← Back
General warehouse
620 WEST 47 STREET
MANHATTAN · Hell's Kitchen · BIN 1080990
💬 Discuss this project
1911Year Built
8Stories
E1Building Class
M2-4Zoning
35,069 sfGross Floor Area
1Units
LL97 Covered12 Open Violations ▸
General warehouse · 6,050 sf lot · 5.8 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 4 filings · 20 docs
Floor 71p · 1 filing · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPRING SCAFFOLDING LLC1503/22/2026
GUGGENHEIM MUSEUM303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
GREEN STUDIO403/21/2026
ALL CITY ENGINEERING, P.C.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor903/21/2026
PHOENIX INTERIOR CONTRACTGeneral Contractor807/08/2026
DAIKIN APPLIED AMERICASGeneral Contractor404/09/2026
SKYLINE RESTORATION INCGeneral Contractor403/21/2026
MATCO SERVICE CORPGeneral Contractor203/21/2026
JD MASTERS PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974212/18/2024
GOLDMAN COPELAND ASSOCIAT2826202/28/2023
ALL CITY ENGINEERING PC7115108/09/2021
Building Lifecycle
All (106)Filed (12)Permit Issued (16)Signed Off (9)Violation (31)Inspection (2)Objection (6)Special Inspection (30)
03/05/2026
Signed off — Alteration
REPLACEMENT OF TWO CHILLER UNITS ON THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01119384-I1
01/09/2026
Permit issued — Mechanical Systems
M01119384-I1-MS
01/23/2025
Permit issued — Mechanical Systems
M01119384-I1-MS
12/18/2024
Filed — Alteration
REPLACEMENT OF TWO CHILLER UNITS ON THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01119384-I1
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
09/30/2024
Special inspection requirement — Final
Vincent Liotta
09/30/2024
Special inspection requirement — Mechanical Systems
Vincent Liotta
09/30/2024
Special inspection requirement — Maintenance information
Vincent Liotta
09/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
09/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
05/06/2024
Signed off — Alteration
INSTALLATION OF DAIKIN SPLIT SYSTEM WITH A TOTAL CAPACITY OF 1 TON , LOCATED ON THE GROUND FLOOR AND ROOF.
M00964673-I1
04/23/2024
Permit issued — Mechanical Systems
M00964673-I1-MS
12/18/2023
Filed — Alteration
INSTALLATION OF DAIKIN SPLIT SYSTEM WITH A TOTAL CAPACITY OF 1 TON , LOCATED ON THE GROUND FLOOR AND ROOF.
M00964673-I1
11/20/2023
Signed off — Alteration
INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00695373-I1
11/17/2023
Special inspection requirement — Final
Vincent Liotta
11/17/2023
Special inspection requirement — Maintenance information
Vincent Liotta
11/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
11/17/2023
Special inspection requirement — Mechanical Systems
Vincent Liotta
11/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
11/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
10/30/2023
Signed off — Alteration
MECHANICAL WORK CONSISTING MECHANICAL REMOVALS & NEW RTU, FANS, DAMPERS AND ASSOCIATED DUCTS & PIPING TO EXISTING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00752130-I1
10/20/2023
Signed off — Alteration
M00752135-I1
07/10/2023
Permit issued — Mechanical Systems
M00752130-I1-MS
07/10/2023
Permit issued — Mechanical Systems
M00752130-I1-MS
06/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2023
Signed off — Alteration
FACADE REPAIRS AND ROOF MEMBRANE REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00630474-I1
03/20/2023
Special inspection requirement — Final
Susanne Mackiw
03/17/2023
Filed — Alteration
FACADE REPAIRS AND ROOF MEMBRANE REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00630474-P1
03/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Mechanical Systems
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Final
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Energy Code Compliance Inspections
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Maintenance information
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Duct leakage testing, insulation and design
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Ventilation and air distribution system
DANIEL COLOMBINI
02/28/2023
Filed — Alteration
MECHANICAL WORK CONSISTING MECHANICAL REMOVALS & NEW RTU, FANS, DAMPERS AND ASSOCIATED DUCTS & PIPING TO EXISTING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00752130-P1
02/28/2023
Special inspection requirement — Duct leakage testing, insulation and design
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Ventilation and air distribution system
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Maintenance information
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Final
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Energy Code Compliance Inspections
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Mechanical Systems
DANIEL COLOMBINI
02/17/2023
Permit issued — General Construction
M00630474-I1-GC
12/09/2022
Permit issued — Mechanical Systems
M00752130-I1-MS
12/09/2022
Permit issued — Mechanical Systems
M00752130-I1-MS
11/18/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE CODE, NO CGANGES IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00620801-I1
