/2021440688800Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/14/2022440688800Open ↗
▸BISPLOT DIAGRAM1
02/20/2018421603358Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00787859-S4Open ↗
▸DOB NOWFinal Survey1
08/20/2026Q00787859-I1Open ↗