💬 Discuss this project
1911Year Built
8Stories
E1Building Class
M2-4Zoning
35,069 sfGross Floor Area
1Units
LL97 Covered1 Active Violation 1 likely answered ▸
General warehouse · 6,050 sf lot · 5.8 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGuggenheim31p · 6 filings · 20 docs
Floor 8GUGGENHEIMWAREHOUSE heating and cooling equipment3p · 1 filing · 4 docs
Floor 7Guggenheim14p · 1 filing · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Daikin split system installation1p · 1 filing · 8 docs
Site & exteriorFacade repairs and roof membrane replacement27p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Solomon R. Guggenheim Museum904/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants503/21/2026
Green Studio403/21/2026
All City Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold903/21/2026
Phoenix Interior ContractingGeneral Contractor807/08/2026
Daikin Applied AmericasGeneral Contractor404/09/2026
Skyline Restorationspecialty_contractor403/21/2026
Matco ServiceGeneral Contractor203/21/2026
JD Masters Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vincent J. Liotta P. E1974212/18/2024
Goldman Copeland Associates2826202/28/2023
All City Engineering7115108/09/2021
Building Lifecycle
All (106)Filed (12)Permit Issued (16)Signed Off (9)Violation (31)Inspection (2)Objection (6)Special Inspection (30)
03/05/2026
Signed off — Alteration
REPLACEMENT OF TWO CHILLER UNITS ON THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01119384-I1
01/09/2026
Permit issued — Mechanical Systems
M01119384-I1-MS
01/23/2025
Permit issued — Mechanical Systems
M01119384-I1-MS
12/18/2024
Filed — Alteration
REPLACEMENT OF TWO CHILLER UNITS ON THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01119384-I1
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
09/30/2024
Special inspection requirement — Final
Vincent Liotta
09/30/2024
Special inspection requirement — Mechanical Systems
Vincent Liotta
09/30/2024
Special inspection requirement — Maintenance information
Vincent Liotta
09/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
09/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
05/06/2024
Signed off — Alteration
INSTALLATION OF DAIKIN SPLIT SYSTEM WITH A TOTAL CAPACITY OF 1 TON , LOCATED ON THE GROUND FLOOR AND ROOF.
M00964673-I1
04/23/2024
Permit issued — Mechanical Systems
M00964673-I1-MS
12/18/2023
Filed — Alteration
INSTALLATION OF DAIKIN SPLIT SYSTEM WITH A TOTAL CAPACITY OF 1 TON , LOCATED ON THE GROUND FLOOR AND ROOF.
M00964673-I1
11/20/2023
Signed off — Alteration
INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00695373-I1
11/17/2023
Special inspection requirement — Final
Vincent Liotta
11/17/2023
Special inspection requirement — Maintenance information
Vincent Liotta
11/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
11/17/2023
Special inspection requirement — Mechanical Systems
Vincent Liotta
11/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
11/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
10/30/2023
Signed off — Alteration
MECHANICAL WORK CONSISTING MECHANICAL REMOVALS & NEW RTU, FANS, DAMPERS AND ASSOCIATED DUCTS & PIPING TO EXISTING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00752130-I1
10/20/2023
Signed off — Alteration
M00752135-I1
07/10/2023
Permit issued — Mechanical Systems
M00752130-I1-MS
07/10/2023
Permit issued — Mechanical Systems
M00752130-I1-MS
06/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2023
Signed off — Alteration
FACADE REPAIRS AND ROOF MEMBRANE REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00630474-I1
03/20/2023
Special inspection requirement — Final
Susanne Mackiw
03/17/2023
Filed — Alteration
FACADE REPAIRS AND ROOF MEMBRANE REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00630474-P1
03/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Mechanical Systems
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Final
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Energy Code Compliance Inspections
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Maintenance information
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Duct leakage testing, insulation and design
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DANIEL COLOMBINI
03/01/2023
Special inspection requirement — Ventilation and air distribution system
DANIEL COLOMBINI
02/28/2023
Filed — Alteration
MECHANICAL WORK CONSISTING MECHANICAL REMOVALS & NEW RTU, FANS, DAMPERS AND ASSOCIATED DUCTS & PIPING TO EXISTING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00752130-P1
02/28/2023
Special inspection requirement — Duct leakage testing, insulation and design
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Ventilation and air distribution system
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Maintenance information
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Final
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Energy Code Compliance Inspections
DANIEL COLOMBINI
02/28/2023
Special inspection requirement — Mechanical Systems
DANIEL COLOMBINI
02/17/2023
Permit issued — General Construction
M00630474-I1-GC
12/09/2022
Permit issued — Mechanical Systems
M00752130-I1-MS
12/09/2022
Permit issued — Mechanical Systems
M00752130-I1-MS
