BuildNYC
Office with commercial, 7-19 stories
Rockefeller Center
620 FIFTH AVENUE · BIN 1075692
💬 Discuss this project
1937Year Built
9Stories
O6Building Class
C5-2.5Zoning
272,637 sfGross Floor Area
61Units
LL97 Covered1 Active Violation ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: Rcpi Landmark Properties, LLC Attn: Tracey Frazzetta · 63,261 sf lot · 4.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRcpi Landmark Properties, LLC39p · 25 filings · 20 docs
Floor 62Sprinkler modification in cellar1p · 1 filing · 7 docs
Floor 61
Floor 60
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33Sprinkler head and piping modification1p · 1 filing · 8 docs
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Rcpi Landmark Properties, LLC2p · 1 filing · 5 docs
Floor 78p · 25 filings · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Elf Hero, Laduree +4Under Construction62p · 25 filings · 20 docs
CellarJupiter Restaurant, King Restaurant +2Under Construction231p · 24 filings · 20 docs
Sub-CellarKing Restaurant137p · 11 filings · 20 docs
BasementJupiter RestaurantUnder Construction13p · 6 filings · 20 docs
Sub-BasementJupiter Restaurant, NBC Universal +1Under Construction171p · 25 filings · 20 docs
Site & exteriorNBC Sports Olympic Watch Party, Cole Haan +213p · 6 filings · 20 docs
Filed — no permit issuedIRA condition assessment1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Tishman Speyer Properties12810/09/2026
Rcpi Trust4003/21/2026
Rockefeller Center Properties1203/21/2026
30 Rockefeller Plaza507/08/2026
Rcpi403/21/2026
R & S Associates403/21/2026
Vornado Realty Trust103/21/2026
Rcpi Landmark103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gillman Consulting7603/21/2026
Walter T Gorman PE23203/21/2026
Municipal Building Consultants803/21/2026
Codegreen403/21/2026
All in Permit Consultants203/21/2026
George E Berger Ass603/21/2026
Walter T Gorman Pepc3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vanguard Construction andGeneral Contractor1207/08/2026
NYFF EventsGeneral Contractor807/08/2026
Turner Construction CompanyGeneral Contractor707/08/2026
Tristate Plumbing ServicesPlumbing610/04/2026
Pace PlumbingFire Protection607/08/2026
Go Green ConstructionGeneral Contractor407/08/2026
Winick ProductionsGeneral Contractor407/08/2026
New Gen BuildersGeneral Contractor407/08/2026
Malbro Construction ServicesGeneral Contractor303/21/2026
Weickert IndGeneral Contractor303/21/2026
Mercury Fire SuppPlumbing303/22/2026
Schimenti Construction CoGeneral Contractor304/09/2026
William C. Gerakaris P&HPlumbing207/08/2026
CJS IndustriesGeneral Contractor203/21/2026
G.B.CGeneral Contractor204/09/2026
Yad Realty ManagementGeneral Contractor207/08/2026
National MaintenanceSign hanger207/08/2026
Allstate SprinklerFire Protection207/08/2026
Geoffrey A. Lagas & AssociatesPlumbing207/08/2026
Egg ElectricElectrical203/21/2026
A&A PlumbingPlumbing107/08/2026
Abco-Peerless SprinklerFire Protection107/08/2026
Aggressive Fire ProtectionFire Protection107/08/2026
Arena Event ServicesGeneral Contractor107/08/2026
Full Capacity FireFire Protection107/08/2026
V & M Drain CleaningPlumbing107/08/2026
Hudson Plumbing & MCHPlumbing107/08/2026
Innovation PlumbingPlumbing107/08/2026
Mercury Fire SuppFire Protection107/08/2026
Metro Fire ProtectionFire Protection107/08/2026
Tema Builders GroupGeneral Contractor104/09/2026
Sconda Canvas ProductsGeneral Contractor107/08/2026
ConstructomicsGeneral Contractor107/08/2026
Royal Concrete and Mason*specialty_contractor104/09/2026
RRP PlumbingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rakshan Malek Associates3352307/23/2026
Walter T. Gorman, P.E., P2681805/27/2026
Future Tech Consultants O5891901/09/2024
Codegreen510304/06/2022
Catalpa Special Inspectio2004302/16/2022
Building Lifecycle
All (300)Filed (70)Permit Issued (55)Signed Off (29)Violation (8)Inspection (29)Objection (79)Special Inspection (30)
10/20/2026
Permit issued — General Construction
M01465383-I1-GC
10/08/2026
Filed — No Work
M01465384-I1
10/08/2026
Filed — Alteration
Temporary Installation and removal of temporary walls to be used on a temporary event " The ELF Experience". All the Walls are to be removed upon completion of the event.
