← Back
General warehouse
62 HOPE STREET
BROOKLYN · BIN 3062693
💬 Discuss this project
1930Year Built
2Stories
E1Building Class
M1-2/R6AZoning
14,600 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
General warehouse · Owner of record: 62 HOPE STREET CORP · 14,600 sf lot · 1 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
62 HOPE STREET1304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CLIP ARCHITECTS210/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ CONSTRUCTION GROUP INCGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREAT WALL CONSULTANT P.E5633108/27/2025
Building Lifecycle
All (24)Filed (2)Permit Issued (2)Signed Off (2)Violation (8)Inspection (1)Objection (6)Special Inspection (3)
02/18/2026
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION WOOD FENCE INCONJUNCTION WITH CONSTRUCTION APPLICATION #B01272838-I1 AT OSP AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01292045-I1
02/17/2026
Signed off — Alteration
File to address DOB violation# V040125CPI30101HZ & V062525CPI30103ZT. Propose to replace exterior lintel, repair cracked masonry @ Exp 1, replace coping stone @ Exp 3 & repair cracked masonry @ Exp 4 as per plans. Restore back to safety condition.
B01272838-I1
02/13/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/02/2025
Permit issued — Construction Fence
B01292045-I1-FN
10/01/2025
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION WOOD FENCE INCONJUNCTION WITH CONSTRUCTION APPLICATION #B01272838-I1 AT OSP AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01292045-I1
09/26/2025
Permit issued — General Construction
B01272838-I1-GC
09/23/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Structural
09/09/2025
Objection raised — Admin
08/27/2025
Filed — Alteration
File to address DOB violation# V040125CPI30101HZ & V062525CPI30103ZT. Propose to replace exterior lintel, repair cracked masonry @ Exp 1, replace coping stone @ Exp 3 & repair cracked masonry @ Exp 4 as per plans. Restore back to safety condition.
B01272838-I1
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
08/26/2025
Special inspection requirement — Masonry
Xiong Wei Wu
08/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xiong Wei Wu
06/25/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2023
Violation issued (FDNY_ORDER, closed)
08/02/2023
Violation issued (FDNY_ORDER, closed)
08/11/2017
Violation issued (FDNY_NOV, closed)
07/16/1996
Violation issued (FDNY_NOV, closed)
04/22/1993
Violation issued (FDNY_NOV, closed)
12/23/1989
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offJZ CONSTRUCTION GROUP INC10/02/2025
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC09/26/2025
BISOTISSUEDMBC CONSTRUCTION CORP02/03/2020
BISEQISSUEDSPRING SCAFFOLDING06/20/2003
BISEQISSUEDM KEE CONST04/10/2003
BISOTISSUEDM KEE CONST04/10/2003
BISMHISSUEDLT GENERAL CONTRACTOR INC01/22/2002
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/13/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/26/2025Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
08/26/2025MasonryXiong Wei Wuspecial
08/26/2025Structural Stability – Alterations of existing buildingsXiong Wei Wuspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026B01272838-I1Request digital key ↗
08/20/2026B01292045-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/16/2020322007715Open ↗
01/06/2020322007715Open ↗
▸BISWORK PERMIT APPLICATION1
02/05/2020322007715Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026B01292045-I1Open ↗
08/13/2026B01272838-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/06/2020322007715Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01272838-I1Open ↗
▸Safety & Tenant Protection1
▸BISANTI-HARASSMENT CHECKLIST1
01/21/2020322007715Open ↗
▸Environmental & Asbestos4
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/21/2020322007715Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026B01272838-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01272838-I1Open ↗
▸DOB NOWOER: Notice to Proceed1
08/13/2026B01272838-I1Open ↗
▸Energy Compliance1
▸BISAS-BUILT ENERGY ANALYSIS1
07/21/2020322007715Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/21/2020322007715Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/21/2020322007715Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/21/2020322007715Open ↗
01/06/2020322007715Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/06/2020322007715Open ↗