Zoned commercial or Manhattan residential
624 METROPOLITAN AVENUE
BROOKLYN · BIN 3429084
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R7AZoning
0 sfGross Floor Area
0Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: 624 METROPOLITAN LLC · 2,500 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalFire ProtectionEquipmentCivil
Roof6p · 2 filings · 12 docs
Bulkhead1p · 1 filing · 3 docs
Floor 73p · 1 filing · 10 docs
Floor 63p · 1 filing · 10 docs
Floor 53p · 1 filing · 10 docs
Floor 43p · 1 filing · 10 docs
Floor 33p · 1 filing · 10 docs
Floor 22p · 1 filing · 10 docs
Floor 11p · 1 filing · 10 docs
Cellar2p · 1 filing · 10 docs
6 jobs · most recent 12/01/2025
General Wiring
FiledStatusContractorScope
12/01/2025CancelledPOWER DIRECT ELECTRIC INCGeneral Wiring
12/01/2025CancelledPOWER DIRECT ELECTRIC INC—
05/21/2025CompletePOWER DIRECT ELECTRIC INC—
05/01/2025CompleteM.R. ELEC'L SERVICE LLCGeneral Wiring
01/08/2025CompleteNASH ELECTRIC SERVICES IN—
10/03/2019CompleteRICHARD NEU—
1 job · most recent 09/20/2023
FiledStatusContractorScope
09/20/2023——1 scope_items
Building Lifecycle
All (159)Filed (23)Permit Issued (23)Signed Off (14)Violation (17)Inspection (3)Objection (49)Special Inspection (30)
03/23/2026
Signed off — Alteration
Filling for installation of engineered enclosure system per 3309.17
B01140275-I1
03/12/2026
Permit issued — Protection and Mechanical Methods
B01140275-I1-PMM
02/19/2026
Violation issued (FDNY_NOV, closed)
02/19/2026
Violation issued (FDNY_NOV, closed)
11/19/2025
Signed off — Alteration
SPRINKLER WORK TYPE FILED IN CONJUNCTION WITH NB APPLICATION 321386380.
B00340129-I1
11/12/2025
Signed off — Alteration
Foundation and earthwork filed in conjunction with DOB BIS #321386380
B00982654-I1
10/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN
B00239983-I1
10/23/2025
Signed off — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01227130-I1
08/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/15/2025
Signed off — Alteration
Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01162559-I1
07/15/2025
Signed off — Alteration
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01165476-I1
07/15/2025
Signed off — Alteration
B00521437-I1
07/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/11/2025
Permit issued — Construction Fence
B00521437-I1-FN
07/10/2025
Signed off — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01162640-I1
07/10/2025
Signed off — Alteration
B00287696-I1
07/10/2025
Signed off — Alteration
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01162646-I1
07/05/2025
Violation issued (ECB, closed)
Construction
06/26/2025
Special inspection requirement — Sprinkler Systems
Paul Raymond
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/25/2025
Filed — Alteration
SPRINKLER WORK TYPE FILED IN CONJUNCTION WITH NB APPLICATION 321386380.
