← Back
Walk-up apt, over six families with stores
625 LENOX AVENUE
MANHATTAN · BIN 1060091
💬 Discuss this project
1910Year Built
6Stories
C7Building Class
R7-2Zoning
14,853 sfGross Floor Area
16Units
Rent Stabilized28 Open Violations 22 unresolved · 6 paperwork only ▸FISP: No Report Filed
Walk-up apt, over six families with stores · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 4,000 sf lot · 3.71 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof1p · 1 filing · 4 docs
Floor 61p · 1 filing · 9 docs
Floor 51p · 1 filing · 9 docs
Floor 41p · 1 filing · 9 docs
Floor 32p · 2 filings · 11 docs
Floor 22p · 2 filings · 11 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE3807/08/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
WHGA LENOX HOUSING1103/22/2026
C/O WEST HARLEM GROUP ASS103/22/2026
HOUSING PRESERVATION DEVELOP2103/22/2026
H.P.D. 8103/22/2026
H.P.D 80103/22/2026
HOUSING PRESERVATION &806203/22/2026
WHGA LENOX HOUSING ASSC C103/22/2026
J&G CONSTRUCTION INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC1112/19/2025
ASHRAF CORP204/30/2025
SYNERGIC DESIGN ARCHITECTS101/13/2025
ARQUITECTURA VARELA110/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC2203/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AP. TEK RESTORATION INCGeneral Contractor707/08/2026
HORIZON CONSTRUCTION INCGeneral Contractor404/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing307/08/2026
ALPHA SCAFFOLDING INCGeneral Contractor204/09/2026
ACCORD POWER INCGeneral Contractor203/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING49831107/25/2025
SYNERGIC DESIGN LLC8561101/13/2025
Building Lifecycle
All (132)Filed (15)Permit Issued (15)Signed Off (7)Facade (FISP) (9)Violation (60)Inspection (5)Objection (4)Special Inspection (17)
04/29/2026
Violation issued (HPD, closed)
A
04/01/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047579-S1
02/12/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047579-S2
02/12/2026
Violation issued (HPD, open)
A
02/12/2026
Violation issued (HPD, open)
A
02/12/2026
Violation issued (HPD, open)
B
02/12/2026
Violation issued (HPD, open)
A
02/12/2026
Violation issued (HPD, open)
B
02/12/2026
Violation issued (HPD, open)
B
02/12/2026
Violation issued (HPD, closed)
C
01/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2026
Signed off — Alteration
Interior work at common space of building and roof. All Exterior work is as per plan. No change to use, egress, or occupancy under this filing.
M00826916-I1
01/22/2026
Signed off — Alteration
Replace and relocate plumbing fixtures at kitchen bath per revised layout at apt 1A. No change in use egress or occupancy.
M01054827-I1
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
01/02/2026
Violation issued (HPD, closed)
B
01/02/2026
Violation issued (HPD, closed)
C
12/19/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047579-P3
10/17/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/16/2025
Permit issued — General Construction
M00826916-I1-GC
10/16/2025
Permit issued — General Construction
M01054827-I1-GC
10/11/2025
Signed off — Alteration
M01120914-I1
10/11/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01215623-I1
09/29/2025
Permit issued — Boiler Equipment
M01047579-I1-BE
09/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2025
Permit issued — Boiler Equipment
M01047579-S2-BE
08/12/2025
Violation issued (HPD, closed)
C
08/12/2025
Violation issued (HPD, open)
B
08/12/2025
Violation issued (HPD, open)
B
07/25/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047579-P2
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
07/14/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047579-S2
07/14/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047579-P1
07/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
07/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
07/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
07/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
06/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/08/2025
Signed off — Alteration
Installation of 8.8 kw solar energy system on roof. No change of occupancy, use or egress.
M01127880-I1
05/01/2025
Permit issued — Supported Scaffold
M01215623-I1-SF
04/30/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01215623-I1
03/21/2025
Permit issued — Plumbing
M01047579-S1-PL
02/13/2025
Permit issued — Solar
M01127880-I1-SL
01/13/2025
Filed — Alteration
Installation of 8.8 kw solar energy system on roof. No change of occupancy, use or egress.
