← Back
Elevator apt, fireproof with stores
The Westline
622 11 AVENUE · BIN 1091906
💬 Discuss this project
2024Year Built
14Stories
D6Building Class
R8AZoning
100,233 sfGross Floor Area
51Units
0 Open Violations
Elevator apt, fireproof with stores · Owner of record: ELEVEN W46 REALTY LLC · 8,242 sf lot · 12.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof6p · 2 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 145p · 2 filings · 20 docs
Floor 135p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Floor 105p · 1 filing · 20 docs
Floor 95p · 1 filing · 20 docs
Floor 84p · 1 filing · 20 docs
Floor 75p · 2 filings · 20 docs
Floor 61p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B CONTRACTORS GROUP603/22/2026
CORE SCAFFOLD SYSTEMS103/22/2026
CHESS BUILDERS2803/21/2026
ELEVEN W46 REALTY203/21/2026
OWNERS REP803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/21/2024$33.2M—616 11TH AVENUE LLC → ELEVEN W46 REALTY LLC$331/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1603/21/2026
EXPEDITING 4 U1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAS ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3942306/16/2026
LEO Y LEE ASSOCIATES2481509/02/2025
MJE CONSULTING ENGINEERIN8522105/27/2024
H & O ENGINEERING, DPC5595205/08/2024
Building Lifecycle
All (130)Filed (43)Signed Off (23)Violation (4)Objection (30)Special Inspection (30)
06/22/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
06/22/2026
Special inspection requirement — Maintenance information
Paul Raymond
06/22/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
06/22/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
06/22/2026
Special inspection requirement — Interior lighting power
Paul Raymond
06/22/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
06/22/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/22/2026
Special inspection requirement — Electrical motors and elevators
Paul Raymond
06/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
06/22/2026
Special inspection requirement — Metering
Paul Raymond
06/22/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
06/22/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
06/22/2026
Special inspection requirement — Fenestration areas
Paul Raymond
06/22/2026
Special inspection requirement — Lighting controls
Paul Raymond
06/22/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
06/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
06/16/2026
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-B3
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
06/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
06/15/2026
Special inspection requirement — Lighting controls
Paul Raymond
06/15/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
06/15/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
06/15/2026
Special inspection requirement — Metering
Paul Raymond
06/15/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
06/15/2026
Special inspection requirement — Maintenance information
Paul Raymond
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/15/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
06/15/2026
Special inspection requirement — Fenestration areas
Paul Raymond
06/15/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
04/21/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-S6
04/21/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-S7
02/24/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED CORE CANOPY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01178810-I1
02/23/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-S5
02/23/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-S8
02/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01112991-I1
02/18/2026
Signed off — Alteration
M01045086-I1
02/18/2026
Signed off — Alteration
M01112958-I1
02/18/2026
Signed off — Alteration
M01045095-I1
02/18/2026
Signed off — Alteration
M01114930-I1
02/18/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01112964-I1
12/11/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-S2
12/11/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-S3
12/10/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-S4
12/10/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-Z1
11/25/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-A5
11/05/2025
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01047408-I1
11/05/2025
Signed off — Alteration
FENCE APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #M01020109.
M01046224-I1
09/30/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-P9
09/30/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-A1
09/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01112996-I1
09/09/2025
Violation issued (ECB, closed)
Unknown
09/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED CORE CANOPY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01178810-P2
08/16/2025
Violation issued (ECB, closed)
Construction
08/16/2025
Violation issued (ECB, closed)
Unknown
07/08/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-S9
07/08/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-S1
06/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01112964-P2
05/14/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
M01020109-P7
Latest 60 of 130 events.
Nothing on file for this building.