B00340129-P2
06/23/2025
Signed off — Alteration
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01162579-I1
06/16/2025
Violation issued (ECB, closed)
Unknown
06/09/2025
Signed off — Alteration
Underpinning work type filed in conjunction with NB #321386380
B00983929-I1
06/09/2025
Signed off — Alteration
SOE filed in conjunction with DOB BIS #321386380
B00982701-I1
05/21/2025
Permit issued — Suspended Scaffold
B01227130-I1-SC
05/19/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01227130-I1
05/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
05/05/2025
Permit issued — Sprinklers
B00340129-I1-EW-SP
04/07/2025
Permit issued — Support of Excavation
B00982701-I1-SE
03/05/2025
Permit issued — Foundation
B00982654-I1-FO-EA
02/25/2025
Permit issued — Foundation
B00983929-I1-FO
02/24/2025
Permit issued — Sidewalk Shed
B01165476-I1-SF
02/24/2025
Permit issued — Sidewalk Shed
B01165476-I1-SH
02/21/2025
Filed — Alteration
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01165476-I1
01/08/2025
Filed — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01162640-I1
01/08/2025
Permit issued — Protection and Mechanical Methods
B01162579-I1-PMM
01/08/2025
Permit issued — Supported Scaffold
B01162559-I1-SH
01/08/2025
Permit issued — Protection and Mechanical Methods
B01162646-I1-PMM
01/08/2025
Permit issued — Sidewalk Shed
B01162559-I1-SF
01/08/2025
Permit issued — Protection and Mechanical Methods
B01162640-I1-PMM
01/07/2025
Filed — Alteration
Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01162559-I1
01/07/2025
Filed — Alteration
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01162646-I1
01/07/2025
Filed — Alteration
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01162579-I1
12/12/2024
Objection raised — Other
12/12/2024
Objection resolved — Addressed
12/02/2024
Filed — Alteration
Filling for installation of engineered enclosure system per 3309.17
B01140275-I1
10/29/2024
Violation issued (ECB, closed)
Construction
10/15/2024
Permit issued — Construction Fence
B00287696-I1-FN
09/13/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
09/13/2024
Special inspection requirement — Footing and Foundation
Paul Raymond
09/13/2024
Special inspection requirement — Final
Paul Raymond
09/13/2024
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
09/13/2024
Special inspection requirement — Subgrade Inspections
Paul Raymond
09/13/2024
Special inspection requirement — Deep Foundation Elements
Paul Raymond
09/12/2024
Objection raised — Scope
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
Latest 60 of 159 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SMART CONSULTING NY404/09/2026
SUCCESS DEVELOPERS403/22/2026
AMERISTAR CONSTRUCTION LL403/22/2026
TITAN REALTY CONSTRUCTI103/22/2026
RED THUMB DEVELOPMENT703/22/2026
RENNON CONSTRUCTION403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/24/2023$3.7M—RED THUMB DEVELOPMENT, LLC → 624 METROPOLITAN LLC— not available
01/25/2016$2.8M—Private party → RED THUMB DEVELOPMENT, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNSHINE PLAZA LLC1203/21/2026
DEMOWORKS EXPEDITING203/21/2026
CB EXPEDITING203/21/2026
Rigid Structural Design, LLC403/21/2026
SIERRA SAFETY CORP203/21/2026
JAM CONSULTANTS, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUCCESS DEVELOPERS LLCGeneral Contractor1907/02/2026
PRECISION HOIST & SCAFFO*General Contractor1407/02/2026
TITAN REALTY & CONSTRUCTIGeneral Contractor1007/02/2026
TOVIA WERZBERGERElectrical203/21/2026
M R ELECL SERVICE LLC 003912General Contractor203/22/2026
TARGET PIPING NY LLCFire Protection107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941006/25/2025
URBAN INTEGRATIONS LLC7993105/19/2025
