← Back
Elevator co-op, conversion from loft/warehouse
62 GREENE STREET
MANHATTAN · BIN 1007256
💬 Discuss this project
1873Year Built
5Stories
D0Building Class
M1-5/R7XZoning
23,319 sfGross Floor Area
5Units
Rent Stabilized2 Open Violations ▸
Elevator co-op, conversion from loft/warehouse · Owner of record: 62 GREENE ST OWNERS CORP · 4,800 sf lot · 4.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Floor 19p · 3 filings · 20 docs
Cellar11p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
62 GREENE OWNERS3707/08/2026
62 GREENE STREET OWNERS5403/22/2026
SHR GROUP103/22/2026
THE OWNER OF103/22/2026
OWNER OF 62 GREENE ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIGHLAND ASSOCIATES808/05/2025
THE EIPEL ENGINEERING GROUP, D.P.C.111/02/2022
H ARCHITECTURE401/14/2021
ASIF JAMIL, RA109/03/2018
BONE/LEVINE ARCHITECTS208/17/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES903/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
MJ EXPEDITNG SERVICE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHR GROUP INCGeneral Contractor1007/08/2026
OCGP LLCGeneral Contractor307/08/2026
SIGNS CADScaffold207/08/2026
DEMAR PLUMBING CORPFire Protection107/08/2026
AMOK INCFire Protection107/08/2026
CK PLUMBING & MECH INCPlumbing107/08/2026
DEMAR MECHANICAL INCPlumbing107/08/2026
FIBERTEK DATA & ELEC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SAG ENGINEERING & CONSULT608708/05/2025
THE EIPEL ENGINEERING GRO2714111/02/2022
Building Lifecycle
All (127)Filed (16)Permit Issued (13)Signed Off (9)Violation (60)Inspection (9)Objection (4)Special Inspection (16)
09/22/2025
Signed off — Alteration
Sprinkler work for existing retail space as shown on plans
M00790801-I1
08/12/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2025
Special inspection requirement — Sprinkler Systems
Chester Kowalski
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
08/05/2025
Filed — Alteration
Sprinkler work for existing retail space as shown on plans
M00790801-P1
06/04/2025
Violation issued (HPD, closed)
A
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
05/02/2025
Special inspection requirement — Sprinkler Systems
Chester Kowalski
04/29/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/21/2025
Permit issued — Sprinklers
M00790801-I1-EW-SP
03/05/2025
Signed off — Alteration
M07996884-I1
02/28/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
01/16/2025
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
01/03/2025
Signed off — Alteration
Plumbing work for existing retail space as shown on plans.
M00790770-I1
12/18/2024
Permit issued — Sign
M07996884-I1-SG
12/17/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/08/2024
Signed off — Alteration
Interior renovation of existing Retail space.
M00789563-I1
10/07/2024
Signed off — Alteration
Mechanical work for existing retail space as shown on plans.
M00790727-I1
09/17/2024
Filed — Alteration
Interior renovation of existing Retail space.
M00789563-P1
09/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
09/12/2024
Special inspection requirement — Final
Chester Kowalski
09/12/2024
Special inspection requirement — Mechanical Systems
Chester Kowalski
09/10/2024
Filed — Alteration
Mechanical work for existing retail space as shown on plans.
M00790727-P1
06/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Chester Kowalski
06/18/2024
Special inspection requirement — Final
Chester Kowalski
06/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
12/13/2023
Signed off — Alteration
Structural work for existing retail space as shown on plans.
M00790789-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/20/2023
Permit issued — Sign
M07996884-I1-SG
03/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2023
Filed — Alteration
M07996884-I1
12/06/2022
Permit issued — Structural
M00790789-I1-ST
12/06/2022
Permit issued — Mechanical Systems
M00790727-I1-MS
12/06/2022
Permit issued — General Construction
M00789563-I1-GC
12/05/2022
Permit issued — Sprinklers
M00790801-I1-EW-SP
12/05/2022
Permit issued — Plumbing
M00790770-I1-PL
11/03/2022
Filed — Alteration
Mechanical work for existing retail space as shown on plans.
