BROOKLYN
62 VERONICA PLACE
BROOKLYN · BIN 3253068
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire Protection
Penthouse16p · 1 filing · 20 docs
Floor 515p · 2 filings · 20 docs
Floor 414p · 1 filing · 20 docs
Floor 315p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 116p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RUPALI 62 BR LLC103/22/2026
G & I DEVELOPMENT303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/03/2023$1.2M—WILMINGTON SAVINGS FUND SOCIETY, FSB → BOTWIN RE LLC— not available
08/31/2021$1.1M—RUPALI 62 BR LLC → WILMINGTON SAVINGS FUND SOCIETY, FSB— not available
02/20/2019$896K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE L. PENA,P.E.1511/25/2025
SMBT CONSULTANTS LLC107/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE MAINTENANCE USA LLCGeneral Contractor603/21/2026
CROWN BUILDER & CONSTRUCTGeneral Contractor204/09/2026
PLBG P & H INCPlumbing207/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
RAJINDRAH RAMRATTANElectrical103/21/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191511/25/2025
Building Lifecycle
All (162)Filed (16)Permit Issued (12)Signed Off (2)Violation (60)Inspection (12)Objection (30)Special Inspection (30)
05/08/2026
Violation issued (HPD, closed)
A
01/22/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/25/2025
Filed — Alteration CO
APPLICATION FILED FOR FOUNDATION STRETHENING AND TO REINFORCE EXISTING CMU WALLS.
B08051086-P9
07/28/2025
Filed — Alteration CO
APPLICATION FILED FOR FOUNDATION STRETHENING AND TO REINFORCE EXISTING CMU WALLS.
B08051086-P8
07/02/2025
Permit issued — Sprinklers
B00813844-I1-PL
06/13/2025
Violation issued (HPD, closed)
A
06/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/27/2025
Permit issued — Sprinklers
B00813844-I1-EW-SP
05/01/2025
Filed — Alteration CO
APPLICATION FILED FOR FOUNDATION STRETHENING AND TO REINFORCE EXISTING CMU WALLS.
B08051086-P7
04/15/2025
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/11/2025
Objection resolved — Addressed
04/09/2025
Objection raised — Other
04/09/2025
Objection resolved — Addressed
04/04/2025
Objection raised — Other
03/26/2025
Filed — Alteration
Propose to convert from 3 to 7 dwellings. New kitchens, bathrooms, laundrys, floor drains. Remove boilers, hot water heaters and gas meters. New sprinkler system throughout, Open space to Fire dept Connection
B00813844-P4
03/20/2025
Filed — Alteration CO
APPLICATION FILED FOR FOUNDATION STRETHENING AND TO REINFORCE EXISTING CMU WALLS.
B08051086-P6
03/13/2025
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
RAYMOND CALAMARI
03/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
RAYMOND CALAMARI
03/10/2025
Special inspection requirement — Fenestration air leakage
RAYMOND CALAMARI
03/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RAYMOND CALAMARI
03/10/2025
Special inspection requirement — Energy Code Compliance Inspections
RAYMOND CALAMARI
03/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
03/10/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
03/10/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
03/10/2025
Special inspection requirement — Final
NAVEEN KUMAR
03/10/2025
Special inspection requirement — Insulation placement and R values
RAYMOND CALAMARI
03/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
RAYMOND CALAMARI
03/10/2025
Special inspection requirement — Lighting in dwelling units
RAYMOND CALAMARI
03/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/05/2025
Filed — Alteration
Propose to convert from 3 to 7 dwellings. New kitchens, bathrooms, laundrys, floor drains. Remove boilers, hot water heaters and gas meters. New sprinkler system throughout, Open space to Fire dept Connection
B00813844-P3
01/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/30/2025
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
01/22/2025
Signed off — Alteration CO
APPLICATION FILED FOR FOUNDATION STRETHENING AND TO REINFORCE EXISTING CMU WALLS.