PROJECT TACTICAL SOLUTION5859111/16/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offSUCCESS DEVELOPERS LLC03/12/2026
DOB NOWConstruction FenceSigned-offSUCCESS DEVELOPERS LLC07/11/2025
DOB NOWSuspended ScaffoldSigned-offPRECISION HOIST & SCAFFO*05/21/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC05/05/2025
DOB NOWSupport of ExcavationSigned-offSUCCESS DEVELOPERS LLC04/07/2025
DOB NOWFoundationSigned-offSUCCESS DEVELOPERS LLC03/05/2025
DOB NOWFoundationSigned-offSUCCESS DEVELOPERS LLC02/25/2025
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*02/24/2025
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*02/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*01/08/2025
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*01/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*01/08/2025
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*01/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*01/08/2025
DOB NOWConstruction FenceSigned-offSUCCESS DEVELOPERS LLC10/15/2024
DOB NOWSupport of ExcavationSigned-offSUCCESS DEVELOPERS LLC03/21/2024
DOB NOWEarth WorkSigned-offSUCCESS DEVELOPERS LLC03/06/2024
DOB NOWFoundationSigned-offSUCCESS DEVELOPERS LLC03/04/2024
DOB NOWConstruction FenceSigned-offSUCCESS DEVELOPERS LLC10/19/2023
DOB NOWConstruction FenceSigned-offTITAN REALTY & CONSTRUCTI04/10/2023
DOB NOWConstruction FenceSigned-offTITAN REALTY & CONSTRUCTI04/22/2022
DOB NOWConstruction FenceSigned-offTITAN REALTY & CONSTRUCTI04/08/2022
DOB NOWConstruction FenceSigned-offTITAN REALTY & CONSTRUCTI03/02/2022
BIS—ISSUEDSUCCESS DEVELOPERS LLC12/11/2025
BIS—ISSUEDSUCCESS DEVELOPERS LLC05/08/2025
BISPLISSUEDB&B MECH PLBG & HTG LLC04/22/2025
BIS—ISSUEDSUCCESS DEVELOPERS LLC11/28/2024
BIS—ISSUEDSUCCESS DEVELOPERS LLC02/29/2024
BIS—ISSUEDSUCCESS DEVELOPERS LLC12/28/2023
BIS—ISSUEDSUCCESS DEVELOPERS LLC11/29/2023
BIS—ISSUEDTITAN REALTY & CONSTRUCTI06/23/2023
BIS—ISSUEDTITAN REALTY & CONSTRUCTI04/10/2023
BIS—ISSUEDTITAN REALTY & CONSTRUCTI02/28/2023
BIS—ISSUEDTITAN REALTY & CONSTRUCTI06/01/2022
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
06/26/2025Sprinkler SystemsPaul Raymondspecial
06/26/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
05/16/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
09/13/2024Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
09/13/2024Footing and FoundationPaul Raymondprogress
09/13/2024FinalPaul Raymondprogress
09/13/2024Concrete - Cast-In-PlacePaul Raymondspecial
09/13/2024Subgrade InspectionsPaul Raymondspecial
09/13/2024Deep Foundation ElementsPaul Raymondspecial
09/12/2024Post-installed AnchorsPaul Raymondspecial
09/12/2024Subsurface Conditions – Fill Placement & In-Place DensityPaul Raymondspecial
09/12/2024Underpinning and alternate methods of support of buildings and adjacent propertyPaul Raymondspecial
09/12/2024Subgrade InspectionsPaul Raymondspecial
09/12/2024Structural Steel - WeldingPaul Raymondspecial
09/12/2024Excavations - Sheeting, Shoring, and BracingPaul Raymondspecial
09/12/2024Concrete - Cast-In-PlacePaul Raymondspecial
09/12/2024Underpinning and alternate methods of support of buildings and adjacent propertyPaul Raymondspecial
09/12/2024Subsurface Conditions – Fill Placement & In-Place DensityPaul Raymondspecial
09/12/2024Footing and FoundationPaul Raymondprogress
09/12/2024FinalPaul Raymondprogress
09/06/2024Footing and FoundationPaul Raymondprogress
09/06/2024Concrete - Cast-In-PlacePaul Raymondspecial
09/06/2024Subsurface Conditions – Fill Placement & In-Place DensityPaul Raymondspecial
09/06/2024Underpinning and alternate methods of support of buildings and adjacent propertyPaul Raymondspecial
09/06/2024FinalPaul Raymondprogress
Latest 25 of 49.
