← Back
Over six families without stores
624 11 STREET
BROOKLYN · BIN 3026335
💬 Discuss this project
1912Year Built
4Stories
C1Building Class
R6BZoning
14,328 sfGross Floor Area
17Units
Rent Stabilized15 Open Violations 14 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 624 11TH ST APTS LLC · 5,000 sf lot · 2.87 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
337 11TH ST1507/08/2026
624 11TH ST APTS LLC203/22/2026
MUTUAL MGMT CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION111/06/2023
NY RESTORATION TECHNOLOGY CORP210/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
THE GREEN STUDIO103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PENTA RESTORATION CORPGeneral Contractor403/21/2026
MC SUPERSTRUCTURE INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY RESTORATION TECHNOLOGY6187210/26/2023
VERTICAL LLC8740210/26/2023
Building Lifecycle
All (52)Filed (4)Permit Issued (4)Signed Off (3)Violation (21)Objection (8)Special Inspection (12)
02/16/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00935287-I1
06/17/2025
Signed off — Alteration
Temporary shoring during brick and hung lintel replacement as per plans; no change to use, egress, or occupancy.
B00909268-S1
04/08/2025
Signed off — Alteration
Temporary shoring during brick and hung lintel replacement as per plans; no change to use, egress, or occupancy.
B00909268-I1
03/15/2024
Filed — Alteration
B01020776-I1
03/15/2024
Permit issued — Suspended Scaffold
B01020776-I1-SC
11/21/2023
Permit issued — Structural
B00909268-S1-ST
11/20/2023
Permit issued — General Construction
B00909268-I1-GC
11/06/2023
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00935287-I1
11/06/2023
Permit issued — Sidewalk Shed
B00935287-I1-SH
10/31/2023
Objection resolved — Addressed
10/31/2023
Objection resolved — Addressed
10/31/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Hamidreza Saghari
10/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Hamidreza Saghari
10/31/2023
Special inspection requirement — Masonry
Hamidreza Saghari
10/30/2023
Objection raised — Admin
10/30/2023
Objection raised — Inspections
10/30/2023
Objection resolved — Addressed
10/26/2023
Filed — Alteration
Temporary shoring during brick and hung lintel replacement as per plans; no change to use, egress, or occupancy.
B00909268-S1
10/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hamidreza Saghari
10/24/2023
Special inspection requirement — Tenant Protection Plan Compliance
MUHAMMAD HUQ
10/24/2023
Special inspection requirement — Final
Hamidreza Saghari
10/16/2023
Objection resolved — Addressed
10/13/2023
Objection raised — Scope
10/13/2023
Objection raised — Other
10/09/2023
Filed — Alteration
Temporary shoring during brick and hung lintel replacement as per plans; no change to use, egress, or occupancy.
B00909268-I1
10/06/2023
Special inspection requirement — Air barrier - visual inspection
Hamidreza Saghari
09/11/2023
Violation issued (ECB, closed)
Boilers
08/22/2023
Special inspection requirement — Tenant Protection Plan Compliance
MUHAMMAD HUQ
07/25/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Hamidreza Saghari
07/25/2023
Special inspection requirement — Masonry
Hamidreza Saghari
07/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hamidreza Saghari
07/25/2023
Special inspection requirement — Final
Hamidreza Saghari
09/09/2022
Violation issued (HPD, open)
A
09/09/2022
Violation issued (HPD, open)
A
09/09/2022
Violation issued (HPD, open)
A
06/15/2022
Violation issued (HPD, closed)
B
06/15/2022
Violation issued (HPD, closed)
C
06/15/2022
Violation issued (HPD, closed)
C
06/15/2022
Violation issued (HPD, closed)
B
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/30/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/1995
Violation issued (ECB, open)
Construction
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/1991
Violation issued (HPD, open)
C
06/17/1991
Violation issued (HPD, open)
B
06/17/1991
Violation issued (HPD, open)
C
06/17/1991
Violation issued (HPD, open)
B
06/12/1991
Violation issued (HPD, open)
B
06/12/1991
Violation issued (HPD, open)
B
06/12/1991
Violation issued (HPD, open)
B
06/12/1991
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedPENTA RESTORATION CORP03/15/2024
DOB NOWStructuralSigned-offPENTA RESTORATION CORP11/21/2023
DOB NOWGeneral ConstructionSigned-offPENTA RESTORATION CORP11/20/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC11/06/2023
1 project · most recent 09/18/2023
FiledStatusContractorScope
09/18/2023CompleteNASH ELECTRIC SERVICES IN—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/31/2023Construction Operations Influencing Adjacent StructuresHamidreza Sagharispecial
10/31/2023Energy Code Compliance InspectionsHamidreza Saghariprogress
10/31/2023MasonryHamidreza Sagharispecial
10/24/2023Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
10/24/2023Tenant Protection Plan ComplianceMUHAMMAD HUQspecial
10/24/2023FinalHamidreza Saghariprogress
10/06/2023Air barrier - visual inspectionHamidreza Sagharienergy_progress
08/22/2023Tenant Protection Plan ComplianceMUHAMMAD HUQspecial
07/25/2023Construction Operations Influencing Adjacent StructuresHamidreza Sagharispecial
07/25/2023MasonryHamidreza Sagharispecial
07/25/2023Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
07/25/2023FinalHamidreza Saghariprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00909268-I1Request digital key ↗
08/26/2026B00909268-S1Request digital key ↗
08/26/2026B00935287-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit2
08/13/2026B00909268-I1Open ↗
08/13/2026B00909268-S1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/20/2015321169560Open ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature5
08/25/2026B00909268-S1Open ↗
08/25/2026B00909268-S1Open ↗
08/25/2026B00909268-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026B00909268-S1Open ↗
08/25/2026B00909268-S1Open ↗
08/24/2026B00909268-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026B00909268-I1Open ↗
08/26/2026B00909268-S1Open ↗
08/26/2026B00935287-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/20/2015321169560Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/20/2015321169560Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/20/2015321169560Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00909268-I1Open ↗
08/26/2026B00909268-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/20/2015321169560Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/21/2015321169560Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLANDMARKS APPROVAL1
07/20/2015321169560Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/20/2015321169560Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/20/2015321169560Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/20/2015321169560Open ↗
▸Other Documents3
▸DOB NOWManufacturer's Specifications1
08/13/2026B01020776-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00909268-S1Open ↗
▸DOB NOWCalculations1
08/13/2026B01020776-I1Open ↗