Office with commercial, 7-19 stories
62 William Street
62 WILLIAM STREET · BIN 1001013
💬 Discuss this project
1900Year Built
9Stories
O6Building Class
C5-5Zoning
42,000 sfGross Floor Area
10Units
LL97 Covered1 Open Violation ▸FISP: SAFEFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: B.M.S. REALTY ASSOCIATES INC. · 4,613 sf lot · 9.1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 2 filings · 13 docs
Floor 2Under Construction2p · 1 filing · 6 docs
Floor 1Under Construction8p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B M S REALTY ASSOCIATES5507/08/2026
CAPITAL GENERAL CONSTRUCTION304/09/2026
J G CONSTRUCTION SRVCS504/09/2026
CUSHMAN & WAKEFIELD203/22/2026
NAFSHI REALTORS CORP103/22/2026
SILVERCUPSCAFFOLDING103/21/2026
T-MOBILE103/21/2026
RMS REALTY ASS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AARON MCDONALD ARCHITECT305/06/2026
AZIMUTH ENGINEERING203/19/2026
ASHRAF CORP111/15/2024
ASR ENGINEERING PC111/13/2024
GBN ENGINEERING LLC203/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
BASIC GROUPS203/21/2026
CCM CONSULTING GROUP, INC.303/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor504/09/2026
J & G CONSTRUCTION SVCSGeneral Contractor204/09/2026
BECKER, CHARLESElectrical103/21/2026
CONTACT PLUS ELEC'L CORPElectrical103/22/2026
EGBERT BAPTISTEElectrical103/21/2026
FILARDI, JAMESElectrical103/21/2026
J Y ELECTRIC INCElectrical103/22/2026
MARIO CASTROElectrical103/21/2026
PEREIRA, WESLLEYElectrical103/21/2026
TROADIO MENENDEZElectrical103/21/2026
VIALVA, JOSEPHElectrical103/21/2026
A CELL COMMUNICATIONS INCGeneral Contractor107/08/2026
CAPITAL GENERAL CONSTRUCTGeneral Contractor104/09/2026
DAVRIAL ENTERPRISES INCGeneral Contractor104/12/2026
ALPHONSE, MICHAELElectrical103/21/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
ARTHUR GROSSMANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AARON MCDONALD ARCHITECT5118205/06/2026
JEREMY K MCKEON, P.E.7263203/19/2026
ASR ENGINEERING PC8404111/13/2024
GBN ENGINEERING LLC4670403/21/2024
NIC 88 CORP8371101/05/2024
Building Lifecycle
All (118)Filed (9)Permit Issued (9)Signed Off (3)Facade (FISP) (12)Violation (60)Inspection (11)Objection (12)Special Inspection (2)
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
05/06/2026
Filed — Alteration
INSTALL GAS AND PLUMBING FIXTURES ON 1ST FLOOR, PLUMBING WORKS AS PER PLAN. NO CHANGE ON EGRESS, USE, OR OCCUPANCY.
M01348915-P1
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
04/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Cycle 10 facade inspection completed
04/14/2026
Cycle 10 facade report signed — SAFE
04/10/2026
Permit issued — Antenna
M01118160-I1-AN
03/19/2026
Filed — Alteration
T-Mobile: Relocation of existing antenna sector and installation of kickbacks on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
M01118160-P1
02/19/2026
Violation issued (ECB, closed)
Construction
01/27/2026
Signed off — Alteration
M01139454-I1
01/26/2026
Permit issued — Plumbing
M01348915-I1-PL
01/23/2026
Filed — Alteration
INSTALL GAS AND PLUMBING FIXTURES ON 1ST FLOOR, PLUMBING WORKS AS PER PLAN. NO CHANGE ON EGRESS, USE, OR OCCUPANCY.