M01127880-I1
12/16/2024
Violation issued (HPD, closed)
C
12/16/2024
Violation issued (HPD, closed)
A
12/16/2024
Violation issued (HPD, closed)
A
12/16/2024
Violation issued (HPD, closed)
C
12/16/2024
Violation issued (HPD, closed)
A
12/16/2024
Violation issued (HPD, closed)
A
12/16/2024
Violation issued (HPD, closed)
A
12/16/2024
Violation issued (HPD, open)
B
12/16/2024
Violation issued (HPD, closed)
A
12/16/2024
Violation issued (HPD, closed)
C
12/04/2024
Violation issued (HPD, open)
B
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/16/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/16/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.09/29/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.08/25/2025
DOB NOWSupported ScaffoldSigned-offALPHA SCAFFOLDING INC05/01/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/21/2025
DOB NOWSolarSigned-offACCORD POWER INC02/13/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC11/15/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/25/2024
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC10/04/2024
DOB NOWSidewalk ShedPermit IssuedAP. TEK RESTORATION INC03/29/2024
DOB NOWSidewalk ShedPermit IssuedAP. TEK RESTORATION INC08/28/2023
DOB NOWSidewalk ShedPermit IssuedAP. TEK RESTORATION INC05/13/2022
DOB NOWSidewalk ShedPermit IssuedAP. TEK RESTORATION INC07/28/2021
DOB NOWSidewalk ShedPermit IssuedAP. TEK RESTORATION INC06/28/2020
BISOTISSUEDAP. TEK RESTORATION INC11/23/2011
BISEQISSUEDJ & G GNRL CONTRACT CORP11/15/2011
BIS—ISSUEDPYTHAZOGRAS GENERAL CONSTRUCTION04/27/2004
BISEQISSUEDPYTHAZOGRAS GENERAL CONSTRUCTION04/21/2004
BISEQISSUEDPYTHAZOGRAS GENERAL CONSTRUCTION01/07/2004
BISPLISSUEDPVTHAGORAS GENE. CONTR. CORP.09/17/2003
BISOTISSUEDBARNETT_IRON_ASSOCIATE_LTD11/05/1999
BISOTISSUEDEASTERN GENERAL CONSTRUCT10/01/1999
BISFPISSUEDMASTER FIRE PERVENTION SYSTEMS I10/10/1995
BISPLISSUEDA & A ASSO INC01/19/1994
BISOTISSUEDS F CONTRACTOR06/23/1993
2 projects · most recent 12/19/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/19/2025Signed-offAMERICAN STANDARD P&H CORGas
06/14/2024——Gas, Water/Sanitary
2 projects · most recent 01/08/2025
FiledStatusContractorScope
01/08/2025CompleteACCORD POWER ELECTRIC LLC—
10/04/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/17/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/06/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/15/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
07/15/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/15/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
07/15/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
07/15/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
07/03/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
07/03/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
07/03/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
07/03/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/25/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/07/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
06/07/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
05/21/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/21/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/21/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/21/2024FinalALEXIS SCHLESSINGERMANprogress
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
08/27/2026M00826916-P1Request digital key ↗
08/27/2026M00826916-I1Request digital key ↗
08/27/2026M01055860-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00356326-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
11/22/2011120900418Open ↗
11/17/2011120888254Open ↗
▸BISWORK PERMIT APPLICATION2
11/26/2011120900418Open ↗
11/17/2011120888254Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/04/2026M00356326-I1Open ↗
08/27/2026M01055860-I1Open ↗
08/27/2026M01054827-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/27/2026M01054827-I1Open ↗
09/23/2026M01047579-I1Open ↗
09/23/2026M01047579-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/27/2026M01054827-I1Open ↗
09/23/2026M01047579-I1Open ↗
09/23/2026M01047579-S2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/22/2011120900418Open ↗
11/17/2011120888254Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/22/2011120900418Open ↗
11/17/2011120888254Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/22/2011120900418Open ↗
11/17/2011120888254Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00356326-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026M01055860-I1Open ↗
08/27/2026M01054827-S1Open ↗
08/27/2026M01054827-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/22/2011120900418Open ↗
11/22/2011120900418Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/22/2026M01047579-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/13/2026M01047579-P1Open ↗
08/13/2026M01047579-P2Open ↗
08/13/2026M01054827-I1Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
11/22/2011120900418Open ↗
11/17/2011120888254Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M01127880-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/22/2011120900418Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
11/22/2011120900418Open ↗
11/17/2011120888254Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M00826916-I1Open ↗
08/13/2026M00826916-P1Open ↗