M01465383-I1
08/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2026
Filed — Alteration
Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01295746-P1
07/17/2026
Filed — No Work
M01431876-I1
06/25/2026
Violation issued (ECB, open)
Construction
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARYAM RAKSHAN
06/24/2026
Special inspection requirement — Sprinkler Systems
MARYAM RAKSHAN
06/16/2026
Signed off — Alteration
Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01295746-I1
05/27/2026
Filed — Alteration
Alterations to sprinkler system in existing skate hut in basement as per plans. No change to use, egress or occupancy.
M01343796-P1
05/27/2026
Special inspection requirement — Post-installed Anchors
Walter Gorman
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
05/27/2026
Special inspection requirement — Sprinkler Systems
Walter Gorman
05/22/2026
Special inspection requirement — Post-installed Anchors
Walter Gorman
05/22/2026
Special inspection requirement — Sprinkler Systems
Walter Gorman
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
05/18/2026
Filed — Alteration
IRA to assist with Condition Assessment
M01403850-I1
04/23/2026
Signed off — Alteration
Roof replacement on 8th floor as per plans. No change to use, egress or occupancy.
M01270117-I1
04/16/2026
Permit issued — Plumbing
M01343799-I1-PL
04/09/2026
Permit issued — Sprinklers
M01343796-I1-EW-SP
03/31/2026
Signed off — Alteration
Interior renovation on suite ST03. as per plans. No change to use, egress or occupancy.
M01250650-I1
03/27/2026
Permit issued — Structural
M01344005-I1-ST
03/27/2026
Permit issued — Mechanical Systems
M01343791-I1-MS
03/27/2026
Permit issued — General Construction
M01343770-I1-GC
03/24/2026
Filed — No Work
M01376755-I1
02/24/2026
Filed — Alteration
Structural work in existing skate hut in basement as per plans. No change to use, egress or occupancy.
M01344005-I1
02/19/2026
Filed — Alteration
M01343799-I1
02/19/2026
Filed — Alteration
M01343770-I1
02/19/2026
Filed — Alteration
Alterations to sprinkler system in existing skate hut in basement as per plans. No change to use, egress or occupancy.
M01343796-I1
02/19/2026
Filed — Alteration
M01343791-I1
02/03/2026
Special inspection requirement — Concrete - Cast-In-Place
Walter Gorman
02/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walter Gorman
02/03/2026
Special inspection requirement — Structural Steel - Welding
Walter Gorman
02/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Walter Gorman
01/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
01/26/2026
Special inspection requirement — Structural Steel - Details
Walter Gorman
01/26/2026
Special inspection requirement — Structural Cold-Formed Steel
Walter Gorman
01/08/2026
Special inspection requirement — Final
Walter Gorman
01/08/2026
Special inspection requirement — Mechanical Systems
Walter Gorman
01/08/2026
Special inspection requirement — Final
Walter Gorman
12/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/18/2025
Filed — No Work
M01336016-I1
12/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/16/2025
Signed off — Alteration
Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01295746-S2
12/16/2025
Signed off — Alteration
Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01295746-S1
12/03/2025
Permit issued — Sprinklers
M01295746-S3-EW-SP
11/26/2025
Filed — No Work
M01322084-I1
11/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/13/2025
Filed — No Work
M01317780-I1
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/24/2025
Permit issued — Plumbing
M01295746-S2-PL
10/23/2025
Permit issued — Mechanical Systems
M01295746-S1-MS
10/16/2025
Permit issued — General Construction
M01295746-I1-GC
10/15/2025
Filed — Alteration
Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01295746-S2
10/15/2025
Filed — Alteration
Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01295746-S3
10/10/2025
Filed — Alteration
Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01295746-S1
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
MARYAM RAKSHAN
10/08/2025
Filed — Alteration
Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
M01295746-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNYFF Events10/20/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing04/16/2026
DOB NOWSprinklersPermit IssuedAllstate Sprinkler04/09/2026
DOB NOWStructuralPermit IssuedSchimenti Construction Co03/27/2026
DOB NOWMechanical SystemsPermit IssuedSchimenti Construction Co03/27/2026
DOB NOWGeneral ConstructionPermit IssuedSchimenti Construction Co03/27/2026
DOB NOWSprinklersSigned-offMercury Fire Supp12/03/2025
DOB NOWPlumbingSigned-offV & M Drain Cleaning10/24/2025
DOB NOWMechanical SystemsSigned-offG.B.C10/23/2025
DOB NOWGeneral ConstructionSigned-offG.B.C10/16/2025
DOB NOWGeneral ConstructionSigned-offRoyal Concrete and Mason*10/07/2025
DOB NOWGeneral ConstructionSigned-offTema Builders Group09/08/2025
DOB NOWGeneral ConstructionPermit IssuedNYFF Events08/12/2025
DOB NOWGeneral ConstructionSigned-offNYFF Events01/14/2025
DOB NOWGeneral ConstructionSigned-offNYFF Events08/02/2024
DOB NOWGeneral ConstructionSigned-offWinick Productions07/17/2024
DOB NOWGeneral ConstructionSigned-offSconda Canvas Products05/16/2024
DOB NOWGeneral ConstructionSigned-offNYFF Events04/29/2024
DOB NOWSignSigned-offNational Maintenance03/15/2024
DOB NOWSignSigned-offNational Maintenance03/15/2024
DOB NOWGeneral ConstructionSigned-offNYFF Events12/01/2023
DOB NOWPlumbingSigned-offTristate Plumbing Services10/20/2023
DOB NOWGeneral ConstructionSigned-offNYFF Events10/17/2023
DOB NOWSprinklersSigned-offManengeering Bureau05/08/2023
DOB NOWSprinklersSigned-offManengeering Bureau05/08/2023
DOB NOWSprinklersSigned-offRalph W. Landolfi JR04/05/2023
DOB NOWPlumbingSigned-offInnovation Plumbing04/05/2023
DOB NOWGeneral ConstructionSigned-offWinick Productions03/30/2023
DOB NOWGeneral ConstructionSigned-offYad Realty Management01/24/2023
DOB NOWMechanical SystemsSigned-offYad Realty Management01/19/2023
DOB NOWMechanical SystemsSigned-offNew Gen Builders12/06/2022
DOB NOWPlumbingSigned-offWilliam C. Gerakaris P&H11/03/2022
DOB NOWGeneral ConstructionSigned-offNew Gen Builders09/29/2022
DOB NOWSprinklersSigned-offFull Capacity Fire06/30/2022
DOB NOWMechanical SystemsSigned-offVanguard Construction and06/29/2022
DOB NOWGeneral ConstructionSigned-offVanguard Construction and06/28/2022
DOB NOWMechanical SystemsSigned-offVanguard Construction and06/24/2022
DOB NOWStructuralPermit IssuedVanguard Construction and06/24/2022
DOB NOWGeneral ConstructionSigned-offVanguard Construction and06/24/2022
DOB NOWMechanical SystemsSigned-offMalbro Construction Services05/10/2022
+ 60 more permits on file
3 projects · most recent 07/23/2026
FiledStatusContractorScope
07/23/2026Signed-offMercury Fire Supp—
05/27/2026Permit IssuedAllstate Sprinkler—
01/20/2021Signed-offAggressive Fire Protection402 heads
2 projects · most recent 07/23/2026
Water/Sanitary
FiledStatusContractorScope
07/23/2026Signed-offV & M Drain CleaningWater/Sanitary
01/20/2021Permit IssuedGeoffrey A. Lagas & AssociatesWater/Sanitary
18 projects · most recent 04/14/2026
General Wiring Lighting
FiledStatusContractorScope
04/14/2026Permit IssuedM.C. Electrical NYGeneral Wiring
03/23/2026CompleteTwintech ElectricGeneral Wiring
10/02/2023CompleteWebsite ElectricGeneral Wiring
04/23/2023CompleteAtmos Electric SvceGeneral Wiring
12/12/2022Permit IssuedY.S. ElectricGeneral Wiring, Lighting
06/29/2022CompleteCedar Electrical Contractors—
