Elevator cooperative
Tanya Towers
620 EAST 13 STREET · East Village · BIN 1004927
💬 Discuss this project
1973Year Built
10Stories
D4Building Class
R7-2Zoning
100,860 sfGross Floor Area
138Units
LL97 CoveredRent Stabilized38 Open Violations 34 unresolved · 4 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: TANYA TOWERS · 22,715 sf lot · 4.44 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 10 docs
Site & exteriorUnder Construction10p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TANYA TOWERS3003/22/2026
TANYA TOWERS INC C O FEGS403/21/2026
SETTLEMENT HOUSING FUND, INC.309/13/2026
NEW CENTURY CONSTRUCTION CORP.303/21/2026
popwheels204/09/2026
NYC Housing Authority203/21/2026
AAA MANAGEMENT CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LINGINEERING CONSULTING103/17/2026
BEAM ARCHITECTS D.P.C.101/15/2026
BAILEYS ENGINEERING PC104/07/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CES & COMPANY203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
MICHAEL THOMPSONElectrical103/21/2026
THOMPSON MICHAELElectrical103/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor109/13/2026
LAZARUS HOME IMPROVEMENTGeneral Contractor104/09/2026
POFI CONSTRUCTION CORPGeneral Contractor108/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LINGINEERING CONSULTING E5666103/17/2026
AG ENGINEERING PLLC8899101/15/2026
Building Lifecycle
All (104)Filed (4)Permit Issued (6)Signed Off (1)Facade (FISP) (15)Violation (60)Inspection (1)Objection (8)Special Inspection (9)
09/11/2026
Permit issued — Sidewalk Shed
M01454568-I1-SH
08/18/2026
Permit issued — General Construction
M01362697-I1-GC
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
B
08/14/2026
Violation issued (HPD, open)
B
08/14/2026
Violation issued (HPD, open)
B
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
B
08/14/2026
Violation issued (HPD, open)
B
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
07/15/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/01/2026
Permit issued — Suspended Scaffold
M01362697-S1-SC
06/18/2026
Filed — Alteration
WINDOW LINTEL RELIEVING ANGLE REPLACEMENT/ REFURBISHMENT , WINDOWSILL REPLACEMENT SELECTIVE BRICK REPLACEMENT AND CONCRETE PATCHING.
M01362697-S1
06/17/2026
Special inspection requirement — Post-installed anchors in masonry
George Xerakias
06/17/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
03/23/2026
Permit issued — General Construction
M01344202-I1-GC
03/17/2026
Filed — Alteration
WINDOW LINTEL RELIEVING ANGLE REPLACEMENT/ REFURBISHMENT , WINDOWSILL REPLACEMENT SELECTIVE BRICK REPLACEMENT AND CONCRETE PATCHING.
M01362697-I1
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
02/20/2026
Special inspection requirement — Masonry
Chingyuan Lin
02/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
Chingyuan Lin
02/20/2026
Special inspection requirement — Final
Chingyuan Lin
02/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chingyuan Lin
02/20/2026
Special inspection requirement — Concrete - Cast-In-Place
Chingyuan Lin
02/06/2026
Objection raised — Zoning
02/06/2026
Objection raised — Zoning
02/06/2026
Objection raised — Electrical
02/06/2026
Objection raised — Admin
01/23/2026
Violation issued (HPD, closed)
B
01/15/2026
Filed — Alteration
General construction work for (2) exterior battery containment enclosures per BB 2025-009. No change to use, egress, or occupancy.