▾Documents — 300 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch17
09/01/2026B00521437-I1Request digital key ↗
08/26/2026B00983929-P1Request digital key ↗
08/26/2026B00983929-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/26/2026B00340129-P2Request digital key ↗
08/26/2026B00340129-I1Request digital key ↗
08/14/2026B00340129-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00239983-I1Request digital key ↗
08/15/2026B00239983-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00287696-I1Request digital key ↗
▸Applications & Permits44
▸BISPLAN / WORK APPROVAL APPLICATION33
07/25/2025321386380Open ↗
07/25/2025321386380Open ↗
07/09/2025321386380Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION7
04/22/2025321386380Open ↗
03/01/2024321386380Open ↗
12/29/2023321386380Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
07/03/2025321386380Open ↗
07/02/2025321386380Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/14/2019322011719Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
10/06/2022321386380Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM4
06/27/2025321386380Open ↗
04/03/2024321386380Open ↗
04/03/2024321386380Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/03/2024321386380Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
11/25/2020321386380Open ↗
▸BISVERIFY TAX LOT1
05/29/2025321386380Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/03/2024321386380Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/26/2025321386380Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/03/2024321386380Open ↗
▸Seals & Professional Certifications75
▸DOB NOWSpecial Inspector Seal & Signature36
09/30/2026B00982654-P1Open ↗
09/30/2026B00982654-P1Open ↗
09/30/2026B00982654-P1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/01/2026B00521437-I1Open ↗
08/26/2026B00983929-I1Open ↗
08/26/2026B00982701-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/30/2026B00982654-P1Open ↗
09/30/2026B00982654-P1Open ↗
08/29/2026B00983929-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/11/2025321386380Open ↗
06/07/2022321386380Open ↗
06/07/2022321386380Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING4
07/25/2025321386380Open ↗
07/09/2025321386380Open ↗
07/07/2025321386380Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
01/27/2026321386380Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/09/2025321386380Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/16/2025321386380Open ↗
▸BISEQUIPMENT USE PERMITS1
10/16/2025321386380Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
04/20/2022321386380Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST4
04/03/2024321386380Open ↗
09/14/2023322011719Open ↗
06/10/2020321386380Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026B00239983-P1Open ↗
08/13/2026B00239983-I1Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/06/2022321386380Open ↗
▸BISSTREET TREE SIGNOFF1
08/04/2025321386380Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/22/2025321386380Open ↗
▸Environmental & Asbestos14
▸DOB NOWOER: Notice to Proceed8
08/26/2026B00983929-I1Open ↗
08/13/2026B00982701-I1Open ↗
08/13/2026B00983929-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026B00983929-I1Open ↗
08/13/2026B00982654-I1Open ↗
08/13/2026B00982701-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
12/12/2025321386380Open ↗
11/17/2025322011719Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
06/10/2020321386380Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
12/15/2025321386380Open ↗
10/16/2025321386380Open ↗
03/05/2025321386380Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/11/2025321386380Open ↗
06/07/2022321386380Open ↗
06/07/2022321386380Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/16/2025321386380Open ↗
▸BISEXTERIOR LIGHTING POWER1
03/05/2025321386380Open ↗
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY23
12/23/2025321386380Open ↗
10/16/2025321386380Open ↗
10/16/2025321386380Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSOIL REPORT3
08/13/2026B00982654-P2Open ↗
08/13/2026B00982654-P1Open ↗
08/13/2026B00982654-I1Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/22/2025321386380Open ↗
06/07/2022321386380Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
10/06/2022321386380Open ↗
06/07/2022321386380Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/10/2020321386380Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
12/23/2025321386380Open ↗
▸BISSOIL REPORT1
06/10/2020321386380Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B00982654-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00982654-I1Open ↗
▸Approvals, Objections & Sign-offs23
▸BISSCHEDULE A - OCCUPANCY / USE13
07/25/2025321386380Open ↗
04/24/2025321386380Open ↗
09/12/2023321386380Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/11/2025321386380Open ↗
12/29/2023321386380Open ↗
12/01/2023321386380Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
05/06/2020321386380Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/03/2025322011719Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
12/07/2023321386380Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
09/30/2025321386380Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
07/14/2020321386380Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE5
03/01/2024321386380Open ↗
12/29/2023321386380Open ↗
12/01/2023321386380Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION20
12/26/2025321386380Open ↗
12/26/2025321386380Open ↗
12/22/2025321386380Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET5
11/14/2019322011719Open ↗
03/29/2019321386380Open ↗
03/29/2019321386380Open ↗
Showing 3 of 5 on file for this type
▸Other Documents12
▸BISPLOT DIAGRAM4
08/23/2023321386380Open ↗
07/17/2023321386380Open ↗
07/05/2023321386380Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
12/22/2025321386380Open ↗
04/03/2024321386380Open ↗
06/07/2022321386380Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00982654-I1Open ↗
08/13/2026B00982701-I1Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
03/05/2025321386380Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01227130-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01227130-I1Open ↗