← Back
BuildNYC
Elevator cooperative
62 PIERREPONT STREET
BROOKLYN · Brooklyn Heights · BIN 3001978
💬 Discuss this project
1910Year Built
8Stories
D4Building Class
R7-1Zoning
54,000 sfGross Floor Area
35Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: Pierrepont Apt · 7,500 sf lot · 7.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSuspended Scaffold Installation @5p · 2 filings · 17 docs
Floor 5Demolition and proposed work1p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1
CellarBoiler burner replacement7p · 1 filing · 12 docs
Site & exteriorSuspended Scaffold Installation @7p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pierrepont Apartment3303/22/2026
212 One Way Construction507/08/2026
Phoenix103/21/2026
62 Pierrepont Ownership103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ospino Engineering109/16/2025
Ashraf107/23/2024
Hugh Robotham, Architect206/07/2023
Reza Farimani110/06/2021
New York & Company209/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Desarno Associates203/21/2026
New York & Company203/21/2026
Hierarch-E203/21/2026
Municipal Building Consultants103/21/2026
Green Studio203/21/2026
SMN Consulting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
William K Construction ofGeneral Contractor507/08/2026
Platinum Services NYScaffold404/09/2026
Medco Electrical ContractingElectrical103/21/2026
Joe ElectricalElectrical103/22/2026
Bell Fuel OilPlumbing107/08/2026
HPG GroupGeneral Contractor107/08/2026
All Around ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joseph Farahnik Consulting3544106/07/2023
Hugh Robotham, Architect962105/18/2023
New York Engineering Associates851109/10/2020
Building Lifecycle
All (107)Filed (9)Permit Issued (13)Signed Off (4)Facade (FISP) (15)Violation (37)Objection (24)Special Inspection (5)
02/03/2026
Signed off — Alteration
B01076386-I1
10/24/2025
Permit issued — General Construction
B00823955-I1-GC
09/16/2025
Filed — Alteration
suspended scaffold installation as per plans filed herewith.
B00823955-S2
09/16/2025
Permit issued — Suspended Scaffold
B00823955-S2-SC
07/21/2025
Permit issued — Sidewalk Shed
B01076386-I1-SH
02/20/2025
Signed off — Alteration
Installation of outrigger for facade repair & inspection.
B01010967-I1
02/20/2025
Permit issued — Suspended Scaffold
B01010967-I1-SC
10/24/2024
Permit issued — General Construction
B00823955-I1-GC
08/23/2024
Objection resolved — Resolved
08/23/2024
Objection resolved — Resolved
08/05/2024
Permit issued — Suspended Scaffold
B01056351-I1-SC
07/24/2024
Permit issued — Sidewalk Shed
B01076386-I1-SH
07/23/2024
Filed — Alteration
B01076386-I1
06/04/2024
Permit issued — Suspended Scaffold
B01056351-I1-SC
05/24/2024
Filed — Alteration
B01056351-I1
02/27/2024
Permit issued — Suspended Scaffold
B01010967-I1-SC
02/26/2024
Filed — Alteration
Installation of outrigger for facade repair & inspection.
B01010967-I1
09/05/2023
Permit issued — General Construction
B00823955-I1-GC
08/27/2023
Objection resolved — Addressed
08/27/2023
Objection resolved — Addressed
08/27/2023
Objection resolved — Addressed
08/27/2023
Objection resolved — Addressed
08/27/2023
Objection resolved — Addressed
06/26/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/13/2023
Objection raised — Other
06/13/2023
Objection raised — Scope
06/13/2023
Objection raised — Scope
06/13/2023
Objection raised — Scope
06/13/2023
Objection raised — Other
06/09/2023
Objection raised — Structural
06/09/2023
Objection raised — Other
06/09/2023
Objection raised — Structural
06/09/2023
Objection raised — Admin
06/09/2023
Objection raised — Scope
06/09/2023
Objection raised — Admin
06/09/2023
Objection raised — Structural
06/07/2023
Filed — Alteration
suspended scaffold installation as per plans filed herewith.
B00823955-S1
05/18/2023
Filed — Alteration
suspended scaffold installation as per plans filed herewith.