M01344202-I1
01/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
01/08/2026
Special inspection requirement — Final
ARIEL GOLSHAN
09/30/2025
Violation issued (HPD, closed)
B
09/30/2025
Violation issued (HPD, closed)
C
06/04/2025
Violation issued (HPD, open)
C
03/05/2025
Violation issued (HPD, closed)
C
01/24/2025
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, closed)
C
11/01/2024
Violation issued (HPD, closed)
C
11/01/2024
Violation issued (HPD, closed)
C
10/11/2024
Violation issued (HPD, closed)
B
10/11/2024
Violation issued (HPD, closed)
C
10/11/2024
Violation issued (HPD, open)
A
10/11/2024
Violation issued (HPD, closed)
B
10/11/2024
Violation issued (HPD, closed)
A
10/11/2024
Violation issued (HPD, closed)
B
10/11/2024
Violation issued (HPD, closed)
B
10/11/2024
Violation issued (HPD, closed)
B
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC09/11/2026
DOB NOWGeneral ConstructionPermit IssuedPOFI CONSTRUCTION CORP08/18/2026
DOB NOWSuspended ScaffoldPermit IssuedPOFI CONSTRUCTION CORP07/01/2026
DOB NOWGeneral ConstructionPermit IssuedLAZARUS HOME IMPROVEMENT03/23/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/09/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/09/2018
BISSPISSUEDNEW YORK PLBG-HTG-COOL C03/12/2025
BISPLISSUEDNEW YORK PLBG-HTG-COOLING03/12/2025
BISOTISSUEDSKYLINE RESTORATION INC03/15/2019
BISPLISSUEDDEMAR PLUMBING CORP04/19/2018
BISOTISSUEDSKYLINE RESTORATION INC04/16/2018
BISEQISSUEDL & M BUILDERS GROUP LLC04/10/2018
BIS—ISSUEDL & M BUILDERS GROUP LLC04/10/2018
BISBLISSUEDSTUART N SCHWARTZ02/19/2014
BISPLISSUEDTRADELINE PLUMBING INC02/19/2014
BIS—ISSUEDA.W. & S. CONSTRUCTION CO06/28/2013
BISEQISSUEDA.W. & S. CONSTRUCTION CO06/28/2013
BISPLISSUEDDEMAR PLUMBING CORP03/07/2013
BISSPISSUEDASCO SPRINKLER CO.,INC09/04/2012
BISBLISSUEDSTUART N SCHWARTZ07/26/2012
BISPLISSUEDTRADELINE PLUMBING INC07/26/2012
BISOTISSUEDMILLENIUM RESTORATION CORP06/22/2012
BISEQISSUEDA.W. & S. CONSTRUCTION CO06/19/2012
BIS—ISSUEDA.W. & S. CONSTRUCTION CO06/19/2012
BISEQISSUEDCS BRIDGE CORP03/27/2012
BISOTISSUEDA S K CONSTRUCTION INC02/02/2012
BISPLISSUEDDEMAR PLUMBING CORP01/19/2012
BISEQISSUEDA.W. & S. CONSTRUCTION CO11/30/2011
BIS—ISSUEDA.W. & S. CONSTRUCTION CO11/30/2011
BISEQISSUEDCS BRIDGE CORP08/05/2011
BISPLISSUEDMJM PLUMBING INC07/27/2011
BISPLISSUEDTRADELINE PLUMBING INC06/10/2011
BISMHISSUEDSNS ORGNIZATION LTD04/21/2011
BISPLISSUEDMJM PLUMBING INC03/05/2007
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM10/20/2004
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM09/14/2004
BISEQISSUEDNEW CENTURY CONSTRUCTION CORP.01/08/1998
BISEQISSUEDNEW CENTURY CONSTRUCTION CORP.11/07/1997
5 projects · most recent 09/01/2026
General Wiring
FiledStatusContractorScope
09/01/2026Permit IssuedBOROWIDE ELECT'L CONTR'S—
05/05/2026Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
12/16/2025Permit IssuedDENMAR ELECTRIC CORPGeneral Wiring
04/23/2018CompleteJTE ELECTRICAL SERVICES—
04/05/2018CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 06/18/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/18/2026Permit IssuedPOFI CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/15/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/17/2026Post-installed anchors in masonryGeorge Xerakiasspecial
06/17/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
02/20/2026MasonryChingyuan Linspecial
02/20/2026Tenant Protection Plan ComplianceChingyuan Linspecial
02/20/2026FinalChingyuan Linprogress
02/20/2026Structural Stability – Alterations of existing buildingsChingyuan Linspecial
02/20/2026Concrete - Cast-In-PlaceChingyuan Linspecial
01/08/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
01/08/2026FinalARIEL GOLSHANprogress
▾Documents — 219 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/06/2026M00032919-I1Request digital key ↗
08/19/2026M01344202-I1Request digital key ↗
08/18/2026M01362697-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits62
▸BISPLAN / WORK APPROVAL APPLICATION36
10/28/2025120362115Open ↗
11/15/2024120362115Open ↗
11/01/2024120609840Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION25
03/12/2025120362115Open ↗
03/12/2025120609840Open ↗
05/23/2018120362115Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/29/2025120362115Open ↗
▸Seals & Professional Certifications35
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
