← Back
Predominantly retail with other uses
623 BRIGHTON BEACH AVE
BROOKLYN · BIN 3244912
💬 Discuss this project
1928Year Built
2Stories
K4Building Class
R6Zoning
3,900 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 623 BRIGHTON REALTY CORP · 2,000 sf lot · 1.95 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
623 BRIGHTON REALTY403/22/2026
CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC ARCHITECT, PC211/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS IN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAYMOND'S PLBG & HTG LLCPlumbing207/08/2026
EMPIRE ERECTORS & ELECTRIElectrical103/21/2026
MORALES, WILLIAMElectrical103/21/2026
THOMAS FASCIANELLAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600211/24/2021
Building Lifecycle
All (17)Filed (2)Permit Issued (2)Violation (4)Inspection (7)Special Inspection (2)
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/26/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/04/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/22/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/22/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/17/2022
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
05/10/2022
Permit issued — Boiler Equipment
B00635947-I1-BE
04/21/2022
Permit issued — Plumbing
B00635947-S1-PL
11/24/2021
Filed — Alteration
B00635947-S1
11/23/2021
Filed — Alteration
B00635947-I1
11/22/2021
Special inspection requirement — Heating Systems
Hackjong Choi
11/22/2021
Special inspection requirement — Maintenance information
Hackjong Choi
02/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2020
Violation issued (ECB, closed)
Construction
01/13/2017
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offRAYMOND'S PLBG & HTG LLC05/10/2022
DOB NOWPlumbingSigned-offRAYMOND'S PLBG & HTG LLC04/21/2022
BISEQISSUEDNOBEL CONSTRUCTION CORP12/24/2014
BISOTISSUEDNOBEL CONSTRUCTION CORP12/24/2014
BISPLISSUEDSMART PLBG & HTG CORP02/01/1995
BIS—ISSUEDM S P C DEVELOPMENT INC12/01/1994
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/04/2022Pass-Final Boiler Equipment InspectionPassView ↗
08/22/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/17/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/22/2021Heating SystemsHackjong Choispecial
11/22/2021Maintenance informationHackjong Choienergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/31/2026B00635947-S1Request digital key ↗
08/31/2026B00635947-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
05/24/2017321066234Open ↗
05/24/2017321066234Open ↗
05/24/2017321066234Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/16/2017321066234Open ↗
01/05/2015321066234Open ↗
▸BISWORK PERMIT APPLICATION1
12/30/2014321066234Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/31/2017321066234Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
07/31/2017321066234Open ↗
06/16/2017321066234Open ↗
01/05/2015321066234Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/31/2026B00635947-S1Open ↗
08/31/2026B00635947-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/05/2015321066234Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/05/2015321066234Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B00635947-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B00635947-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/05/2015321066234Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/31/2026B00635947-S1Open ↗
08/31/2026B00635947-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
01/05/2015321066234Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/05/2015321066234Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/31/2017321066234Open ↗
06/16/2017321066234Open ↗
01/05/2015321066234Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/31/2017321066234Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/31/2017321066234Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
07/31/2017321066234Open ↗
06/16/2017321066234Open ↗
01/05/2015321066234Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
07/03/2017321066234Open ↗
06/16/2017321066234Open ↗
▸BISEFILING COVER SHEET1
01/05/2015321066234Open ↗