B00823955-I1
05/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
Hugh Robotham
05/14/2023
Special inspection requirement — Final
Hugh Robotham
03/20/2023
Cycle 9 facade report signed — SWARMP
02/10/2023
Cycle 9 facade report submitted
02/10/2023
Cycle 9 facade inspection completed
01/05/2022
Signed off — Alteration
B00604319-I1
11/04/2021
Permit issued — General Construction
B00604319-I1-GC
10/06/2021
Filed — Alteration
B00604319-I1
07/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/08/2021
Signed off — Alteration
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
B00391426-I1
09/17/2020
Permit issued — Plumbing
B00391426-S1-PL
09/16/2020
Filed — Alteration
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
B00391426-S1
09/11/2020
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
09/10/2020
Filed — Alteration
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
B00391426-I1
09/10/2020
Permit issued — Boiler Equipment
B00391426-I1-BE
08/27/2020
Special inspection requirement — Heating Systems
LOUIS ARENA
08/27/2020
Special inspection requirement — Maintenance information
LOUIS ARENA
06/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWilliam K Construction of10/24/2025
DOB NOWSuspended ScaffoldPermit IssuedAmerican Ventilation Service09/16/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY07/21/2025
DOB NOWSuspended ScaffoldSigned-offWilliam K. Construction02/20/2025
DOB NOWGeneral ConstructionSigned-offWilliam K Construction of10/24/2024
DOB NOWSuspended ScaffoldPermit Issued212 One Way Construction08/05/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY07/24/2024
DOB NOWSuspended ScaffoldPermit Issued212 One Way Construction06/04/2024
DOB NOWSuspended ScaffoldSigned-offWilliam K. Construction02/27/2024
DOB NOWGeneral ConstructionSigned-offWilliam K Construction of09/05/2023
DOB NOWGeneral ConstructionSigned-offHPG Group11/04/2021
DOB NOWPlumbingSigned-offApproved Energy09/17/2020
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn09/10/2020
BISPLISSUEDAll Pro Plumbing & Heating01/25/2021
BISMHISSUEDSpectra Development04/20/2017
BISPLISSUEDSmart Plumbing & Heating11/23/2016
BISOTISSUEDSpectra Development07/26/2016
BISPLISSUEDDoval Plumbing & Heating04/05/2016
BISOTISSUEDApex BK Enterprise03/09/2016
BISPLISSUEDDyckman Plumbing and Heating06/22/2015
BISMHISSUEDH Interior Design Construction06/22/2015
BISPLISSUEDR.J.C. Mechanical05/27/2015
BISOTISSUEDBanner Construction05/22/2015
BISPLISSUEDJohn Trani Plumbing and Heating02/20/2015
BISMHISSUEDGiancola Contractors02/09/2015
BISPLISSUEDR.J.C. Mechanical07/24/2014
BISOTISSUEDBanner Construction07/17/2014
BISEQISSUEDPhoenix Sutton STR08/30/2012
BISEQISSUEDPhoenix Sutton STR08/30/2012
BISPLISSUEDFleet Plumbing and Heating06/25/2012
BISOTISSUEDH Interior Design Construction06/22/2012
BISOTISSUEDTitan Restoration06/21/2012
BISEQISSUEDPhoenix Bridging05/14/2012
BISEQISSUEDPhoenix Bridging05/09/2012
BISEQISSUEDPhoenix Bridging05/03/2012
BISEQISSUEDPhoenix Bridging12/16/2011
BISOTISSUEDBernini Construction11/22/2011
BISOTISSUEDBernini Construction11/22/2011
BISPLISSUEDA. Heating and Plumbing Works05/26/2011
BISFBISSUEDEnvironmental Pro Mechanical05/26/2011
+ 19 more permits on file
1 project · most recent 09/16/2020
Gas
FiledStatusContractorScope
09/16/2020Signed-offBell Fuel OilGas
4 projects · most recent 12/18/2024
General Wiring Boiler Controls
FiledStatusContractorScope
12/18/2024CompleteJoe ElectricalGeneral Wiring
07/09/2024CompleteIlluminous Electric—
06/25/2021CompleteTesta Electric CoBoiler Controls
06/25/2021Permit IssuedTesta Electric CoGeneral Wiring
1 project · most recent 09/16/2025
FiledStatusContractorScope
09/16/2025Signed-offWilliam K Construction of2 scope_items
1 project · most recent 09/16/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/16/2025Signed-offWilliam K Construction ofSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/14/2023Tenant Protection Plan ComplianceHugh Robothamspecial
05/14/2023FinalHugh Robothamprogress
09/11/2020Energy Code Compliance InspectionsLOUIS ARENAprogress
08/27/2020Heating SystemsLOUIS ARENAspecial
08/27/2020Maintenance informationLOUIS ARENAenergy_progress
▾Documents — 346 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
