HPD05/23/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE KITCHEN LOCATED AT APT C17C, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD05/23/2026§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT C17C, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD07/01/2019§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL. IN THE BATHROOM LOCATED AT APT C6A, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH
ECB07/23/2026Reissue: 35693497R-failure to maintain building in code-compliant manner. Outside exit #8 is bent and loose due to cars parking illegal and bumping into the rails. Remedy: comply with code.Nothing owed — awaiting certificate of correction
ECB07/23/2026Reissue#35693496P exit door not self-closing.exit#9 and stair bulkheadnot closing properly.rem:comply with code.Nothing owed — awaiting certificate of correction
ECB10/03/2025Exit door not self-closing. Noted exterior door at exit #9 and stair abulkhead roof across not self-closing when tested. Remedy: repair/replace door.Nothing owed — awaiting certificate of correction
ECB10/03/2025Reissue #35684839N. Failure to maintain building in code-compliant manner. Noted handrail outside of exit #8 was bent, loose and leaning. Remedy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB09/16/2024Reissue #35674915R. Failure to maintain building in code-compliant manner. At time of my inspection, i observed the handrail outside exit 8 is loose and chalky near the top weed to make necessary repair or replNothing owed — awaiting certificate of correction
ECB07/07/2023Failure to maintain building in code compliant manner. Noted: the handrail outside exit 8 is loose and shaky near the top. Remedy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB11/22/2011Failure to maintain building in code compliant manner:(1)west wall water penetration-concrete cracking,exposed rust rebar(2)ceiling cracking, exposed rebar throughout(3) 2 & 3 flr exit doors-hardware not operatNothing owed — awaiting certificate of correction
ECB01/27/2010Failure to file an architect/engineer report certifying exit/directional signs are connected to emergency power source/storage battery equipment.rem:file architect/engineer reportNothing owed — awaiting certificate of correction
ECB01/22/2010Roof access soors have sliding bolt locks which can receive a padlock remedy:remove illegal hardwareNothing owed — awaiting certificate of correction
ECB10/29/2009Failure to maintain bldg walls or appurtenances note : roof of above premises has become porous & is leaking causing damage to the ceiling and walls below in rooms 308 and 371. Remedy: repair leaking roof. MainNothing owed — awaiting certificate of correction
ECB10/23/2009Failure to maintain building in code-compliant manner. Note: at sub-cellar level 1 to 5 various step cracks & vertical cracks in west masonry wall. Concrete ceiling spalling & large pieces missing exposing rebaNothing owed — awaiting certificate of correction
ECB09/25/2007Reissue #34526280L structural vertical & horizontal stress crack throughout interior walls.remedy obtain engineers report for structual stability make all necessary repairsNothing owed — awaiting certificate of correction
ECB05/19/2006Failure to maintain building - interior structural cracking verticle and horizontal causing lateral movement throughout entire building. Reissue#34198578Y,#34282760M.remedy:obtain a structural integrity letter.Nothing owed — awaiting certificate of correction
ECB03/22/2001Failure to maintain: defects are vertical & horizontal stress cracks on corridor walls on all floors. Remedy: make all repairs.Nothing owed — awaiting certificate of correction