M01348915-I1
12/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/02/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2025
Cycle 10 facade report submitted
10/15/2025
Signed off — Alteration
M01141115-I1
06/17/2025
Objection resolved — Addressed
06/17/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Zoning
05/29/2025
Objection raised — Scope
05/13/2025
Filed — Alteration
T-Mobile: Relocation of existing antenna sector and installation of kickbacks on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
M01118160-I1
04/17/2025
Violation issued (ECB, closed)
Local Law
03/27/2025
Permit issued — General Construction
M00986092-I1-GC
01/13/2025
Permit issued — General Construction
M00986092-I1-GC
12/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2024
Permit issued — Sidewalk Shed
M01141115-I1-SH
11/18/2024
Permit issued — Sidewalk Shed
M01141115-I1-SF
11/18/2024
Permit issued — General Construction
M01139454-I1-GC
11/15/2024
Filed — Alteration
M01141115-I1
11/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2024
Filed — Alteration
M01139454-I1
08/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
05/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2024
Signed off — Alteration
Dish-Installation of new antenna sectors, GPS antenna & equip. cabinet in the existing platform on the roof. Existing conduits & service room connection to be utilized as per plans. All work is in compliance with 5/98.No change in use, egress or occupancy
M00752176-I1
03/21/2024
Filed — Alteration
Dish-Installation of new antenna sectors, GPS antenna & equip. cabinet in the existing platform on the roof. Existing conduits & service room connection to be utilized as per plans. All work is in compliance with 5/98.No change in use, egress or occupancy
M00752176-P1
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/10/2024
Permit issued — General Construction
M00986092-I1-GC
01/05/2024
Filed — Alteration
M00986092-I1
08/24/2022
Permit issued — Antenna
M00752176-I1-AN
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection resolved — Addressed
07/14/2022
Objection raised — Zoning
07/14/2022
Objection raised — Inspections
07/11/2022
Objection raised — Scope
07/11/2022
Objection raised — Zoning
06/30/2022
Filed — Alteration
Dish-Installation of new antenna sectors, GPS antenna & equip. cabinet in the existing platform on the roof. Existing conduits & service room connection to be utilized as per plans. All work is in compliance with 5/98.No change in use, egress or occupancy
M00752176-I1
02/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/03/2019
Violation issued (ECB, closed)
Construction
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/25/2018
Cycle 8 facade inspection completed
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offDAVRIAL ENTERPRISES INC04/10/2026
DOB NOWPlumbingPermit IssuedW.R. PLBG AND HTG CORP01/26/2026
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY03/27/2025
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY01/13/2025
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS11/18/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS11/18/2024
DOB NOWGeneral ConstructionSigned-offCAPITAL GENERAL CONSTRUCT11/18/2024
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY01/10/2024
DOB NOWAntennaSigned-offA CELL COMMUNICATIONS INC08/24/2022
BISPLISSUEDARCON PLBG SOLUTIONS10/17/2017
BISMHISSUEDRIVERSIDE BUILDERS INC09/26/2017
BISOTISSUEDRIVERSIDE BUILDERS INC09/26/2017
BISOTISSUEDTELCOM ENGINEERING GP INC05/22/2017
BISOTISSUEDARCO GENERAL CONTRACTOR INC01/05/2017
BISOTISSUEDNYC RIGGER CONSTRUCTION10/31/2016
BISEQISSUEDSILVERCUP SCAFFOLDING 1 L08/03/2016
BISOTISSUEDODYSSIA GLOBAL COMM. CORP10/15/2012
BISOTISSUEDG AND M PLUMBING CONTRACT03/12/2012
BISOTISSUEDDRW CONSOLIDATED INC02/03/2012
BISOTISSUEDRAMAPO COMMUNICATION CORP03/31/2009
BISOTISSUEDBCI COMMUNICATIONS INC01/12/2009
BISOTISSUEDBCI COMMUNICATIONS INC04/04/2008
BISOTISSUEDBCI COMMUNICATIONS INC09/11/2007
BISOTISSUEDSBA COMMUNICATIONS CORP09/15/2005
BISFPISSUEDIDEAL FIRE CONTROL INC04/12/2001
BISPLISSUEDTHEODORE WAGNER PLBG & HTG12/27/2000
BISOTISSUEDA. A;PHA PETER CONTR. INC.12/18/2000
BISOTISSUEDCUSHMAN & WAKEFIELD12/24/1996
BISSPISSUEDASHLAND PLUMBING AND HTG CO.08/25/1995
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS05/04/1995
BISMHISSUEDVINOD H. DHOLAKIA-ARCH., P.C.04/06/1995
BISSPISSUEDFIRE PREVENTION PROD. COR03/03/1995
BISSPISSUEDFIRE PREVENTION PROD. COR09/29/1994