M00790727-I1
11/02/2022
Filed — Alteration
Sprinkler work for existing retail space as shown on plans
M00790801-I1
11/02/2022
Filed — Alteration
Plumbing work for existing retail space as shown on plans.
M00790770-I1
11/02/2022
Filed — Alteration
Interior renovation of existing Retail space.
M00789563-I1
11/02/2022
Filed — Alteration
Structural work for existing retail space as shown on plans.
M00790789-I1
11/02/2022
Violation issued (HPD, closed)
I
08/10/2022
Special inspection requirement — Structural Wood Frame
Bix Ellenbecker
08/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Bix Ellenbecker
08/10/2022
Special inspection requirement — Post-installed Anchors
Bix Ellenbecker
08/10/2022
Special inspection requirement — Final
Bix Ellenbecker
06/08/2022
Signed off — Alteration
ERECT, MAINTAIN & DISMANTLE 12' HIGH HEAVY DUTY SIDEWALK SHED APPROX 65 LFT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00071747-I1
06/08/2022
Signed off — Alteration
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH
M00071752-I1
02/15/2022
Violation issued (HPD, closed)
A
04/09/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/17/2021
Signed off — Alteration
HEREWITH FILE PLAN TO CAP AND REMOVE (1) EXISTING SINK LOCATED ON FIRST FLOOR. NO CHANGE INUSE, EGRESS AND OCCUPANCY.
M00453662-I1
02/11/2021
Permit issued — Plumbing
M00453662-I1-PL
01/14/2021
Filed — Alteration
HEREWITH FILE PLAN TO CAP AND REMOVE (1) EXISTING SINK LOCATED ON FIRST FLOOR. NO CHANGE INUSE, EGRESS AND OCCUPANCY.
M00453662-I1
01/13/2021
Special inspection requirement — Maintenance information
JAEJUN RYU
01/13/2021
Special inspection requirement — Energy Code Compliance
JAEJUN RYU
10/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/28/2020
Filed — No Work
M00302722-I1
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDEMAR PLUMBING CORP03/21/2025
DOB NOWSignSigned-offSIGNS CAD CORP12/18/2024
DOB NOWSignSigned-offSIGNS CAD CORP03/20/2023
DOB NOWStructuralSigned-offOCGP LLC12/06/2022
DOB NOWMechanical SystemsSigned-offOCGP LLC12/06/2022
DOB NOWGeneral ConstructionSigned-offOCGP LLC12/06/2022
DOB NOWSprinklersSigned-offAMOK INC12/05/2022
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC12/05/2022
DOB NOWPlumbingSigned-offCK PLUMBING & MECH INC02/11/2021
DOB NOWSupported ScaffoldSigned-offSHR GROUP INC05/07/2019
DOB NOWSidewalk ShedSigned-offSHR GROUP INC04/24/2019
DOB NOWSupported ScaffoldSigned-offSHR GROUP INC08/22/2018
DOB NOWSidewalk ShedSigned-offSHR GROUP INC08/17/2018
BISSPISSUEDVIP FIRE SPRINKLER INC07/23/2021
BISOTISSUEDSHR GROUP INC06/24/2021
BISSPISSUEDVIP FIRE SPRINKLER INC02/04/2021
BISOTISSUEDDKT CONTRACTORS LLC12/21/2020
BISOTISSUEDSHR GROUP INC06/22/2020
BISOTISSUEDSHR GROUP INC06/22/2020
BISPLISSUEDSO PLUMBING & HEATING INC12/10/2019
BISOTISSUEDSHR GROUP INC06/24/2019
BISOTISSUEDSHR GROUP INC06/24/2019
BISSPISSUEDAMOK INC10/12/2018
BISMHISSUEDRETCON MECHANICAL CORP10/09/2018
BISOTISSUEDSHR GROUP INC09/19/2018
BISOTISSUEDSHR GROUP INC08/15/2018
BISOTISSUEDDKT CONTRACTORS LLC07/06/2018
BISPLISSUEDPOWER PLUMBING & HEATING05/09/2018
BISOTISSUEDDKT CONTRACTORS LLC03/27/2018
BISEQISSUEDJ&C RESTORATION CORP05/11/2015
BISOTISSUEDJ&C RESTORATION CORP04/30/2015
BISPLISSUEDSYSTEMS 2000 PLBG SVCS LL09/15/2014
BISMHISSUEDFMG GENERAL CONTRACTING *05/06/2013
BISOTISSUEDFMG GENERAL CONTRACTING *05/06/2013
BISFBISSUEDRB HTG CONSULTING GROUP10/15/2012
BISSPISSUEDH.A.M. FIRE EQUIPMENT INC08/30/2012
BISMHISSUEDFMG GENERAL CONTRACTING *08/06/2012
BISOTISSUEDFMG GENERAL CONTRACTING *07/30/2012
BISBLISSUEDDEMAR PLUMBING CORP07/16/2012
BISPLISSUEDDEMAR PLUMBING CORP07/16/2012
