← Back
Converted dwellings or rooming house
62 WEST 85 STREET
MANHATTAN · Upper West Side (Central) · BIN 1031348
💬 Discuss this project
1889Year Built
4Stories
C5Building Class
R8BZoning
6,525 sfGross Floor Area
10Units
Rent Stabilized1 Open Violation ▸
Converted dwellings or rooming house · Owner of record: 62 WEST 85TH STREET REALTY LLC · 1,941 sf lot · 3.36 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof9p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JEMM MANAGEMENT1307/08/2026
62 WEST 85TH STREET REALTY LLC303/22/2026
ROITMAN REALTY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.807/17/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NAT'L MECH. SVCS PLBG LLCPlumbing207/08/2026
REAZ MOHAMMEDElectrical103/21/2026
STUART ISER, INCFire Protection103/21/2026
THE METRO GROUP, INCGeneral Contractor107/08/2026
THE METRO GROUP PLBG LLCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808507/17/2024
Building Lifecycle
All (56)Filed (8)Permit Issued (4)Violation (13)Inspection (5)Special Inspection (26)
07/17/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, closed)
I
06/04/2025
Violation issued (HPD, closed)
A
04/28/2025
Permit issued — Plumbing
M01035061-S1-PL
09/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2024
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER AND TWO (2) GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035061-P5
07/17/2024
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER AND TWO (2) GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035061-P4
07/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
07/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
07/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2024
Special inspection requirement — Chimneys and vents
Joseph Bazini
07/17/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
07/17/2024
Special inspection requirement — Final
Joseph Bazini
07/17/2024
Special inspection requirement — Chimneys and vents
Joseph Bazini
07/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
07/17/2024
Special inspection requirement — Final
Joseph Bazini
07/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
07/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
07/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/10/2024
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER AND TWO (2) GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035061-P3
07/10/2024
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER AND TWO (2) GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035061-P1
07/10/2024
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER AND TWO (2) GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035061-P2
07/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
06/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
06/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
06/26/2024
Special inspection requirement — Chimneys and vents
Joseph Bazini
06/26/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
06/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/26/2024
Special inspection requirement — Final
Joseph Bazini
06/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
05/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
05/01/2024
Permit issued — Mechanical Systems
M01035061-S2-MS
04/30/2024
Permit issued — Boiler Equipment
M01035061-I1-BE
04/30/2024
Permit issued — Plumbing
M01035061-S1-PL
04/22/2024
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER AND TWO (2) GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035061-S1
04/22/2024
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER AND TWO (2) GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035061-S2
04/22/2024
Filed — Alteration
REPLACE ONE (1) GAS-FIRED BOILER AND TWO (2) GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035061-I1
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
06/22/2020
Violation issued (HPD, closed)
C
06/22/2020
Violation issued (HPD, closed)
C
09/23/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/13/2001
Violation issued (ECB, closed)
Boilers
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTHE METRO GROUP PLBG LLC04/28/2025
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC05/01/2024
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC04/30/2024
DOB NOWPlumbingPermit IssuedNAT'L MECH. SVCS PLBG LLC04/30/2024
BISPLISSUEDFLINT MECHANICAL CORP05/22/2015
BISOTISSUEDNY MAINTENANCE CORP05/06/2014
BISPLISSUEDFLINT MECHANICAL CORP02/04/2014
BISMHISSUEDNY MAINTENANCE CORP12/10/2013
1 project · most recent 07/17/2024
Gas
FiledStatusContractorScope
07/17/2024Permit IssuedTHE METRO GROUP PLBG LLCGas
1 project · most recent 01/29/2024
FiledStatusContractorScope
01/29/2024Permit IssuedTHE METRO GROUP ELECTRIC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/17/2024Tenant Protection Plan Compliance—special
07/17/2024HVAC-R and service water heating system controls—energy_progress
07/17/2024HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
07/17/2024HVAC-R and service water piping design and insulation—energy_progress
07/17/2024Tenant Protection Plan Compliance—special
07/17/2024Chimneys and ventsJoseph Bazinispecial
07/17/2024Mechanical SystemsJoseph Bazinispecial
07/17/2024FinalJoseph Baziniprogress
07/17/2024Chimneys and ventsJoseph Bazinispecial
07/17/2024Tenant Protection Plan Compliance—special
07/17/2024Mechanical SystemsJoseph Bazinispecial
07/17/2024FinalJoseph Baziniprogress
07/17/2024Tenant Protection Plan Compliance—special
07/17/2024HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
07/17/2024HVAC-R and service water heating system controls—energy_progress
07/17/2024HVAC-R and service water piping design and insulation—energy_progress
06/26/2024HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
06/26/2024HVAC-R and service water heating system controls—energy_progress
06/26/2024Tenant Protection Plan Compliance—special
06/26/2024HVAC-R and service water piping design and insulation—energy_progress
06/26/2024Chimneys and ventsJoseph Bazinispecial
06/26/2024Mechanical SystemsJoseph Bazinispecial
06/26/2024Tenant Protection Plan Compliance—special
06/26/2024FinalJoseph Baziniprogress
05/14/2024Tenant Protection Plan ComplianceJoseph Bazinispecial
Latest 25 of 26.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026M01035061-S1Request digital key ↗
08/26/2026M01035061-I1Request digital key ↗
08/26/2026M01035061-P5Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit8
08/26/2026M01035061-I1Open ↗
08/26/2026M01035061-P3Open ↗
08/26/2026M01035061-P2Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
05/14/2014121629611Open ↗
02/07/2014121629611Open ↗
12/18/2013121629611Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
04/15/2014121629611Open ↗
07/26/2013121629611Open ↗
05/29/2013121629611Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/14/2015121629611Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026M01035061-I1Open ↗
08/26/2026M01035061-P3Open ↗
08/26/2026M01035061-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/10/2015121629611Open ↗
07/10/2015121629611Open ↗
07/10/2015121629611Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/29/2026M01035061-P3Open ↗
09/23/2026M01035061-I1Open ↗
08/25/2026M01035061-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/29/2026M01035061-P3Open ↗
08/25/2026M01035061-P5Open ↗
08/23/2026M01035061-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
07/30/2013121629611Open ↗
05/29/2013121629611Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
06/24/2015121629611Open ↗
05/06/2014121629611Open ↗
▸Safety & Tenant Protection1
▸BISDS1-Demolition Submittal Certification Form1
12/18/2013121629611Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026M01035061-I1Open ↗
08/26/2026M01035061-P3Open ↗
08/26/2026M01035061-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/29/2013121629611Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/10/2015121629611Open ↗
07/10/2015121629611Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/10/2015121629611Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
05/29/2013121629611Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/18/2013121629611Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/10/2015121629611Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
07/10/2015121629611Open ↗
12/04/2013121629611Open ↗
05/29/2013121629611Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
12/17/2013121629611Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
01/06/2015121629611Open ↗
05/03/2014121629611Open ↗
▸BISeFiling Job Application Cover Sheet1
05/29/2013121629611Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/14/2015121629611Open ↗