09/13/2019140756670Open ↗
03/06/2018120362115Open ↗
02/20/2018120362115Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026M01344202-I1Open ↗
08/28/2026M01362697-I1Open ↗
08/27/2026M01362697-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/06/2026M00032919-I1Open ↗
08/19/2026M01344202-I1Open ↗
08/18/2026M01362697-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/02/2012121020475Open ↗
08/12/2011120772351Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/02/2012121020475Open ↗
09/09/2011120772351Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026M01344202-I1Open ↗
08/28/2026M01362697-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/12/2018140756670Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/12/2018140756670Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/12/2018140756670Open ↗
▸Trade Schedules & Equipment17
▸BISSELF-CERT PLUMBING NOTICE6
07/17/2014120432503Open ↗
06/26/2013120609840Open ↗
09/13/2012120432503Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
04/26/2012120432503Open ↗
02/23/2012120432503Open ↗
02/08/2011120609840Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/23/2012120432503Open ↗
08/24/2010120432503Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
09/22/2025120609840Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/05/2025120362115Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/05/2025120362115Open ↗
▸BISSPRINKLER SYSTEMS1
09/05/2025120609840Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
03/06/2018120362115Open ↗
04/16/2018140756670Open ↗
▸Environmental & Asbestos11
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
12/28/2010120564549Open ↗
08/09/2010120432503Open ↗
07/01/2010120398408Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS INSPECTION REPORT2
02/08/2011120609840Open ↗
02/08/2011120609840Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
04/02/2012121020475Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/12/2018140756670Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026M01362697-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/13/2019140756670Open ↗
03/06/2018120362115Open ↗
06/04/2012121087803Open ↗
▸BISTECHNICAL REPORT: ENERGY2
05/24/2011120564549Open ↗
05/24/2011120564549Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/05/2025120362115Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/18/2024120362115Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/12/2018140756670Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/13/2019140756670Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/12/2018140756670Open ↗
▸BISMECHANICAL SYSTEMS1
09/05/2025120362115Open ↗
▸Approvals, Objections & Sign-offs31
▸BISADMINISTRATIVE OBJECTIONS9
06/04/2012121087803Open ↗
04/02/2012121020475Open ↗
08/12/2011120772351Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
10/28/2025120362115Open ↗
11/15/2024120362115Open ↗
10/30/2024120362115Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER6
03/12/2025120609840Open ↗
03/12/2025120362115Open ↗
03/07/2025120609840Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
09/22/2025120609840Open ↗
09/13/2019140756670Open ↗
12/16/2011120772351Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/10/2014120432503Open ↗
12/16/2011120772351Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/06/2026M00032919-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT13
02/14/2020120362115Open ↗
09/13/2019140756670Open ↗
12/03/2018140756670Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/10/2025120609840Open ↗
▸Filing & Intake Forms27
▸BISADDITIONAL INFORMATION12
12/05/2024120609840Open ↗
12/02/2024120609840Open ↗
11/14/2024120362115Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET9
06/04/2012121087803Open ↗
04/02/2012121020475Open ↗
08/12/2011120772351Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
02/14/2020120362115Open ↗
09/13/2019140756670Open ↗
12/03/2018140756670Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/12/2018140756670Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/01/2010120398408Open ↗
▸Other Documents5
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
09/05/2025120362115Open ↗
▸BISPLOT DIAGRAM1
05/27/2010120362115Open ↗
▸BISSHUTOFF DAMPERS1
09/05/2025120362115Open ↗
▸DOB NOWManufacturer's Specifications1
08/18/2026M01362697-S1Open ↗
▸DOB NOWCalculations1
08/18/2026M01362697-S1Open ↗