+ 19 more permits on file
5 projects · most recent 03/15/2023
General Wiring
FiledStatusContractorScope
03/15/2023CompleteL.E.A. ELECTRIC CORP.General Wiring
04/18/2022CompleteROBERT CHIMENTI21 meters, 1 new_meters
05/04/2021CompleteAMC ELEC'L SERVICES, INC.General Wiring
09/16/2018CompleteFIBERTEK DATA & ELEC CORPGeneral Wiring
08/07/2018CompleteAMC ELEC'L SERVICES, INC.—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/12/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/29/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2025Pass-Final Sign Permit InspectionPassView ↗
01/16/2025Fail-Final Sign Permit InspectionFailView ↗
12/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/06/2025Sprinkler SystemsChester Kowalskispecial
08/06/2025Fire-Resistant Penetrations and JointsChester Kowalskispecial
05/02/2025Fire-Resistant Penetrations and JointsChester Kowalskispecial
05/02/2025Sprinkler SystemsChester Kowalskispecial
09/12/2024Fire-Resistant Penetrations and JointsChester Kowalskispecial
09/12/2024FinalChester Kowalskiprogress
09/12/2024Mechanical SystemsChester Kowalskispecial
06/18/2024Fire-Resistance Rated ConstructionChester Kowalskiprogress
06/18/2024FinalChester Kowalskiprogress
06/18/2024Fire-Resistant Penetrations and JointsChester Kowalskispecial
08/10/2022Structural Wood FrameBix Ellenbeckerprogress
08/10/2022Structural Stability – Alterations of existing buildingsBix Ellenbeckerspecial
08/10/2022Post-installed AnchorsBix Ellenbeckerspecial
08/10/2022FinalBix Ellenbeckerprogress
01/13/2021Maintenance informationJAEJUN RYUenergy_progress
01/13/2021Energy Code ComplianceJAEJUN RYUprogress
▾Documents — 430 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch12
09/06/2026M00071747-I1Request digital key ↗
09/06/2026M00071752-I1Request digital key ↗
09/06/2026M00071752-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
09/05/2026M00247916-I1Request digital key ↗
09/05/2026M00302722-I1Request digital key ↗
08/15/2026M00216385-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00453662-I1Request digital key ↗
▸Applications & Permits101
▸BISPLAN / WORK APPROVAL APPLICATION54
10/17/2025121983853Open ↗
06/17/2022120405310Open ↗
06/17/2022120405310Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION33
07/27/2021123151819Open ↗
02/05/2021121359993Open ↗
12/21/2020140982890Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWLPC Approval/Permit8
08/13/2026M00453662-I1Open ↗
08/13/2026M07996884-I1Open ↗
08/13/2026M00790770-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPLACE OF ASSEMBLY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
06/04/2019123385595Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/23/2020120405310Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
06/24/2020120405310Open ↗
▸Seals & Professional Certifications87
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
06/04/2019123385595Open ↗
06/04/2019123385595Open ↗
06/04/2019123446253Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/06/2026M00071752-P1Open ↗
09/06/2026M00071752-I1Open ↗
09/05/2026M00216385-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/11/2026M00790727-I1Open ↗
09/11/2026M00790727-I1Open ↗
09/01/2026M00789563-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/11/2026M00790727-I1Open ↗
09/01/2026M00789563-P1Open ↗
09/01/2026M00789563-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/08/2020140982890Open ↗
04/27/2018123446253Open ↗
03/27/2018123385595Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/27/2018123446253Open ↗
03/27/2018123385595Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/08/2020140982890Open ↗