B08051086-S1
01/15/2025
Filed — Alteration
Propose to convert from 3 to 7 dwellings. New kitchens, bathrooms, laundrys, floor drains. Remove boilers, hot water heaters and gas meters. New sprinkler system throughout, Open space to Fire dept Connection
B00813844-P2
12/26/2024
Permit issued — General Construction
B08051086-S1-GC-CX
11/29/2024
Violation issued (HPD, closed)
I
11/26/2024
Signed off — Alteration
B08050518-I1
11/21/2024
Filed — Alteration CO
APPLICATION FILED FOR FOUNDATION STRETHENING AND TO REINFORCE EXISTING CMU WALLS.
B08051086-P5
11/21/2024
Special inspection requirement — Final
NAVEEN KUMAR
11/21/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
11/21/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
11/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
11/21/2024
Special inspection requirement — Energy Code Compliance Inspections
RAYMOND CALAMARI
11/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
RAYMOND CALAMARI
11/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
RAYMOND CALAMARI
11/21/2024
Special inspection requirement — Lighting in dwelling units
RAYMOND CALAMARI
11/21/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
RAYMOND CALAMARI
11/21/2024
Special inspection requirement — Insulation placement and R values
RAYMOND CALAMARI
11/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
RAYMOND CALAMARI
11/21/2024
Special inspection requirement — Fenestration air leakage
RAYMOND CALAMARI
11/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/31/2024
Objection resolved — Addressed
10/02/2024
Objection raised — Other
09/23/2024
Objection raised — Other
09/23/2024
Objection resolved — Addressed
09/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN07/02/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/27/2025
DOB NOWGeneral ConstructionSigned-offACE MAINTENANCE USA LLC12/26/2024
DOB NOWPlumbingSigned-offPLBG P & H INC09/13/2024
DOB NOWGeneral ConstructionPermit IssuedACE MAINTENANCE USA LLC09/04/2024
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC02/29/2024
DOB NOWGeneral ConstructionSigned-offCROWN BUILDER & CONSTRUCT02/06/2024
DOB NOWPlumbingSigned-offPLBG P & H INC08/15/2023
DOB NOWGeneral ConstructionPermit IssuedPR07/01/2023
DOB NOWGeneral ConstructionPermit IssuedPR06/14/2023
DOB NOWConstruction FencePermit IssuedPR05/30/2023
DOB NOWGeneral ConstructionSigned-offCROWN BUILDER & CONSTRUCT01/13/2023
BISPLISSUEDMASTER PLB AND HTG INC07/21/2005
BISEQISSUEDG D Y PROPERTIES INC06/15/2005
BIS—ISSUEDG D Y PROPERTIES INC06/15/2005
BIS—ISSUEDG.D.Y.PROPERITES INC06/09/2005
1 project · most recent 11/25/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/25/2025Signed-offACE MAINTENANCE USA LLCHeating and Air Conditioning Systems
Heat / Cool
Blueridge BMM18C 19,000 BTU · Heat Pump Outdoor ×6
BMM36C 37,000 BTU ×6
Mitsubishi Electric MXZ-2C20NAHZ4 120,000 BTU · Heat Pump Outdoor ×10
MXZ-2C2ONA4 40,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 03/26/2025
FiledStatusContractorScope
03/26/2025Signed-offPRIME PIPING & HEATING IN80 heads
1 project · most recent 03/26/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/26/2025Signed-offA M B MECHANICAL INCGas, Water/Sanitary
1 project · most recent 02/03/2025
General Wiring
FiledStatusContractorScope
02/03/2025CompleteROYAL ELEC'L CONTR'G CORPGeneral Wiring
1 project · most recent 11/25/2025
Steel Concrete Masonry
FiledStatusContractorScope
11/25/2025Signed-offACE MAINTENANCE USA LLCSteel, Concrete, Masonry
1 project · most recent 04/04/2023
Fence
FiledStatusContractorScope
04/04/2023Permit IssuedPRFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
01/22/2026Fail-Final CND-Occupancy InspectionFailView ↗
06/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
04/15/2025Sprinkler SystemsYounes Abouyaalaspecial
04/15/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/13/2025Sprinkler SystemsYounes Abouyaalaspecial