06/27/2022CompleteLebo ElectricGeneral Wiring
12/13/2021Permit IssuedCedar Electrical ContractorsGeneral Wiring
12/02/2021CompleteAlba ElectricGeneral Wiring
06/16/2021CompleteR.C.M. Electric—
03/24/2021CompleteTouchtel Technology GroupGeneral Wiring
02/23/2021Permit IssuedM.C. Electrical NYGeneral Wiring
11/17/2020CompleteHorsepower Electric—
07/08/2020Permit IssuedAtlas-Acon Electric ServiceGeneral Wiring
03/17/2020Permit IssuedAtlas-Acon Electric Service—
1 project · most recent 02/24/2026
Steel Concrete
FiledStatusContractorScope
02/24/2026Permit IssuedSchimenti Construction CoSteel, Concrete
1 project · most recent 05/18/2026
FiledStatusContractorScope
05/18/2026———
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
08/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/18/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/24/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
06/24/2026Sprinkler SystemsMARYAM RAKSHANspecial
06/24/2026Fire-Resistant Penetrations and JointsMARYAM RAKSHANspecial
05/27/2026Sprinkler SystemsWalter Gormanspecial
05/27/2026Post-installed AnchorsWalter Gormanspecial
05/27/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
05/22/2026Sprinkler SystemsWalter Gormanspecial
05/22/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
05/22/2026Post-installed AnchorsWalter Gormanspecial
02/03/2026Structural Stability – Alterations of existing buildingsWalter Gormanspecial
02/03/2026Structural Steel - WeldingWalter Gormanspecial
02/03/2026Structural Steel - High Strength BoltingWalter Gormanspecial
02/03/2026Concrete - Cast-In-PlaceWalter Gormanspecial
01/30/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
01/26/2026Structural Steel - DetailsWalter Gormanspecial
01/26/2026Structural Cold-Formed SteelWalter Gormanspecial
01/08/2026FinalWalter Gormanprogress
01/08/2026Mechanical SystemsWalter Gormanspecial
01/08/2026FinalWalter Gormanprogress
10/09/2025Energy Code Compliance InspectionsMARYAM RAKSHANprogress
10/01/2025Mechanical SystemsMARYAM RAKSHANspecial
10/01/2025FinalMARYAM RAKSHANprogress
09/30/2025FinalMARYAM RAKSHANprogress
08/12/2025FinalAndrew Houstonprogress
08/11/2025FinalChristopher Carranoprogress
07/02/2025FinalWalter Gormanprogress
Latest 25 of 92.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Elf HeroOtherFloor 1
Project M01465383 Alteration · Permit Entire · 10/08/2026
Jupiter RestaurantRestaurant / Food ServiceCellar, Sub-basement
Project M01343770 Alteration · Permit Entire · 02/19/2026
Project M01343791 Alteration · Permit Entire · 02/19/2026
Project M01343796 Alteration · Permit Entire · 02/19/2026
Project M01343799 Alteration · Permit Entire · 02/19/2026
Project M00775825 No Work · Filing Withdrawn · 09/24/2022
LadureeRestaurant / Food ServiceFloor 1
Project M01295746 Alteration · Permit Entire · 10/08/2025
TrudonRetailFloor 1
Project M01250650 Alteration · LOC Issued · 08/26/2025
ResoundOtherFloor 1
Project M01268684 Alteration · Permit Entire · 08/11/2025
Hurry Up Tomorrow The WeekendEvents & gatheringsFloor 1
Project M01164976 Alteration · LOC Issued · 01/13/2025
NBC Sports Olympic Watch PartyFitness / Recreation—
Project M01067155 Alteration · LOC Issued · 06/26/2024
NBC UniversalOfficeSub-basement
Project M01048855 Alteration · LOC Issued · 05/10/2024
Cole HaanRetailFloor 1
Project M00976076 Alteration · LOC Issued · 03/08/2024
Project M00976089 Alteration · LOC Issued · 03/08/2024
Smith & MillsRestaurant / Food ServiceCellar, Sub-basement
Project M00956488 No Work · PAA Approved · 11/01/2023
Project M00718983 Alteration · LOC Issued · 04/28/2022
Project M00719012 Alteration · LOC Issued · 04/28/2022
Five AcresRestaurant / Food ServiceCellar, Sub-basement
Project M08030309 No Work · PA Certificate of Operation Issued · 11/02/2022
