← Back
Two family frame
62-55 60 ROAD
QUEENS · BIN 4433462
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4-1Zoning
2,026 sfGross Floor Area
2Units
9 Open Violations 7 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family frame · 2,300 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof2p · 1 filing · 15 docs
Floor 21p · 1 filing · 15 docs
Floor 12p · 2 filings · 14 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY304/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/14/2022$940K—Private party → Private party$464/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SAGACITY BUILDING SERVICES203/21/2026
GREEN STUDIO203/21/2026
OAK STONE DEMOLITION103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OAK & STONE DEMOLITIONGeneral Contractor207/08/2026
ACE GROUP NY CORPGeneral Contractor104/09/2026
LXC CONSTRUCTION INCGeneral Contractor107/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOUTH BAY ENGINEERING PLL6682201/10/2025
SD TESTING & INSPECTION S7010309/29/2022
Building Lifecycle
All (87)Filed (12)Permit Issued (5)Signed Off (2)Violation (12)Inspection (4)Objection (22)Special Inspection (30)
04/07/2026
Permit issued — Sidewalk Shed
Q01084419-I1-SH
11/14/2025
Violation issued (ECB, open)
Construction
11/14/2025
Violation issued (ECB, open)
Unknown
11/14/2025
Violation issued (ECB, open)
Construction
10/08/2025
Violation issued (ECB, open)
Construction
08/15/2025
Permit issued — Construction Fence
Q01214439-I1-FN
07/29/2025
Filed — Alteration
RESTORE FIRE DAMAGED TWO FAMILY DWELLING UNIT.
Q01262719-I1
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2025
Special inspection requirement — Preliminary
07/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
07/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
07/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/29/2025
Special inspection requirement — Preliminary
07/28/2025
Special inspection requirement — Mechanical Systems
07/28/2025
Special inspection requirement — Final
07/28/2025
Special inspection requirement — Final
07/28/2025
Special inspection requirement — Mechanical Systems
06/24/2025
Permit issued — Construction Fence
Q01214439-I1-FN
05/20/2025
Objection raised — Fire_Protection
05/20/2025
Objection raised — Fire_Protection
05/20/2025
Objection raised — Fire_Protection
05/20/2025
Objection raised — Scope
05/20/2025
Objection raised — Plumbing
05/20/2025
Objection raised — Fire_Protection
05/20/2025
Objection raised — Plumbing
05/20/2025
Objection raised — Plumbing
05/20/2025
Objection raised — Fire_Protection
05/20/2025
Objection raised — Fire_Protection
05/19/2025
Objection raised — Scope
05/19/2025
Objection raised — Mechanical
05/19/2025
Objection raised — Energy
05/07/2025
Filed — New Building
NEW 1.5 INCH COMBINED DOMESTIC WATER AND SPRINKLER SYSTEM WITH 4 INCH MAIN SEWER SYSTEM FOR NEW 2 FAMILY HOUSE
Q01171150-S3
05/07/2025
Filed — New Building
NEW 1.5 INCH COMBINED DOMESTIC WATER AND SPRINKLER SYSTEM WITH 4 INCH MAIN SEWER SYSTEM FOR NEW 2 FAMILY HOUSE
Q01171150-S1
04/30/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/30/2025
Special inspection requirement — Interior lighting power
04/30/2025
Special inspection requirement — Preliminary
04/30/2025
Special inspection requirement — Subgrade Inspections
04/30/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/30/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/30/2025
Special inspection requirement — Protection of exposed foundation insulation
04/24/2025
Violation issued (ECB, open)
Unknown
04/24/2025
Violation issued (ECB, closed)
Unknown
04/24/2025
Objection raised — Zoning
04/24/2025
Objection raised — Zoning
04/24/2025
Objection raised — Zoning
04/24/2025
Objection raised — Zoning
04/24/2025
Objection raised — Zoning
04/23/2025
Filed — Alteration
Q01214439-I1
04/19/2025
Objection resolved — Addressed
04/07/2025
Objection raised — Other
04/01/2025
Filed — New Building
NEW 1.5 INCH COMBINED DOMESTIC WATER AND SPRINKLER SYSTEM WITH 4 INCH MAIN SEWER SYSTEM FOR NEW 2 FAMILY HOUSE
Q01171150-S4
02/11/2025
Filed — New Building
NEW 1.5 INCH COMBINED DOMESTIC WATER AND SPRINKLER SYSTEM WITH 4 INCH MAIN SEWER SYSTEM FOR NEW 2 FAMILY HOUSE
Q01171150-I1
02/11/2025
Special inspection requirement — Air barrier — testing