11/18/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE CODE, NO CGANGES IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00620801-I1
11/18/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH THE CHAPTER #33 OF THE CODE. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00620827-I1
11/16/2022
Permit issued — Mechanical Systems
M00752130-I1-MS
10/05/2022
Permit issued — Mechanical Systems
M00752130-I1-MS
09/29/2022
Permit issued — Plumbing
M00752135-I1-PL
08/25/2022
Objection raised — Other
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Other
08/25/2022
Objection resolved — Addressed
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDaikin Applied Americas01/09/2026
DOB NOWMechanical SystemsSigned-offDaikin Applied Americas01/23/2025
DOB NOWMechanical SystemsSigned-offDaikin Applied Americas04/23/2024
DOB NOWMechanical SystemsSigned-offPhoenix Interior Contracting07/10/2023
DOB NOWMechanical SystemsSigned-offPhoenix Interior Contracting07/10/2023
DOB NOWGeneral ConstructionSigned-offSkyline Restoration02/17/2023
DOB NOWMechanical SystemsSigned-offPhoenix Interior Contracting12/09/2022
DOB NOWMechanical SystemsSigned-offPhoenix Interior Contracting12/09/2022
DOB NOWMechanical SystemsSigned-offPhoenix Interior Contracting11/16/2022
DOB NOWMechanical SystemsSigned-offPhoenix Interior Contracting10/05/2022
DOB NOWPlumbingSigned-offJD Masters Plumbing & Heating09/29/2022
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding03/16/2022
DOB NOWGeneral ConstructionSigned-offSkyline Restoration02/24/2022
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding02/18/2022
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/18/2022
DOB NOWMechanical SystemsSigned-offMatco Service08/11/2021
BISFSISSUEDRGJ Contracting10/01/1998
BISMHISSUEDPemco Associates09/24/1998
BIS—ISSUEDNorth Shore Neon07/02/1998
BIS—ISSUEDNorth Shore Neon07/02/1998
BISSPISSUEDNational Sprinkler05/05/1993
BISSPISSUEDNational Sprinklelr05/05/1992
BISSDISSUEDAlkar PLG01/28/1992
BISOTISSUEDWill-Ray Metal Fabricators12/06/1991
2 projects · most recent 10/06/2022
General Wiring
FiledStatusContractorScope
10/06/2022CompleteApollo Electric InsdusGeneral Wiring
06/01/2022CompleteJte Electrical Services—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
09/30/2024HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
09/30/2024FinalVincent Liottaprogress
09/30/2024Mechanical SystemsVincent Liottaspecial
09/30/2024Maintenance informationVincent Liottaenergy_progress
09/30/2024HVAC-R and service water heating equipmentVincent Liottaenergy_progress
09/30/2024HVAC-R and service water heating system controlsVincent Liottaenergy_progress
11/17/2023FinalVincent Liottaprogress
11/17/2023Maintenance informationVincent Liottaenergy_progress
11/17/2023HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
11/17/2023Mechanical SystemsVincent Liottaspecial
11/17/2023HVAC-R and service water heating equipmentVincent Liottaenergy_progress
11/17/2023HVAC-R and service water heating system controlsVincent Liottaenergy_progress
03/20/2023FinalSusanne Mackiwprogress
03/01/2023Fire-Resistant Penetrations and JointsDANIEL COLOMBINIspecial
03/01/2023Mechanical SystemsDANIEL COLOMBINIspecial
03/01/2023FinalDANIEL COLOMBINIprogress
03/01/2023Energy Code Compliance InspectionsDANIEL COLOMBINIprogress
03/01/2023HVAC-R and service water heating system controlsDANIEL COLOMBINIenergy_progress
03/01/2023Maintenance informationDANIEL COLOMBINIenergy_progress
03/01/2023Duct leakage testing, insulation and designDANIEL COLOMBINIenergy_progress
03/01/2023HVAC-R and service water piping design and insulationDANIEL COLOMBINIenergy_progress
03/01/2023Ventilation and air distribution systemDANIEL COLOMBINIenergy_progress
02/28/2023Duct leakage testing, insulation and designDANIEL COLOMBINIenergy_progress
02/28/2023Ventilation and air distribution systemDANIEL COLOMBINIenergy_progress
02/28/2023HVAC-R and service water heating system controlsDANIEL COLOMBINIenergy_progress
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
GuggenheimArts / Culture / EntertainmentFloor 7, Roof
Project M00752130 Alteration · LOC Issued · 08/23/2022
Project M00752135 Alteration · LOC Issued · 08/23/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/03/2026M00563547-I1Request digital key ↗
09/03/2026M00630474-I1Request digital key ↗
09/03/2026M00630474-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026M01119384-I1Open ↗
09/01/2026M01119384-I1Open ↗
09/01/2026M00752130-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/03/2026M00563547-I1Open ↗
09/03/2026M00630474-P1Open ↗
09/03/2026M00630474-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M01119384-I1Open ↗
09/01/2026M00752130-I1Open ↗
09/01/2026M00752130-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist12
09/03/2026M00630474-I1Open ↗
09/03/2026M00630474-P1Open ↗
09/02/2026M00695373-P1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00563547-I1Open ↗
09/02/2026M00752135-I1Open ↗
08/25/2026M01119384-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00630474-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00752130-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/03/2026M00630474-P1Open ↗
09/03/2026M00630474-I1Open ↗
09/02/2026M00752135-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter1
09/03/2026M00630474-I1Open ↗