LL97 Covered4 Open Violations 3 unresolved · 1 paperwork only▸
ECB11/24/2025OBSERVED THROUGHOUT THE BUILDING GYM CAPS ON WASTE LINES. FIRST AND SECOND FLOOR STANDPIPE CONNECTIONS HOSES TANGLED; BASEMENT STANDPIPE MISSING CAP; AND A CRACKED TOILET ON THE FIRST FLOOR. ON THIRD FLOOR NO F$3K due
ECB11/06/2025OBSERVED THROUGHOUT THE BUILDING NO ACCESS TO STANDPIPE CONNECTIONS. WOMEN'S BATHROOM FAUCET ON 2AN FLOOR IMPROPERLY MOUNTED. MEN'S BATHROOM ON 3RD FLOOR TOILET NOT WORKING. OUTSIDE OF BUILDING NORTH SIDE OF BU$6K due
ECB02/28/2024MISCELLANEOUS VIOLATIONS: IT IS THE OWNER'S RESPONSIBILITY TO PROVIDE INSPECTION ACCESS TO MECHANICAL SYSTEM AND PARTS THEREOF TO DETERMINE COMPLIANCE WITH MC102.3 - MAINTENANCE OF MECHANICAL SYSTEMS. AT THE TI$6K due
ECB02/07/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO ACCESS TO ROOF AND UTILITY AND MECHANICALS ROOOMS., REPAIR AND/REPLACENothing owed — awaiting certificate of correction
Hospital, sanitarium, mental institution · 779,573 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.