← Back
Primarily 1 family with 1 store or office
6217 16 AVENUE
BROOKLYN · BIN 3132734
💬 Discuss this project
1920Year Built
2Stories
S1Building Class
M1-1Zoning
1,820 sfGross Floor Area
2Units
Primarily 1 family with 1 store or office · 1,260 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 1 filing · 7 docs
Cellar1p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALFRED C. BARTOLOMEO,AIA,ARCHITECT212/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EDWARD A CARPENTRY CORPGeneral Contractor303/21/2026
KING'S PLAZA PLBG & HTG IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RICHMOND TESTING LAB263212/17/2021
Building Lifecycle
All (21)Filed (2)Permit Issued (2)Signed Off (2)Inspection (3)Objection (2)Special Inspection (10)
04/05/2023
Signed off — Alteration
REPLACE ALL EXISTING PLUMBING FIXTURES WITH NEW PLUMBING FIXTURES ON EXISTING ROUGHING. REPLACE GAS FIRED STEAM BOILER AND HOT WATER HEATER WITH NEW GAS FIRED CROWN HOT WATER BOILER AND NEW GAS HOT WATER HEATER. IN CONJUNCTION WITH GEN. CONST. #B00635598.
B00635704-I1
04/04/2023
Signed off — Alteration
REPAIR EXISTING TWO STORY & CELLAR, TWO FAMILY DWELLING DAMAGED BY FIRE. NEW SHEETROCK WALLS, PARTITIONS AND CEILINGS AND FINISHES THROUGHOUT. ALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING.
B00635598-I1
12/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/21/2022
Permit issued — General Construction
B00635598-I1-GC
03/01/2022
Permit issued — Plumbing
B00635704-I1-PL
12/21/2021
Objection resolved — Addressed
12/20/2021
Objection raised — Scope
12/17/2021
Filed — Alteration
REPLACE ALL EXISTING PLUMBING FIXTURES WITH NEW PLUMBING FIXTURES ON EXISTING ROUGHING. REPLACE GAS FIRED STEAM BOILER AND HOT WATER HEATER WITH NEW GAS FIRED CROWN HOT WATER BOILER AND NEW GAS HOT WATER HEATER. IN CONJUNCTION WITH GEN. CONST. #B00635598.
B00635704-I1
12/17/2021
Filed — Alteration
REPAIR EXISTING TWO STORY & CELLAR, TWO FAMILY DWELLING DAMAGED BY FIRE. NEW SHEETROCK WALLS, PARTITIONS AND CEILINGS AND FINISHES THROUGHOUT. ALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING.
B00635598-I1
12/09/2021
Special inspection requirement — Lighting controls
RICHARD LEMANSKY
12/09/2021
Special inspection requirement — Energy Code Compliance Inspections
RICHARD LEMANSKY
12/09/2021
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD LEMANSKY
12/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD LEMANSKY
12/09/2021
Special inspection requirement — Fenestration areas
RICHARD LEMANSKY
12/09/2021
Special inspection requirement — Fenestration air leakage
RICHARD LEMANSKY
12/09/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
RICHARD LEMANSKY
12/09/2021
Special inspection requirement — Insulation placement and R values
RICHARD LEMANSKY
12/09/2021
Special inspection requirement — Interior lighting power
RICHARD LEMANSKY
11/22/2021
Special inspection requirement — Final
RICHARD LEMANSKY
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEDWARD A CARPENTRY CORP03/21/2022
DOB NOWPlumbingSigned-offKING'S PLAZA PLBG & HTG I03/01/2022
1 project · most recent 11/21/2022
General Wiring
FiledStatusContractorScope
11/21/2022CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/09/2021Lighting controlsRICHARD LEMANSKYenergy_progress
12/09/2021Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
12/09/2021Fire-Resistance Rated ConstructionRICHARD LEMANSKYprogress
12/09/2021Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
12/09/2021Fenestration areasRICHARD LEMANSKYenergy_progress
12/09/2021Fenestration air leakageRICHARD LEMANSKYenergy_progress
12/09/2021Fenestration and door U-factor and product ratingsRICHARD LEMANSKYenergy_progress
12/09/2021Insulation placement and R valuesRICHARD LEMANSKYenergy_progress
12/09/2021Interior lighting powerRICHARD LEMANSKYenergy_progress
11/22/2021FinalRICHARD LEMANSKYprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/31/2026B00635598-I1Request digital key ↗
08/15/2026B00635704-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00635598-I1Open ↗
08/13/2026B00635704-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00635598-I1Open ↗
08/23/2026B00635598-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00635598-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00635598-I1Open ↗
08/13/2026B00635704-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00635704-I1Open ↗
08/13/2026B00635598-I1Open ↗