09/01/2026B00604319-I1Request digital key ↗
08/25/2026B01010967-I1Request digital key ↗
08/25/2026B01056351-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00391426-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00391426-I1Request digital key ↗
▸Applications & Permits66
▸BISWORK PERMIT APPLICATION34
01/25/2021310303917Open ↗
04/28/2017321425766Open ↗
04/28/2017321425766Open ↗
Showing 3 of 34 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION28
04/13/2021310303917Open ↗
03/24/2021310303917Open ↗
07/28/2016321425766Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026B00604319-I1Open ↗
08/13/2026B00823955-S1Open ↗
08/13/2026B00823955-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications72
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
09/05/2017321295665Open ↗
06/09/2017321425766Open ↗
07/28/2016321425766Open ↗
Showing 3 of 43 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
07/28/2016321425766Open ↗
01/28/2016321295665Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026B00391426-I1Open ↗
09/02/2026B00391426-S1Open ↗
09/01/2026B00604319-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
07/28/2016321425766Open ↗
01/28/2016321295665Open ↗
01/28/2016321295665Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00391426-S1Open ↗
08/26/2026B00391426-I1Open ↗
08/25/2026B00823955-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00391426-I1Open ↗
08/25/2026B00823955-I1Open ↗
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
07/28/2016321425766Open ↗
07/28/2015321141830Open ↗
07/24/2015321141830Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
08/17/2015321041859Open ↗
08/11/2015321041859Open ↗
06/10/2015321016100Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING6
09/28/2012320493266Open ↗
07/25/2012320493266Open ↗
06/18/2012320493266Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026B00391426-I1Open ↗
08/13/2026B00391426-S1Open ↗
▸BISTenant Protection Plan and Notes1
07/28/2016321425766Open ↗
▸BISSTREET TREE CHECKLIST1
07/03/2014321016100Open ↗
▸Environmental & Asbestos22
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
06/25/2012320493266Open ↗
06/25/2012320493266Open ↗
Showing 2 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
07/28/2016321425766Open ↗
01/28/2016321295665Open ↗
06/16/2015321141830Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026B00391426-S1Open ↗
09/02/2026B00391426-I1Open ↗
08/20/2026B00823955-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
09/05/2017321295665Open ↗
06/09/2017321425766Open ↗
07/28/2016321425766Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
09/05/2017321295665Open ↗
05/06/2016321141830Open ↗
10/19/2015321041859Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/23/2021310303917Open ↗
04/23/2021310303917Open ↗
▸Approvals, Objections & Sign-offs64
▸BISLANDMARKS APPROVAL20
06/09/2017321425766Open ↗
05/30/2017321425766Open ↗
09/26/2016321425766Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
04/23/2021310303917Open ↗
09/05/2017321295665Open ↗
06/09/2017321425766Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
01/02/2015321041859Open ↗
07/03/2014321016100Open ↗
05/27/2014320951957Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
04/13/2016321041859Open ↗
09/10/2013320261685Open ↗
06/06/2013320493266Open ↗
Showing 3 of 12 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
04/08/2016321141830Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT22
06/09/2017321425766Open ↗
07/28/2016321425766Open ↗
05/06/2016321141830Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/23/2021310303917Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION15
04/15/2021310303917Open ↗
03/29/2021310303917Open ↗
08/02/2017321295665Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET13
07/26/2016321425766Open ↗
01/25/2016321295665Open ↗
06/16/2015321141830Open ↗
Showing 3 of 13 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOROUGH INTAKE FORM1
09/05/2017321295665Open ↗
▸Other Documents7
▸DOB NOWManufacturer's Specifications3
08/13/2026B01010967-I1Open ↗
08/13/2026B00823955-S2Open ↗
08/13/2026B01056351-I1Open ↗
▸DOB NOWCalculations3
08/13/2026B00823955-S2Open ↗
08/13/2026B01010967-I1Open ↗
08/13/2026B01056351-I1Open ↗
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type