Project M08030152 No Work · PA Certificate of Operation Issued · 10/31/2022
Project M00742046 No Work · Approved · 08/04/2022
Flipper'sFitness / RecreationBasement, Plaza
Project M00699038 Alteration · LOC Issued · 03/25/2022
Todd SnyderRetailFloor 1
Project M00647304 Alteration · LOC Issued · 02/16/2022
Project M00647316 Alteration · LOC Issued · 02/16/2022
Project M00647300 Alteration · LOC Issued · 02/15/2022
Project M00602556 Alteration · LOC Issued · 10/05/2021
Chanel Event ProjectRetail—
Project M00613141 Alteration · LOC Issued · 11/03/2021
AmunOfficeFloor 1
Project M00576751 Alteration · LOC Issued · 09/07/2021
King RestaurantRestaurant / Food ServiceSub-cellar, Cellar
Project M00541225 Alteration · LOC Issued · 08/03/2021
Project M00541251 Alteration · LOC Issued · 07/26/2021
Project M00541263 Alteration · LOC Issued · 07/26/2021
Project M00541275 Alteration · LOC Issued · 07/20/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,148 on file (BIS + DOB NOW)
▸Plans & Drawings284
▸DOB NOWPlans/Sketch - Temporary Place of Assembly196
09/05/2026M00132547-I1Request digital key ↗
09/05/2026M00135545-I1Request digital key ↗
09/05/2026M00150644-I1Request digital key ↗
Showing 3 of 196 on file for this type
▸DOB NOWPlans/Sketch56
09/03/2026M00515177-I1Request digital key ↗
09/03/2026M00541275-I1Request digital key ↗
09/03/2026M00541275-P1Request digital key ↗
Showing 3 of 56 on file for this type
▸DOB NOWPlans/Sketch - Plumbing11
09/04/2026M00392721-I1Request digital key ↗
09/04/2026M00275058-I1Request digital key ↗
09/03/2026M00436623-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
09/04/2026M00432490-I1Request digital key ↗
09/04/2026M00432490-P1Request digital key ↗
09/04/2026M00436631-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00275034-I1Request digital key ↗
09/04/2026M00392703-I1Request digital key ↗
09/04/2026M00432443-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits330
▸BISPLAN / WORK APPROVAL APPLICATION167
02/20/2026102015365Open ↗
02/20/2026102015365Open ↗
02/11/2026102015365Open ↗
Showing 3 of 167 on file for this type
▸BISWORK PERMIT APPLICATION105
04/04/2022120005877Open ↗
01/25/2021140995323Open ↗
01/22/2021140995190Open ↗
Showing 3 of 105 on file for this type
▸DOB NOWLPC Approval/Permit52
09/04/2026M00392721-I1Open ↗
09/03/2026M00515177-I1Open ↗
09/03/2026M00541251-I1Open ↗
Showing 3 of 52 on file for this type
▸BISPLACE OF ASSEMBLY4
10/25/2022120007606Open ↗
Showing 1 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
03/31/2022120005877Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications695
▸DOB NOWDPL-1: Design Professional Seal & Signature284
10/13/2026M01465383-I1Open ↗
10/13/2026M01465384-I1Open ↗
09/05/2026M00150644-I1Open ↗
Showing 3 of 284 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION210
10/25/2022120007606Open ↗
03/27/2020123829241Open ↗
03/27/2020123829241Open ↗
Showing 3 of 210 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT55
12/23/2020140995449Open ↗
12/23/2020140995190Open ↗
12/23/2020140995323Open ↗
Showing 3 of 55 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST50
03/27/2020123829241Open ↗
Showing 1 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/29/2026M01295746-P1Open ↗
09/29/2026M00275058-P1Open ↗
09/14/2026M00541251-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/14/2026M00541251-I1Open ↗
Showing 1 of 36 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/23/2020140995449Open ↗
12/23/2020140995190Open ↗
12/23/2020140995323Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/23/2020140995449Open ↗
12/23/2020140995190Open ↗
12/23/2020140995323Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment122
▸BISSELF-CERT PLUMBING NOTICE36