11/18/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH THE CHAPTER #33 OF THE CODE. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00620827-I1
11/16/2022
Permit issued — Mechanical Systems
M00752130-I1-MS
10/05/2022
Permit issued — Mechanical Systems
M00752130-I1-MS
09/29/2022
Permit issued — Plumbing
M00752135-I1-PL
08/25/2022
Objection raised — Other
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Other
08/25/2022
Objection resolved — Addressed
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDAIKIN APPLIED AMERICAS01/09/2026
DOB NOWMechanical SystemsSigned-offDAIKIN APPLIED AMERICAS01/23/2025
DOB NOWMechanical SystemsSigned-offDAIKIN APPLIED AMERICAS04/23/2024
DOB NOWMechanical SystemsSigned-offPHOENIX INTERIOR CONTRACT07/10/2023
DOB NOWMechanical SystemsSigned-offPHOENIX INTERIOR CONTRACT07/10/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/17/2023
DOB NOWMechanical SystemsSigned-offPHOENIX INTERIOR CONTRACT12/09/2022
DOB NOWMechanical SystemsSigned-offPHOENIX INTERIOR CONTRACT12/09/2022
DOB NOWMechanical SystemsSigned-offPHOENIX INTERIOR CONTRACT11/16/2022
DOB NOWMechanical SystemsSigned-offPHOENIX INTERIOR CONTRACT10/05/2022
DOB NOWPlumbingSigned-offJD MASTERS PLBG & HTG09/29/2022
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC03/16/2022
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/24/2022
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC02/18/2022
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC02/18/2022
DOB NOWMechanical SystemsSigned-offMATCO SERVICE CORP08/11/2021
BISFSISSUEDRGJ CONTRACTING COR10/01/1998
BISMHISSUEDPEMCO ASSOCIATES09/24/1998
BIS—ISSUEDNORTH SHORE NEON07/02/1998
BIS—ISSUEDNORTH SHORE NEON07/02/1998
BISSPISSUEDNATIONAL SPRINKLER CORP05/05/1993
BISSPISSUEDNATIONAL SPRINKLELR CORP05/05/1992
BISSDISSUEDALKAR PLG CORP01/28/1992
BISOTISSUEDWILL-RAY METAL FABRICATORS INC12/06/1991
2 projects · most recent 10/06/2022
General Wiring
FiledStatusContractorScope
10/06/2022CompleteAPOLLO ELECTRIC INSDUS INGeneral Wiring
06/01/2022CompleteJTE ELECTRICAL SERVICES—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
09/30/2024HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
09/30/2024FinalVincent Liottaprogress
09/30/2024Mechanical SystemsVincent Liottaspecial
09/30/2024Maintenance informationVincent Liottaenergy_progress
09/30/2024HVAC-R and service water heating equipmentVincent Liottaenergy_progress
09/30/2024HVAC-R and service water heating system controlsVincent Liottaenergy_progress
11/17/2023FinalVincent Liottaprogress
11/17/2023Maintenance informationVincent Liottaenergy_progress
11/17/2023HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
11/17/2023Mechanical SystemsVincent Liottaspecial
11/17/2023HVAC-R and service water heating equipmentVincent Liottaenergy_progress
11/17/2023HVAC-R and service water heating system controlsVincent Liottaenergy_progress
03/20/2023FinalSusanne Mackiwprogress
03/01/2023Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
03/01/2023Mechanical SystemsDANIEL COLOMBINIspecial
03/01/2023FinalDANIEL COLOMBINIprogress
03/01/2023Energy Code Compliance InspectionsDANIEL COLOMBINIprogress
03/01/2023HVAC-R and service water heating system controlsDANIEL COLOMBINIenergy_progress
03/01/2023Maintenance informationDANIEL COLOMBINIenergy_progress
03/01/2023Duct leakage testing, insulation and designDANIEL COLOMBINIenergy_progress
03/01/2023HVAC-R and service water piping design and insulationDANIEL COLOMBINIenergy_progress
03/01/2023Ventilation and air distribution systemDANIEL COLOMBINIenergy_progress
02/28/2023Duct leakage testing, insulation and designDANIEL COLOMBINIenergy_progress
02/28/2023Ventilation and air distribution systemDANIEL COLOMBINIenergy_progress
02/28/2023HVAC-R and service water heating system controlsDANIEL COLOMBINIenergy_progress
Latest 25 of 31.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/03/2026M00563547-I1Request digital key ↗
09/03/2026M00630474-P1Request digital key ↗
09/03/2026M00630474-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026M01119384-I1Open ↗
09/01/2026M01119384-I1Open ↗
09/01/2026M00752130-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/03/2026M00563547-I1Open ↗
09/03/2026M00630474-P1Open ↗
09/03/2026M00630474-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M01119384-I1Open ↗
09/01/2026M00752130-I1Open ↗
09/01/2026M00752130-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist12
09/03/2026M00630474-P1Open ↗
09/03/2026M00630474-I1Open ↗
09/02/2026M00695373-I1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00563547-I1Open ↗
09/02/2026M00752135-I1Open ↗
08/25/2026M01119384-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00630474-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00752130-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/03/2026M00630474-P1Open ↗
09/03/2026M00630474-I1Open ↗
09/02/2026M00752135-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter1
09/03/2026M00630474-I1Open ↗