1 project · most recent 06/16/2026
Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2026Permit IssuedB CONTRACTORS GROUP LLCGenerators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RMXS48LVJU 4 tons · Condensing Unit ×50
RZQ24TBVJU 2 tons · Condensing Unit ×36
4MXS36WMVJU9 3 tons · Condensing Unit ×34
5MXS48WVJU9 4 tons · Condensing Unit ×8
REYQ240XATJB 20 tons · Vrf Outdoor ×2
Ventilation
Greenheck CUE-100HP-VG 600 CFM · Exhaust Fan ×8
CUE-140HP-VG 1,175 CFM · Exhaust Fan ×8
AX-54-190-0620 7,250 CFM · Exhaust Fan ×2
Generators
Kohler KG100R 150 kW · Generator ×1
1 project · most recent 06/16/2026
Sprinkler System
FiledStatusContractorScope
06/16/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 06/16/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/16/2026Signed-offMPI PLUMBING CORPGas, Storm, Water/Sanitary
7 projects · most recent 01/03/2026
General Wiring
FiledStatusContractorScope
01/03/2026CompleteDENALI ELECTRIC CORP—
12/08/2025CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
11/09/2025CompleteNASH ELECTRIC SERVICES IN—
02/06/2025CompleteSOLAS ELECTRICAL CORP—
12/06/2024CompleteSOLAS ELECTRICAL CORP—
10/30/2024CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
05/22/2024CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 06/16/2026
Concrete
FiledStatusContractorScope
06/16/2026Signed-offPRIME PIPING & HEATING INConcrete
1 project · most recent 06/16/2026
Earthwork
FiledStatusContractorScope
06/16/2026Signed-offPRIME PIPING & HEATING INEarthwork
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/22/2026MeteringPaul Raymondenergy_progress
06/22/2026Electrical motors and elevatorsPaul Raymondenergy_progress
06/22/2026Protection of exposed foundation insulationPaul Raymondenergy_progress
06/22/2026Interior lighting powerPaul Raymondenergy_progress
06/22/2026Air barrier continuity plan testingPaul Raymondenergy_progress
06/22/2026Insulation placement and R valuesPaul Raymondenergy_progress
06/22/2026Exterior lighting powerPaul Raymondenergy_progress
06/22/2026Fenestration areasPaul Raymondenergy_progress
06/22/2026Lighting controlsPaul Raymondenergy_progress
06/22/2026Fenestration air leakagePaul Raymondenergy_progress
06/22/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/22/2026Air barrier - visual inspectionPaul Raymondenergy_progress
06/22/2026Maintenance informationPaul Raymondenergy_progress
06/22/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
06/22/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
06/22/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
06/22/2026Energy Code Compliance InspectionsPaul Raymondprogress
06/22/2026Lighting in dwelling unitsPaul Raymondenergy_progress
06/15/2026Air barrier continuity plan testingPaul Raymondenergy_progress
06/15/2026Lighting controlsPaul Raymondenergy_progress
06/15/2026MeteringPaul Raymondenergy_progress
06/15/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
06/15/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/15/2026Energy Code Compliance InspectionsPaul Raymondprogress
06/15/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
Latest 25 of 150.
▾Documents — 377 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch43
08/27/2026M01016512-I1Request digital key ↗
08/27/2026M01045095-I1Request digital key ↗
08/27/2026M01035822-I1Request digital key ↗
Showing 3 of 43 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation2
12/02/2024141026440Open ↗
11/18/2024141026440Open ↗
▸Zoning, Tax Lot & Property Records20
▸DOB NOWRestrictive Declaration/Easement 111
08/23/2026M01020109-B3Open ↗
Showing 1 of 11 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026M01020109-B3Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/23/2026M01020109-B3Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWRestrictive Declaration/Easement 22
08/23/2026M01020109-I1Open ↗
08/23/2026M01020109-B3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications206
▸DOB NOWProgress Inspector Seal & Signature93
09/22/2026M01020109-P7Open ↗
09/01/2026M01020109-B3Open ↗
09/01/2026M01020109-B3Open ↗
Showing 3 of 93 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature69
09/22/2026M01020109-P7Open ↗
09/01/2026M01020109-B3Open ↗
09/01/2026M01020109-B3Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/27/2026M01016512-I1Open ↗
08/27/2026M01045095-I1Open ↗
08/27/2026M01035822-I1Open ↗
Showing 3 of 43 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/18/2024141026440Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection34
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸DOB NOWStreet Tree Checklist3
08/23/2026M01020109-B3Open ↗
Showing 1 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/02/2024141026440Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/02/2024141026440Open ↗
▸BISSTREET TREE CHECKLIST1
11/18/2024141026440Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos34
▸DOB NOWOER: Notice to Proceed17
08/23/2026M01020109-I1Open ↗
08/23/2026M01020109-B3Open ↗
Showing 2 of 17 on file for this type
▸DOB NOWOER: Notice of Satisfaction12
08/23/2026M01020109-I1Open ↗
Showing 1 of 12 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026M01016512-I1Open ↗
08/27/2026M01035822-I1Open ↗
Showing 2 of 3 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
09/12/2025141026440Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
12/02/2024141026440Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
11/18/2024141026440Open ↗
11/18/2024141026440Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/18/2024141026440Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2024141026440Open ↗
▸Other Documents26
▸DOB NOWMultiple Dwelling Special District Notice to Community Board7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/27/2026M01016512-I1Open ↗
08/23/2026M01020109-I1Open ↗
08/23/2026M01020109-B3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/23/2026M01020109-B3Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
08/23/2026M01020109-I1Open ↗