DOB08/05/2026EMERGENCY WORK ORDER DUE TO DETACHED/INSECURE BLDG MOUNTED SIGN CREATING UNSAFE COND & HAZARD TO PUBLIC. REMEDY: OWNER TO IMMEDIATELY PROV & MAINTAIN REQ PUB PROT INCLUD SIDEWALK SHED,FENCING & ANY OTHER SAFE MEAS TO PROT PUBLIC MAINTAIN SAFE ACCESS TO/FROM BLDG. NYS LP OR REG ARCH QUALIFIED AS QEWI TO INSPECT FRONT FACADE MOUNTED SIGNAGE
ECB08/05/2026FAILURE TO MAINTAIN EXTERIOR STOREFRONT SIGN. AT TIME OF INSPECTION OBSERVED THE STOREFRONT SIGN AT EXPOSURE 1 PARTIALLY DISLODGED FROM THE BUILDING WALL., REPAIR AND/REPLACE$2K due
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
ECB01/24/2024AT TIME OF INSPECTION OF A 7 STORIES BUILDING I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE #1 , UPON REVIEW THE DEPARTMENT RECORD TO VERIFY COMPLIANCE IT SHOWS THAT THE SIDEWALK SHED PERMIT HAD EXPIRED SINCE 0$-625 due
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
HPD03/25/2017§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING MINIMUM REQUIRED 100 WATTS (LIGHT FIXTURE PRESENT) AT FRONT AREAWAY, 1st STORY
HPD11/07/2015SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS MINIMUM REQUIRED (LIGHT FIXTURES PRESENT)
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
HPD04/17/2014SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 200 WATTS MINIMUM REQUIRED (LIGHT FIXTURES)
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB08/08/2002V-DOB VIOLATION - ACTIVE
ECB09/19/2025FAILURE TO MAINTAIN EXTERIOR FACADE AND APPURTENANCES.AT TIME OF INSPECTION OBSERVED STEP CRACK AT EXPOSURE#4(SOUTH ELEVATION).REM:MAINTAIN EXTERIOR BUILDING FACADE TAKE SAFETY MEASURES REPAIR DAMAGE FACADE ASHearing held — result not yet published
ECB01/28/2022PHONE NOT WORKING, PROVIDE KEYS TO MOTOR ROOMNothing owed — awaiting certificate of correction
ECB12/17/20212/X/10 OUT SIDE COMM INOPERATIVE REPAIR, 40 /P/16 MACHINE ROOM NO ACCESS ,AND ALL FLOORS NO ACCESS, PROVIDE MEAN OF ACCESS.Nothing owed — awaiting certificate of correction
ECB01/08/20047B1/16P7/5B10/10M11/72E10/36O2/38O2/43B9/39O2/36I10.7B1=MECHANICAL SAFETET EDGE NOT SENSITIVE ENOUGH AFTER THE 3RD TRY THE DOOR THEN REOPENS16P7= UNABLE TO GAIN ACCESS DUE TOLOCKOUTS ON 2ND,3RD,4TH,5TH,6TH FLS.Nothing owed — awaiting certificate of correction