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 36 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISSCHEDULE B - PLUMBING27
09/29/2020123552930Open ↗
09/21/2020123552930Open ↗
08/19/2020123552930Open ↗
Showing 3 of 27 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8511
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos149
▸DOB NOWDEP ACP-5: Asbestos Assessment Report66
09/05/2026M00275034-P1Open ↗
09/05/2026M00275034-I1Open ↗
09/04/2026M00392721-I1Open ↗
Showing 3 of 66 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)56
12/23/2020140995449Open ↗
12/23/2020140995190Open ↗
12/23/2020140995323Open ↗
Showing 3 of 56 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS INSPECTION REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISNYCECC EXEMPTION4
12/23/2020140995449Open ↗
12/23/2020140995190Open ↗
12/23/2020140995323Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEMERGENCY LIGHTING(IF NOT IN COMPLIANCE WITH MEMO 2/18/81)1
10/25/2022120007606Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEMERGENCY LIGHTING - PA1
10/13/2022120007606Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY16
03/15/2022140955269Open ↗
03/15/2022140955269Open ↗
09/03/2021123784057Open ↗
Showing 3 of 16 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
11/13/2023140995190Open ↗
11/13/2023140995449Open ↗
03/14/2022140955269Open ↗
Showing 3 of 4 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS2
11/13/2023140995190Open ↗
11/13/2023140995449Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
11/13/2023140995323Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
11/13/2023140995323Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
10/25/2022120007606Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/13/2023140995449Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/13/2023140995323Open ↗
▸Approvals, Objections & Sign-offs201
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST77
11/14/2023140995190Open ↗
11/14/2023140995323Open ↗
11/14/2023140995449Open ↗
Showing 3 of 77 on file for this type
▸BISLANDMARKS APPROVAL51
12/23/2020140995449Open ↗
12/23/2020140995190Open ↗
12/23/2020140995323Open ↗
Showing 3 of 51 on file for this type
▸BISADMINISTRATIVE OBJECTIONS29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE25
02/11/2026102015365Open ↗
01/12/2026102015365Open ↗
06/16/2025102015365Open ↗
Showing 3 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLANDMARKS SIGNOFF6
11/14/2023140995190Open ↗
11/14/2023140995323Open ↗
04/04/2022123784066Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL5
11/13/2023140995323Open ↗
11/13/2023140995190Open ↗
11/13/2023140995449Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER1
12/03/2020123784057Open ↗
▸Cost, Insurance & Ownership151
▸BISCOST AFFIDAVIT146
09/03/2021123784057Open ↗
01/29/2021123829241Open ↗
12/23/2020140995449Open ↗
Showing 3 of 146 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
11/13/2023140995323Open ↗
11/13/2023140995190Open ↗
11/13/2023140995449Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms151
▸BISEFILING COVER SHEET81
03/27/2020123829241Open ↗
Showing 1 of 81 on file for this type
▸BISADDITIONAL INFORMATION33
01/12/2024102015365Open ↗
10/13/2022120007606Open ↗
06/29/2022120005877Open ↗
Showing 3 of 33 on file for this type
▸BISBOROUGH INTAKE FORM29
03/19/2020102015365Open ↗
Showing 1 of 29 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
12/23/2020140995449Open ↗
12/23/2020140995190Open ↗
12/23/2020140995323Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
10/25/2022120007606Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWProof of Historic Building5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAlternate Plan 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type