← Back
Converted dwellings or rooming house
62 WEST 69 STREET
MANHATTAN · Upper West Side-Lincoln Square · BIN 1028476
💬 Discuss this project
1893Year Built
4Stories
C5Building Class
R8BZoning
6,120 sfGross Floor Area
9Units
Rent Stabilized1 Open Violation ▸
Converted dwellings or rooming house · Owner of record: 62 WEST 69TH STREET REALTY LLC · 2,008 sf lot · 3.05 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRUSCO REALTY MANAGEMENT LLC1207/08/2026
62 WEST 69TH STREET REALTY LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.303/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELL FUEL OIL, LLCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851303/13/2024
Building Lifecycle
All (27)Filed (3)Permit Issued (3)Signed Off (2)Violation (6)Inspection (3)Special Inspection (10)
11/17/2025
Violation issued (HPD, closed)
I
06/11/2024
Signed off — Alteration
M00644070-I1
06/11/2024
Signed off — Alteration
REGISTER WATER HEATERS AND CONNECT REPLACEMENT BOILER TO REPLACEMENT GAS PIPING.
M00644137-I1
04/01/2024
Violation issued (HPD, closed)
A
03/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/13/2024
Filed — Alteration
REGISTER WATER HEATERS AND CONNECT REPLACEMENT BOILER TO REPLACEMENT GAS PIPING.
M00644137-P1
03/13/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
03/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
03/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
03/04/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
03/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2024
Permit issued — Plumbing
M00644137-I1-PL
01/25/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/02/2022
Permit issued — Boiler Equipment
M00644070-I1-BE
01/11/2022
Permit issued — Plumbing
M00644137-I1-PL
12/29/2021
Filed — Alteration
M00644070-I1
12/28/2021
Filed — Alteration
REGISTER WATER HEATERS AND CONNECT REPLACEMENT BOILER TO REPLACEMENT GAS PIPING.
M00644137-I1
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC02/09/2024
DOB NOWBoiler EquipmentSigned-offAPPROVED ENERGY LLC02/02/2022
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC01/11/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/25/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/13/2024Maintenance informationLOUIS ARENAenergy_progress
03/13/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/13/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/13/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
03/13/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/04/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/04/2024Maintenance informationLOUIS ARENAenergy_progress
03/04/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/04/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/04/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026M00644137-I1Request digital key ↗
09/03/2026M00644137-P1Request digital key ↗
09/03/2026M00644070-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
09/03/2026M00644137-P1Open ↗
09/03/2026M00644137-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/03/2026M00644137-P1Open ↗
09/03/2026M00644137-I1Open ↗
09/03/2026M00644070-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026M00644137-I1Open ↗
08/26/2026M00644137-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026M00644137-I1Open ↗
08/26/2026M00644137-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00644137-I1Open ↗
09/03/2026M00644137-P1Open ↗
09/03/2026M00644070-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
09/03/2026M00644137-I1Open ↗