BISSPISSUEDNATIONAL SPRINKLER CORP.04/22/1994
BISFPISSUEDB & J FIRE ,INC.04/06/1994
BISOTISSUEDJLS FACILITES SERVICES INC10/14/1993
BISMHISSUEDJLS FACILITES SERVICES INC10/14/1993
BISMHISSUEDVERDERAME CONSTRUCTION04/08/1993
BISOTISSUEDASSERTIVE INTERIOR CONTRACTORS C07/12/1991
1 project · most recent 05/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/06/2026Permit IssuedW.R. PLBG AND HTG CORPGas, Water/Sanitary
5 projects · most recent 06/09/2025
General Wiring
FiledStatusContractorScope
06/09/2025CompleteJ Y ELECTRIC INC—
11/18/2024Permit IssuedRICHARD NEU—
10/14/2022CompletePOWERONE ELECT'L CONTRGGeneral Wiring
12/24/2018Permit IssuedCONTACT PLUS ELEC'L CORP—
01/02/2018CompleteP & Z ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
05/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/08/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
05/05/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
▾Documents — 143 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026M00986092-I1Request digital key ↗
08/27/2026M00752176-P1Request digital key ↗
08/25/2026M01139454-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION11
08/03/2018122234475Open ↗
09/22/2017123182457Open ↗
09/22/2017123182457Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION10
10/18/2017123182457Open ↗
09/27/2017123182457Open ↗
09/27/2017123182457Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications39
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
10/22/2018123182457Open ↗
10/22/2018123182457Open ↗
08/21/2018122234475Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026M00986092-I1Open ↗
08/27/2026M00752176-I1Open ↗
08/27/2026M00752176-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/22/2017123182457Open ↗
09/22/2017123182457Open ↗
01/03/2017122971230Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/22/2017123182457Open ↗
01/03/2017122971230Open ↗
02/06/2012120969443Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/27/2016140568776Open ↗
08/02/2016140528258Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/27/2016140568776Open ↗
08/02/2016140528258Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026M01348915-I1Open ↗
09/01/2026M01348915-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/06/2012120969443Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/22/2017123182457Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/01/2012121061661Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026M00986092-I1Open ↗
08/27/2026M00752176-P1Open ↗
08/18/2026M01118160-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/22/2017123182457Open ↗
01/03/2017122971230Open ↗
10/27/2016140568776Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
05/01/2012121061661Open ↗
02/06/2012120969443Open ↗
03/11/2009110474086Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
10/22/2018123182457Open ↗
08/21/2018122234475Open ↗
09/27/2017123182457Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
10/22/2018123182457Open ↗
08/21/2018122234475Open ↗
08/11/2017140568776Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
05/01/2012121061661Open ↗
02/06/2012120969443Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/02/2016140528258Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/27/2016140568776Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/27/2016140568776Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/31/2016140568776Open ↗
10/27/2016140568776Open ↗
08/02/2016140528258Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/22/2018123182457Open ↗
08/21/2018122234475Open ↗
08/11/2017140568776Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
05/07/2012121061661Open ↗
02/06/2012120969443Open ↗
03/11/2009110474086Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/11/2017140568776Open ↗
03/15/2012120969443Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
10/22/2018123182457Open ↗
08/21/2018122234475Open ↗
09/22/2017123182457Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET6
09/22/2017123182457Open ↗
09/22/2017123182457Open ↗
01/03/2017122971230Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
10/22/2018123182457Open ↗
08/21/2018122234475Open ↗
08/03/2018122234475Open ↗
▸BISADDITIONAL INFORMATION3
07/01/2016122234475Open ↗
07/01/2016122234475Open ↗
02/16/2012120969443Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
10/27/2016140568776Open ↗
08/02/2016140528258Open ↗
▸Other Documents1
▸BISACCESSIBILITY WAIVER (PEO1)1
08/08/2016122234475Open ↗