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP04/07/2026
DOB NOWConstruction FencePermit IssuedOAK & STONE DEMOLITION08/15/2025
DOB NOWConstruction FencePermit IssuedOAK & STONE DEMOLITION06/24/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG08/19/2022
DOB NOWGeneral ConstructionSigned-offLXC CONSTRUCTION INC08/05/2022
2 projects · most recent 07/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2025——Heating and Air Conditioning Systems
Heat / Cool
Lg ×3
05/07/2025——Heating and Air Conditioning Systems
Heat / Cool
Lg LMU243HV 24,600 BTU · Vrf Outdoor ×3
LMU363HV 36,000 BTU · Condensing Unit ×1
1 project · most recent 05/07/2025
Sprinkler System
FiledStatusContractorScope
05/07/2025——Sprinkler System
1 project · most recent 05/07/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/07/2025——Storm, Water/Sanitary
1 project · most recent 04/06/2026
FiledStatusContractorScope
04/06/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 project · most recent 05/07/2025
Concrete Masonry Wood
FiledStatusContractorScope
05/07/2025——Concrete, Masonry, Wood
1 project · most recent 05/07/2025
Fence
FiledStatusContractorScope
05/07/2025——Fence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/14/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/12/2022Pass-Final General Construction Non-Directive 14PassView ↗
12/08/2022Fail-Final General Construction Non-Directive 14FailView ↗
10/06/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
07/29/2025Fire-Resistant Penetrations and Joints—special
07/29/2025Preliminary—progress
07/29/2025Fire-Resistance Rated Construction—progress
07/29/2025Energy Code Compliance Inspections—progress
07/29/2025Structural Stability – Alterations of existing buildings—special
07/29/2025Fire-Resistant Penetrations and Joints—special
07/29/2025Structural Stability – Alterations of existing buildings—special
07/29/2025Energy Code Compliance Inspections—progress
07/29/2025Fire-Resistance Rated Construction—progress
07/29/2025Preliminary—progress
07/28/2025Mechanical Systems—special
07/28/2025Final—progress
07/28/2025Final—progress
07/28/2025Mechanical Systems—special
04/30/2025Interior lighting power—energy_progress
04/30/2025Preliminary—progress
04/30/2025Subgrade Inspections—special
04/30/2025Excavations - Sheeting, Shoring, and Bracing—special
04/30/2025Subsurface Investigations (Borings/Test Pits)—special
04/30/2025Structural Stability – Alterations of existing buildings—special
04/30/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
04/30/2025Protection of exposed foundation insulation—energy_progress
02/11/2025Air barrier — testing —energy_progress
02/11/2025Concrete - Cast-In-Place—special
02/11/2025Fire-Resistant Penetrations and Joints—special
Latest 25 of 51.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026Q00777081-I1Request digital key ↗
08/25/2026Q00785283-I1Request digital key ↗
08/23/2026Q01030612-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01171150-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026Q00777081-I1Open ↗
08/25/2026Q00785283-I1Open ↗
08/23/2026Q01030612-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026Q00785283-P1Open ↗
08/28/2026Q00785283-P1Open ↗
08/28/2026Q00785283-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q01030612-P1Open ↗
08/31/2026Q01030612-P1Open ↗
08/28/2026Q00785283-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWWater Cut-Off1
08/13/2026Q01030612-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01030612-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01030612-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q01030612-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/23/2026Q01030612-I1Open ↗
08/19/2026Q01262719-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026Q00777081-I1Open ↗
08/25/2026Q00785283-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01030612-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00785283-I1Open ↗
08/13/2026Q00777081-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/23/2026Q01030612-P1Open ↗
08/23/2026Q01030612-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01171150-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01171150-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01030612-I1Open ↗