← Back
Two family converted from one family
6202 12 AVENUE
BROOKLYN · BIN 3141529
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3AZoning
1,914 sfGross Floor Area
2Units
12 Open Violations ▸FDNY Report ↗
Two family converted from one family · 2,008 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 14 docs
Floor 21p · 1 filing · 14 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 6202 12TH AVE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/05/2024$1.6M—— → —$841/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX FLAME SOLUTION INC406/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIBEN BUILDING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JABBIE INDUSTRIES INCORP*General Contractor303/21/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JX FLAME SOLUTION INC7286406/12/2024
Building Lifecycle
All (35)Filed (4)Permit Issued (2)Signed Off (2)Violation (18)Inspection (3)Objection (2)Special Inspection (4)
08/13/2024
Signed off — Alteration
NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RENOVATION OF AN EXISTING BUILDING AT BASEMENT 1ST AND 2ND FLOOR. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION.
B01033297-S2
08/12/2024
Signed off — Alteration
NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RENOVATION OF AN EXISTING BUILDING AT BASEMENT 1ST AND 2ND FLOOR. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION.
B01033297-I1
08/09/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIE ZHU
06/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
JIE ZHU
06/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
JIE ZHU
06/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JIE ZHU
06/12/2024
Filed — Alteration
NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RENOVATION OF AN EXISTING BUILDING AT BASEMENT 1ST AND 2ND FLOOR. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION.
B01033297-P2
06/11/2024
Objection raised — Scope
06/11/2024
Objection resolved — Addressed
06/05/2024
Filed — Alteration
NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RENOVATION OF AN EXISTING BUILDING AT BASEMENT 1ST AND 2ND FLOOR. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION.
B01033297-P1
05/03/2024
Permit issued — Plumbing
B01033297-S2-PL
04/28/2024
Filed — Alteration
NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RENOVATION OF AN EXISTING BUILDING AT BASEMENT 1ST AND 2ND FLOOR. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION.
B01033297-S2
04/28/2024
Permit issued — General Construction
B01033297-I1-GC
04/15/2024
Filed — Alteration
NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RENOVATION OF AN EXISTING BUILDING AT BASEMENT 1ST AND 2ND FLOOR. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION.
B01033297-I1
02/11/2020
Violation issued (HPD, open)
I
02/07/2020
Violation issued (ECB, closed)
Boilers
02/06/2020
Violation issued (HPD, open)
B
02/06/2020
Violation issued (HPD, open)
B
02/06/2020
Violation issued (HPD, open)
B
02/06/2020
Violation issued (HPD, closed)
C
02/06/2020
Violation issued (HPD, open)
B
02/06/2020
Violation issued (HPD, open)
C
02/06/2020
Violation issued (HPD, open)
B
02/06/2020
Violation issued (HPD, open)
B
02/06/2020
Violation issued (HPD, open)
B
02/06/2020
Violation issued (HPD, open)
B
02/06/2020
Violation issued (HPD, open)
B
02/06/2020
Violation issued (HPD, open)
B
11/13/2000
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
11/13/2000
Violation issued (ECB, closed)
Construction
06/07/2000
Violation issued (ECB, closed)
Zoning
06/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC05/03/2024
DOB NOWGeneral ConstructionSigned-offJABBIE INDUSTRIES INCORP*04/28/2024
BISOTISSUEDMAIN CONST INC08/02/2005
BISOTISSUEDMIAN CONTRACTING INC08/31/2001
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/09/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/13/2024Fire-Resistant Penetrations and JointsJIE ZHUspecial
06/13/2024HVAC-R and service water heating system controlsJIE ZHUenergy_progress
06/13/2024HVAC-R and service water heating equipmentJIE ZHUenergy_progress
06/13/2024HVAC-R and service water piping design and insulationJIE ZHUenergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B01033297-I1Request digital key ↗
08/25/2026B01033297-S2Request digital key ↗
08/25/2026B01033297-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026B01033297-S2Open ↗
08/25/2026B01033297-I1Open ↗
08/13/2026B01033297-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01033297-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01033297-S2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026B01033297-I1Open ↗
08/25/2026B01033297-S2Open ↗
08/13/2026B01033297-P2Open ↗
Showing 3 of 4 on file for this type