← Back
One story - permanent living quarter
62 MACORMAC PLACE
STATEN ISLAND · BIN 5028566
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R3XZoning
1,272 sfGross Floor Area
1Units
One story - permanent living quarter · 4,360 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 15 docs
Basement1p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/22/2026
STEVEN R. SAVINO ARCHITECT PC510/31/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.C.F. CONTRACTING INCGeneral Contractor203/21/2026
GREGORY'S HOME IMPROVEMTGeneral Contractor104/09/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/03/2026
M.A.C. PLUMBING, INCPlumbing107/08/2026
R&M PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/22/2026
STEVEN R. SAVINO ARCHIT1216210/31/2025
A TECH ENGINEERING NYC, P6738311/14/2024
Building Lifecycle
All (39)Filed (6)Permit Issued (5)Signed Off (5)Inspection (6)Special Inspection (17)
07/09/2026
Signed off — Alteration
S01390091-I1
05/08/2026
Signed off — Alteration
PROPOSED WOOD CANOPY LOCATED TO THE REAR OF THE HOUSE
S01306948-I1
05/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/06/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/27/2026
Permit issued — Solar
S01390091-I1-SL
04/22/2026
Filed — Alteration
S01390091-I1
04/22/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/20/2026
Special inspection requirement — Final
Walid Abdulla
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/25/2026
Permit issued — General Construction
S01306948-I1-GC
10/31/2025
Filed — Alteration
PROPOSED WOOD CANOPY LOCATED TO THE REAR OF THE HOUSE
S01306948-I1
10/22/2025
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
10/22/2025
Special inspection requirement — Final
Steven Savino
12/02/2024
Signed off — Alteration
S00920607-I1
12/02/2024
Signed off — Alteration
INSTALLATION OF A DRWELL LOCATED TO THE REAR OF THE PROPERTY
S00920611-S1
11/22/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/14/2024
Filed — Alteration
INSTALLATION OF A DRWELL LOCATED TO THE REAR OF THE PROPERTY
S00920611-P1
10/29/2024
Signed off — Alteration
INSTALLATION OF A DRWELL LOCATED TO THE REAR OF THE PROPERTY
S00920611-I1
10/17/2024
Permit issued — Plumbing
S00920611-S1-PL
10/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/15/2024
Permit issued — Plumbing
S00920611-I1-PL
09/30/2024
Filed — Alteration
INSTALLATION OF A DRWELL LOCATED TO THE REAR OF THE PROPERTY
S00920611-S1
09/26/2024
Permit issued — General Construction
S00920607-I1-GC
09/17/2024
Filed — Alteration
INSTALLATION OF A DRWELL LOCATED TO THE REAR OF THE PROPERTY
S00920611-I1
08/20/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
07/30/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
04/24/2024
Filed — Alteration
S00920607-I1
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
04/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
09/19/2023
Special inspection requirement — Subgrade Inspections
Steven Savino
09/19/2023
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
09/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
09/19/2023
Special inspection requirement — Lighting in dwelling units
Steven Savino
08/16/2023
Special inspection requirement — Final
Steven Savino
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/27/2026
DOB NOWGeneral ConstructionSigned-offGREGORY'S HOME IMPROVEMT03/25/2026
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC10/17/2024
DOB NOWPlumbingSigned-offM.A.C. PLUMBING, INC10/15/2024
DOB NOWGeneral ConstructionSigned-offD.C.F. CONTRACTING INC09/26/2024
4 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026Permit IssuedJASON SALOME ELEC'L CONTGGeneral Wiring
06/04/2026CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
04/22/2026CompleteSUNRUN SOLAR ELECTL CORP—
01/07/2025CompleteJASON SALOME ELEC'L CONTGGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/06/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
04/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/22/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
04/22/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/22/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/20/2026FinalWalid Abdullaprogress
04/20/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/20/2026Energy Code Compliance InspectionsWalid Abdullaprogress
10/22/2025Concrete - Cast-In-PlaceSteven Savinospecial
10/22/2025FinalSteven Savinoprogress
08/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
07/30/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/22/2024Energy Code Compliance InspectionsSteven Savinoprogress
04/03/2024Fire-Resistant Penetrations and JointsSteven Savinospecial
09/19/2023Structural Stability – Alterations of existing buildingsSteven Savinospecial
09/19/2023Subgrade InspectionsSteven Savinospecial
09/19/2023Concrete - Cast-In-PlaceSteven Savinospecial
09/19/2023Fire-Resistance Rated ConstructionSteven Savinoprogress
09/19/2023Lighting in dwelling unitsSteven Savinoenergy_progress
08/16/2023FinalSteven Savinoprogress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026S00920607-I1Request digital key ↗
08/20/2026S00920611-S1Request digital key ↗
08/20/2026S00920611-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00920607-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00920607-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S00920607-I1Open ↗
09/01/2026S00920607-I1Open ↗
09/01/2026S00920607-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026S00920611-P1Open ↗
08/20/2026S00920611-S1Open ↗
08/20/2026S00920611-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S00920607-I1Open ↗
09/01/2026S00920607-I1Open ↗
08/26/2026S01306948-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026S01390091-I1Open ↗
08/13/2026S00920607-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00920607-I1Open ↗
08/13/2026S00920611-P1Open ↗
08/13/2026S00920611-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00920611-S1Open ↗
08/13/2026S00920607-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026S01390091-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026S00920607-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00920607-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S00920607-I1Open ↗