05/05/2015140341869Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/08/2020140982890Open ↗
05/05/2015140341869Open ↗
▸Trade Schedules & Equipment33
▸BISSCHEDULE B - PLUMBING10
04/09/2021121359993Open ↗
04/06/2021121359993Open ↗
Showing 2 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
10/23/2014121359993Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
02/09/2022123151819Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/27/2018123446253Open ↗
03/02/2018123151819Open ↗
03/02/2018123151819Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
04/26/2021121359993Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
02/09/2022123151819Open ↗
Showing 1 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
06/29/2018123151819Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes4
07/11/2018123151819Open ↗
04/27/2018123446253Open ↗
03/27/2018123385595Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
03/03/2021140982890Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00453662-I1Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026M00790801-P1Open ↗
09/01/2026M00790801-I1Open ↗
09/01/2026M00789563-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
12/08/2020140982890Open ↗
03/27/2018123385595Open ↗
03/02/2018123151819Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)3
04/23/2014121983853Open ↗
04/23/2014121983853Open ↗
04/23/2014121983853Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
06/04/2019123385595Open ↗
06/04/2019123446253Open ↗
05/09/2018123446253Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/19/2021122469122Open ↗
06/04/2019123385595Open ↗
06/04/2019123446253Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY17
07/29/2022120405310Open ↗
04/15/2022140341869Open ↗
03/28/2022121359993Open ↗
Showing 3 of 17 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
12/21/2020140982890Open ↗
▸Approvals, Objections & Sign-offs58
▸BISLANDMARKS APPROVAL13
12/08/2020140982890Open ↗
06/29/2018123151819Open ↗
06/29/2018123151819Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
05/02/2022140341869Open ↗
03/31/2022121359993Open ↗
02/10/2022123151819Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
06/17/2022120405310Open ↗
06/17/2022120405310Open ↗
02/08/2021120405310Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/03/2022120405310Open ↗
02/05/2020120405310Open ↗
01/21/2020120405310Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS SIGNOFF4
05/31/2022120405310Open ↗
03/31/2022121359993Open ↗
02/10/2022123151819Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
07/27/2021123151819Open ↗
02/05/2021121359993Open ↗
12/11/2019123151819Open ↗
▸BISFINAL1
03/03/2021140982890Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT28
03/28/2022121359993Open ↗
11/19/2021122469122Open ↗
04/26/2021121359993Open ↗
Showing 3 of 28 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
05/24/2022120405310Open ↗
02/09/2022123151819Open ↗
03/03/2021140982890Open ↗
▸Filing & Intake Forms31
▸BISEFILING COVER SHEET16
04/27/2018123446253Open ↗
03/27/2018123385595Open ↗
03/02/2018123151819Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION7
05/03/2022120405310Open ↗
03/09/2021120405310Open ↗
06/24/2020120405310Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
02/05/2020120405310Open ↗
01/21/2020120405310Open ↗
01/10/2020120405310Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/08/2020140982890Open ↗
05/05/2015140341869Open ↗
▸Other Documents8
▸DOB NOWProof of Historic Building5
08/13/2026M00790727-I1Open ↗
08/13/2026M00789563-I1Open ↗
08/13/2026M00789563-P1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type