623 EAST 178 STREET
BRONX · BIN 2011985
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R7-1Zoning
3,720 sfGross Floor Area
3Units
8 Open Violations 3 unresolved · 5 paperwork only ▸
Three families · 2,431 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 1 filing · 20 docs
Floor 12Under Construction18p · 1 filing · 20 docs
Floor 11Under Construction15p · 1 filing · 20 docs
Floor 10Under Construction43p · 1 filing · 20 docs
Floor 9Under Construction43p · 1 filing · 20 docs
Floor 8Under Construction48p · 1 filing · 20 docs
Floor 7Under Construction48p · 1 filing · 20 docs
Floor 6Under Construction42p · 1 filing · 20 docs
Floor 5Under Construction42p · 1 filing · 20 docs
Floor 4Under Construction42p · 1 filing · 20 docs
Floor 3Under Construction42p · 1 filing · 20 docs
Floor 2Under Construction42p · 1 filing · 20 docs
Floor 1Under Construction86p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GRUN GROUP5609/13/2026
OWNERS REP1308/29/2026
EAST 178 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/10/2025$1.1M—— → —$296/sf building
10/31/2016$461K—Private party → Private party$124/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2003/21/2026
AE DESIGN SOLUTION1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor1907/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor607/08/2026
PRIME PIPING & HEATING INFire Protection306/28/2026
JOSEPH DI GIACOMOElectrical203/21/2026
ARYEH SIMONElectrical103/21/2026
PRIME PIPING & HEATING INPlumbing106/28/2026
JOSEPH ALOIAElectrical103/21/2026
M.R. ELEC'L SERVICE LLCElectrical103/22/2026
N TECH DESIGN OF AMERICAGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161207/08/2026
VALJATO ENGINEERING PC2486105/01/2026
Building Lifecycle
All (210)Filed (27)Permit Issued (29)Signed Off (7)Violation (27)Inspection (13)Objection (74)Special Inspection (30)Tax Incentive (3)
03/15/2027
485-x construction completed
09/03/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/01/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
08/28/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/25/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/19/2026
Signed off — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01273665-I1
X01273665-S8
08/17/2026
Signed off — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01273665-I1
X01273665-S1
08/17/2026
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01284224-I1
08/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01332663-I1
08/11/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
08/11/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
08/05/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
08/05/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
08/05/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/04/2026
Signed off — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01273665-I1
X01273665-S7
08/04/2026
Objection resolved — Addressed
08/01/2026
Violation issued (ECB, open)
Construction
08/01/2026
Violation issued (ECB, open)
Unknown
07/28/2026
Violation issued (ECB, open)
Construction
07/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/08/2026
Signed off — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01273665-I1
X01273665-S4
07/08/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01273665-I1
X01273665-P8
07/08/2026
Objection raised — Other
07/02/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01273665-I1
X01273665-P6
07/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/30/2026
Violation issued (ECB, open)
Construction
06/30/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
06/15/2026
Permit issued — Sidewalk Shed
X01332592-I1-SH
06/12/2026
Permit issued — General Construction
X01273665-I1-GC
06/11/2026
Violation issued (ECB, open)
Construction
06/11/2026
Violation issued (ECB, open)
Unknown
06/11/2026
Violation issued (ECB, open)
Construction
06/11/2026
Violation issued (ECB, open)
Unknown
06/11/2026
Violation issued (ECB, closed)
Construction
06/10/2026
Filed — Alteration
X01332606-P1
06/02/2026
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01332685-P1
05/26/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01273665-I1
X01273665-P4
05/19/2026
Permit issued — Earth Work
X01273665-S4-FO-EA
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.06/15/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC06/12/2026
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC05/19/2026
DOB NOWEarth WorkSigned-offINNOVATIVE CONSTR NYC LLC05/19/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC05/12/2026
DOB NOWSupport of ExcavationPermit IssuedINNOVATIVE CONSTR NYC LLC05/08/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedINNOVATIVE CONSTR NYC LLC05/08/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC.04/28/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC04/22/2026
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC03/30/2026
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC03/30/2026
DOB NOWSupport of ExcavationPermit IssuedINNOVATIVE CONSTR NYC LLC03/25/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/20/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC03/18/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/17/2026
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/11/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC03/09/2026
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC03/06/2026
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC03/06/2026
DOB NOWSupport of ExcavationPermit IssuedINNOVATIVE CONSTR NYC LLC03/05/2026
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA03/05/2026
DOB NOWCurb CutPermit IssuedINNOVATIVE CONSTR NYC LLC02/20/2026
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC02/20/2026
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN02/18/2026
DOB NOWSprinklersPermit IssuedA M B MECHANICAL INC02/18/2026
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC02/18/2026
DOB NOWStandpipeSigned-offA M B MECHANICAL INC02/18/2026
DOB NOWStandpipeSigned-offA M B MECHANICAL INC02/18/2026
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC11/19/2025
DOB NOWFull DemolitionSigned-offINNOVATIVE CONSTR NYC LLC—
BISOTISSUEDNONE06/30/2016
BIS—ISSUEDN/A07/29/1991
1 project · most recent 07/08/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026Permit IssuedINNOVATIVE CONSTR NYC LLCHeating and Air Conditioning Systems
