ECB10/27/200434A,34B,44A,50,50A,50B.44A-ILLEGAL STEAM PRESSURE GAUGE MUST BE 'O' TP'30' PSI STEAM GAUGE WITH SYPHON LOOP(PIG TAIL).50.MISSING SIDE OUTLET AND DISCHARGE PIPE FOR BOILER FOR POP SAFETY VALVE.2" VALVE.50A-MISSI$-180 due
ECB01/10/2025FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 40000083102N0005 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FONothing owed — awaiting certificate of correction
ECB01/10/2025FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 40000083102N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FONothing owed — awaiting certificate of correction
ECB03/05/2022CONSTRUCTED FENCE NOT MAINTAINED TO CODE. AT TIME OF INSPECTION ON A 3STY DEMO SITE, I OBSERVED A CONSTRUCTION FENCE INSTALLED AT EXP#1,2&4.THE CONSTRUCTION FENCE IS NOT BEING MAINTAINED DUE TO THE FOLLOWING OBNothing owed — awaiting certificate of correction