03/13/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/10/2025HVAC-R and service water heating equipmentRAYMOND CALAMARIenergy_progress
03/10/2025Fenestration and door U-factor and product ratingsRAYMOND CALAMARIenergy_progress
03/10/2025Fenestration air leakageRAYMOND CALAMARIenergy_progress
03/10/2025HVAC-R and service water piping design and insulationRAYMOND CALAMARIenergy_progress
03/10/2025Energy Code Compliance InspectionsRAYMOND CALAMARIprogress
03/10/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
03/10/2025Mechanical SystemsYounes Abouyaalaspecial
03/10/2025Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
03/10/2025FinalNAVEEN KUMARprogress
03/10/2025Insulation placement and R valuesRAYMOND CALAMARIenergy_progress
03/10/2025HVAC-R and service water heating system controlsRAYMOND CALAMARIenergy_progress
03/10/2025Lighting in dwelling unitsRAYMOND CALAMARIenergy_progress
01/30/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/30/2025Sprinkler SystemsYounes Abouyaalaspecial
11/21/2024FinalNAVEEN KUMARprogress
11/21/2024Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
11/21/2024Mechanical SystemsYounes Abouyaalaspecial
11/21/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
11/21/2024Energy Code Compliance InspectionsRAYMOND CALAMARIprogress
11/21/2024HVAC-R and service water heating system controlsRAYMOND CALAMARIenergy_progress
11/21/2024HVAC-R and service water heating equipmentRAYMOND CALAMARIenergy_progress
Latest 25 of 51.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/28/2026B08050518-I1Request digital key ↗
08/27/2026B00847379-I1Request digital key ↗
08/23/2026B00813844-P3Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/30/2024322119578Open ↗
▸Zoning, Tax Lot & Property Records22
▸DOB NOWZD1: DOB Zoning Diagram8
08/13/2026B08051086-P9Open ↗
08/13/2026B08051086-I1Open ↗
08/13/2026B08051086-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026B08051086-P7Open ↗
08/13/2026B08051086-P6Open ↗
08/13/2026B08051086-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 25
08/13/2026B08051086-P6Open ↗
08/13/2026B08051086-P9Open ↗
08/13/2026B08051086-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B08051086-I1Open ↗
08/13/2026B08051086-P9Open ↗
08/13/2026B08051086-P8Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08051086-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026B08051086-P6Open ↗
09/01/2026B08051086-P6Open ↗
09/01/2026B08051086-P6Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026B08050518-I1Open ↗
08/27/2026B00847379-I1Open ↗
08/23/2026B00813844-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B08051086-P6Open ↗
08/28/2026B08051086-P5Open ↗
08/27/2026B00813844-P1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/13/2026B08051086-P8Open ↗
08/13/2026B08051086-P9Open ↗
08/13/2026B08051086-P7Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist9
08/13/2026B08051086-P6Open ↗
08/13/2026B08051086-P7Open ↗
08/13/2026B08051086-P8Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION4
11/06/2024322119578Open ↗
11/06/2024322119578Open ↗
11/06/2024322119578Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/30/2024322119578Open ↗
▸Other Documents37
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone9
08/13/2026B08051086-I1Open ↗
08/13/2026B08051086-P6Open ↗
08/13/2026B08051086-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial9
08/13/2026B08051086-P3Open ↗
08/13/2026B08051086-P7Open ↗
08/13/2026B08051086-P8Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlot Diagram9
08/13/2026B08051086-P9Open ↗
08/13/2026B08051086-P1Open ↗
08/13/2026B08051086-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProperty Ownership Certification8
08/22/2026B08051086-I1Open ↗
08/22/2026B08051086-P3Open ↗
08/22/2026B08051086-P5Open ↗
Showing 3 of 8 on file for this type
▸BISPLOT DIAGRAM1
11/06/2024322119578Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08051086-I1Open ↗