Heat / Cool
Amana PTH093J35 9,000 BTU · Ptac ×99
PTH153J35 14,400 BTU · Ptac ×62
PTH073J35 7,000 BTU · Ptac ×50
PTH123J35 11,600 BTU · Ptac ×39
1 project · most recent 07/08/2026
Sprinkler System
FiledStatusContractorScope
07/08/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 07/08/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/08/2026Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
7 projects · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026Permit IssuedINTELOGIC ELECTRIC, INC.—
04/27/2026Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
03/27/2026CompleteSOLAS ELECTRICAL CORP—
03/16/2026Permit IssuedSOLAS ELECTRICAL CORP—
12/18/2025CancelledS&F ELECTRICAL SERVICE INGeneral Wiring
11/17/2025CancelledHIVOLTS ELECTRICAL INCGeneral Wiring
07/25/2023CancelledJEM ELEC'L CONTR. CORPGeneral Wiring
1 project · most recent 07/08/2026
Concrete Masonry
FiledStatusContractorScope
07/08/2026Permit IssuedINNOVATIVE CONSTR NYC LLCConcrete, Masonry
3 projects · most recent 07/08/2026
Fence Sidewalk Shed
FiledStatusContractorScope
07/08/2026Permit IssuedINNOVATIVE CONSTR NYC LLCFence
05/01/2026Permit IssuedCORE SCAFFOLD SYSTEMS INCSidewalk Shed
09/11/2025Signed-offINNOVATIVE CONSTR NYC LLCFence
1 project · most recent 07/08/2026
Earthwork
FiledStatusContractorScope
07/08/2026Permit IssuedINNOVATIVE CONSTR NYC LLCEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
09/03/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
09/01/2026Pass-Final SD - Fire PumpPassView ↗
08/28/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/25/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/17/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
08/11/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
08/11/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/11/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
08/11/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
08/11/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
08/11/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
08/11/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
08/11/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
08/11/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
08/11/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
08/11/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
08/11/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/11/2026MeteringSHAHRIAR QUAYYUMenergy_progress
08/11/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/11/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
08/11/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
08/05/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
08/05/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/05/2026Standpipe SystemsSHAHRIAR QUAYYUMspecial
08/05/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
06/30/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
06/30/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/30/2026Standpipe SystemsSHAHRIAR QUAYYUMspecial
06/30/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
05/17/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 80.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/18/2026X01277119-I1Request digital key ↗
08/18/2026X01284224-I1Request digital key ↗
08/17/2026X01332663-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/10/2016220535981Open ↗
▸BISWORK PERMIT APPLICATION1
06/30/2016220535981Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWRestrictive Declaration/Easement 111
08/17/2026X01273665-P8Open ↗
08/17/2026X01273665-P6Open ↗
08/17/2026X01273665-P7Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026X01273665-I1Open ↗
08/14/2026X01273665-P4Open ↗
08/13/2026X01273665-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026X01273665-P4Open ↗
08/13/2026X01273665-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01273665-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/18/2026X01284224-I1Open ↗
08/17/2026X01332663-I1Open ↗
08/17/2026X01332685-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026X01273665-S6Open ↗
09/23/2026X01273665-S8Open ↗
09/23/2026X01273665-S5Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026X01273665-S8Open ↗
09/23/2026X01273665-S8Open ↗
09/01/2026X01273665-I1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/31/2025240363959Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/10/2016220535981Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026X01277119-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWSewer Cut-Off1
08/13/2026X01277119-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01277119-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01277119-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01277119-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026X01273665-I1—
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X01273665-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/14/2026X01273665-P4Open ↗
08/13/2026X01273665-I1Open ↗
▸BISSTREET TREE CHECKLIST1
07/01/2016220535981Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01273665-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026X01277119-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026X01277119-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/17/2026X01273665-S8Open ↗
08/17/2026X01273665-S3Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/30/2016220535981Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026X01273665-S4Open ↗
08/13/2026X01273665-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01273665-S4Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/10/2016220535981Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
10/31/2025240363959Open ↗
▸BISEFILING COVER SHEET1
06/10/2016220535981Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification3
08/18/2026X01277119-I1Open ↗
08/17/2026X01273665-I1Open ↗
08/14/2026X01273665-P4Open ↗
▸DOB NOWSite Survey: Initial2
08/14/2026X01273665-P4Open ↗
08/13/2026X01273665-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026X01273665-P4Open ↗
08/13/2026X01273665-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X01273665-S9Open ↗
08/13/2026X01273665-S4Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01277119-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01277119-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01277119-I1Open ↗