| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/31/2026 | — | — | Heating and Air Conditioning Systems, Heating Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | — | — | 3 scope_items |
| Firm | Filings | Most Recent |
|---|---|---|
| ELEVATED ENGINEERING NYC | 3 | 07/31/2026 |
| KAO HWA LEE | 2 | 07/07/2026 |
| A&D ENGINEERING, PLLC | 3 | 07/02/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/31/2026 | Post-installed Anchors | — | special |
| 07/31/2026 | Structural Steel - Details | — | special |
| 07/31/2026 | Structural Steel - Welding | — | special |
| 07/31/2026 | Subgrade Inspections | — | special |
| 07/31/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 07/31/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 07/31/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 07/31/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 07/29/2026 | Structural Cold-Formed Steel | — | special |
| 07/27/2026 | Concrete - Cast-In-Place | — | special |
| 07/27/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 07/27/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 07/27/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 07/27/2026 | Masonry | — | special |
| 07/27/2026 | Concrete - Cast-In-Place | — | special |
| 07/27/2026 | Post-installed Anchors | — | special |
| 06/16/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/16/2026 | Post-installed Anchors | — | special |
| 06/16/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 06/16/2026 | Energy Code Compliance Inspections | — | progress |
| 06/16/2026 | Maintenance information | — | energy_progress |
| 06/16/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/16/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | — | special |